You are here

Categorical Exclusion Determinations: Texas

Location

Categorical Exclusion Determinations issued for actions in Texas.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • September 11, 2013

    Distributed Fiber Optic Arrays: Integrated Temperature and Seismic Sensing for Detection of Carbon Dioxide Flow..
    CX(s) Applied: A1, A9
    Date: 09/11/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 11, 2013

    Coil Tubing (CT) Drilling and Intervention System Using Cost-Effective Vessels
    CX(s) Applied: A9
    Date: 09/11/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 10, 2013

    High Energy, Long Cycle Life Lithium-ion Batteries for PHEV Applications
    CX(s) Applied: B3.6
    Date: 09/10/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 4, 2013

    High Power Laser Tool and System for Unique Geothermal Well Completions
    CX(s) Applied: A9, B3.6
    Date: 09/04/2013
    Location(s): Colorado, Texas
    Offices(s): Golden Field Office

  • September 4, 2013

    Energy Efficiency and Conservation Block Grant - City of Houston, Texas
    CX(s) Applied: B5.1
    Date: 09/04/2013
    Location(s): Texas
    Offices(s): Golden Field Office

  • August 29, 2013

    Pressure-Based Inversion and Data Assimilation System (PIDAS) for Carbon Dioxide Leakage Detection
    CX(s) Applied: A1, A9, B3.6
    Date: 08/29/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 28, 2013

    Intelligent Blow Out Preventers RAM Actuation Sensor System
    CX(s) Applied: A9, B3.6
    Date: 08/28/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 27, 2013

    Closure Turf Installation
    CX(s) Applied: B6.1
    Date: 08/27/2013
    Location(s): Texas
    Offices(s): Pantex Site Office

  • August 23, 2013

    Predictive Large Eddy Simulation (LES) Modeling and Validation for High-Pressure Turbulent Flames and Flashback in Hydrogen-Enriched Gas Turbine
    CX(s) Applied: A9, B3.6
    Date: 08/23/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 22, 2013

    Smart and Calibrated Pig Surveys of Strategic Petroleum Reserve Raw Water/Crude Oil Pipelines
    CX(s) Applied: B1.3
    Date: 08/22/2013
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 21, 2013

    A Geomechanical Model for Gas Shales Based on Integration of Stress
    CX(s) Applied: A9
    Date: 08/21/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 15, 2013

    Industrial Scale Demonstration of Smart Manufacturing Achieving Transformational Energy Productivity Gains
    CX(s) Applied: A9, B2.2, B2.5
    Date: 08/15/2013
    Location(s): Texas
    Offices(s): Golden Field Office

  • August 14, 2013

    Gulf of Mexico Miocene Carbon Dioxide (CO2) Site Characterization Mega Transect
    CX(s) Applied: A9, A11
    Date: 08/14/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 14, 2013

    Deepwater Permanent Subsea Pressure Compensated Chemical Reservoir Construction and Testing
    CX(s) Applied: A9
    Date: 08/14/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 14, 2013

    Gulf of Mexico Miocene Carbon Dioxide (CO2) Site Characterization Mega Transect - Task 8
    CX(s) Applied: A1, A9, A11
    Date: 08/14/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 14, 2013

    North Central Texas Alternative Fuel and Advanced Technology Investments
    CX(s) Applied: B5.23
    Date: 08/14/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 14, 2013

    Gulf of Mexico Miocene Carbon Dioxide (CO2) Site Characterization Mega Transect
    CX(s) Applied: A9, A11
    Date: 08/14/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 14, 2013

    Gulf of Mexico Miocene Carbon Dioxide (CO2) Site Characterization Mega Transect - Task 8
    CX(s) Applied: A1, A9, A11
    Date: 08/14/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 14, 2013

    Gulf of Mexico Miocene Carbon Dioxide (CO2) Site Characterization Mega Transect
    CX(s) Applied: A9, A11
    Date: 08/14/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 8, 2013

    North Central Texas Alternative Fuel and Advanced Technology Investments
    CX(s) Applied: B5.23
    Date: 08/08/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 8, 2013

    Replace Big Hill Circuit Breakers OCB-4009, 4010, and 4011 (install)
    CX(s) Applied: B1.3
    Date: 08/08/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 5, 2013

    South Louisiana Enhanced Oil Recovery (EOR)/Sequestration Research and Development (R&D) Project
    CX(s) Applied: A1, A9, A11
    Date: 08/05/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 1, 2013

    Technology Integration Program - Field Trial - Site Three
    CX(s) Applied: B3.1, B3.6
    Date: 08/01/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 1, 2013

    Technology Integration Program - Field Trial - Site Three
    CX(s) Applied: B3.1, B3.6
    Date: 08/01/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 1, 2013

    Technology Integration Program - Field Trial - Site Three
    CX(s) Applied: B3.1
    Date: 08/01/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory