You are here

Categorical Exclusion Determinations: Texas

Location

Categorical Exclusion Determinations issued for actions in Texas.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • April 24, 2014

    Pantex Lake Land Utilization
    CX(s) Applied: B1.11
    Date: 11/05/2013
    Location(s): Texas
    Offices(s): Pantex Site Office

  • March 13, 2014

    Big Hill Anhydrite Pond Sampling and Analysis
    CX(s) Applied: B3.1
    Date: 09/23/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 17, 2013

    Bryan Mound Substation Upgrade to 138 Kilovolts
    CX(s) Applied: B1.3
    Date: 12/17/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 16, 2013

    Module-Integrated Power Converters Based on Universal Dock
    CX(s) Applied: A9, B3.6, B5.16
    Date: 12/16/2013
    Location(s): Texas
    Offices(s): Golden Field Office

  • December 2, 2013

    Advanced Direct-Drive Generator for Improved Availability of Oscillating Wave Surge Converter Power Generation Systems
    CX(s) Applied: A9, B3.6
    Date: 12/02/2013
    Location(s): North Carolina, Texas, Massachusetts
    Offices(s): Golden Field Office

  • November 18, 2013

    Mixed Metal Phosphonate: Phosphate Resins for Separation of Lanthanides from Actinides
    CX(s) Applied: B3.6
    Date: 11/18/2013
    Location(s): Texas
    Offices(s): Idaho Operations Office

  • November 6, 2013

    NNSA Utility Communications Easement
    CX(s) Applied: B1.24, B4.13
    Date: 11/06/2013
    Location(s): Texas
    Offices(s): Pantex Site Office

  • November 6, 2013

    Development and Demonstration of Self-Expanding Well Construction
    CX(s) Applied: A9, B3.6
    Date: 11/06/2013
    Location(s): Texas
    Offices(s): Golden Field Office

  • November 5, 2013

    Vortex Induced Vibration Study for Deep Draft Column Stabilized Floaters
    CX(s) Applied: A9, A11
    Date: 11/05/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • November 5, 2013

    Vortex Induced Vibration Study for Deep Draft Column Stabilized Floaters
    CX(s) Applied: A9, A11
    Date: 11/05/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • November 4, 2013

    Texas Alternative Fuel Vehicle Pilot Program
    CX(s) Applied: A1, B5.22
    Date: 11/04/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • November 4, 2013

    Pilot Test of a Nanoporous, Super-Hydrophobic Membrane Contactor Process for Post-Combustion Carbon Dioxide (CO2)...
    CX(s) Applied: A1, A9, B3.6
    Date: 11/04/2013
    Location(s): Alabama, Massachusetts, Texas, New Jersey, Illinois
    Offices(s): National Energy Technology Laboratory

  • October 31, 2013

    Replacement of Big Hill TX-14 Transformer, Government Furnished Equipment
    CX(s) Applied: B1.3
    Date: 10/31/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 30, 2013

    Investigation of “Smart Parts” with Embedded Sensors for Energy System Applications
    CX(s) Applied: B3.6
    Date: 10/30/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • October 28, 2013

    Bryan Mound Brine Disposal Pump Replacement (Install)
    CX(s) Applied: B5.2
    Date: 10/28/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 22, 2013

    University of Houston--Aqueous Lithium-Ion Batteries with High-Energy Novel Organic Anodes for Safe and Robust Energy Storage
    CX(s) Applied: B3.6
    Date: 10/22/2013
    Location(s): Texas, Texas
    Offices(s): Advanced Research Projects Agency-Energy

  • October 1, 2013

    Evaluation of Deep Subsurface Resistivity Imaging for Hydrofracture Monitoring
    CX(s) Applied: A9, A11, B3.6
    Date: 10/01/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • October 1, 2013

    Replacement of Deep-Anode Ground Bed Sites for Big Hill Cavern 104 and Site Unit 1 “A”, and BC Cavern 18
    CX(s) Applied: B1.3
    Date: 10/01/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 30, 2013

    Real-Time In-Situ Carbon Dioxide Monitoring (RICO2M) Network for Sensitive Subsurface...
    CX(s) Applied: A11, B4.6
    Date: 09/30/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 26, 2013

    Safety, Health, and Environmental Improvements for FY2014 and FY2015
    CX(s) Applied: B2.1, B2.2, B2.3, B2.5
    Date: 09/26/2013
    Location(s): Texas
    Offices(s): Pantex Site Office

  • September 26, 2013

    Site Characterization, Monitoring, and General Research Activities for Pantex Plant for FY 2014
    CX(s) Applied: B3.1, B3.3, B3.6, B3.8
    Date: 09/26/2013
    Location(s): Texas
    Offices(s): Pantex Site Office

  • September 26, 2013

    Mechanisms for Methane Transport and Hydrate Accumulation in Coarse-Grained Sediments
    CX(s) Applied: A9
    Date: 09/26/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 25, 2013

    Environmental Restoration and Waste Management Activities for Pantex Plant for FY 2014
    CX(s) Applied: B6.1, B6.2
    Date: 09/25/2013
    Location(s): Texas
    Offices(s): Pantex Site Office

  • September 25, 2013

    Hybrid Membrane-Absorption Carbon Dioxide (CO2) Capture Process
    CX(s) Applied: B3.6
    Date: 09/25/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 16, 2013

    Thermal-Hydrological-Chemical-Mechanical (THCM) Coupled Model for Hydrate-Bearing Sediments: Data Analysis and Design of New Field Experiments
    CX(s) Applied: A9
    Date: 09/16/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory