You are here

Categorical Exclusion Determinations: Texas

Location

Categorical Exclusion Determinations issued for actions in Texas.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • September 19, 2012

    Houston Zero Emission Delivery Vehicle Deployment
    CX(s) Applied: A1, A9
    Date: 09/19/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 14, 2012

    Big Hill Fence Extension Modifications
    CX(s) Applied: B1.11
    Date: 09/14/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 12, 2012

    Water Management in Mature Oil Fields Using Advanced Particle Gels
    CX(s) Applied: A9
    Date: 09/12/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 11, 2012

    Controls on Methane Expulsion During Melting of Natural Gas Hydrate Systems
    CX(s) Applied: A9
    Date: 09/11/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 7, 2012

    “Clean Start” – Development of a National Liquid Propane (Autogas) Refueling Network
    CX(s) Applied: B5.22
    Date: 09/07/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 7, 2012

    Reconstructing Paleo-SMT Positions on the Cascadia Margin Using Magnetic Susceptibility
    CX(s) Applied: B3.6
    Date: 09/07/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 6, 2012

    (0675-1511) Ford Motor Company - High Precision Tester for Automotive and Stationary Batteries
    CX(s) Applied: B3.6
    Date: 09/06/2012
    Location(s): Michigan, New Mexico, Texas
    Offices(s): Advanced Research Projects Agency-Energy

  • August 31, 2012

    Planning of a Marine Methane Hydrate Pressure Coring Program
    CX(s) Applied: A1, A9
    Date: 08/31/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 31, 2012

    (0672-1556) Texas A&M University (TAMU) - System Development for Vehicular Natural Gas Storage Using Advanced Porous Materials
    CX(s) Applied: B3.6
    Date: 08/31/2012
    Location(s): Texas, Michigan, North Carolina, California
    Offices(s): Advanced Research Projects Agency-Energy

  • August 30, 2012

    Advanced Methane Hydrate Reservoir Modeling Using Rock Physics Techniques
    CX(s) Applied: A1, A9
    Date: 08/30/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 30, 2012

    Pecan Street Smart Grid Extension Service
    CX(s) Applied: A9
    Date: 08/30/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 28, 2012

    Zones 11 and 12 Steam Line Replacement
    CX(s) Applied: B1.3
    Date: 08/28/2012
    Location(s): Texas, Texas
    Offices(s): Pantex Site Office

  • August 28, 2012

    Replace Brine Disposal System Header to Bryan Mound Brine Tank
    CX(s) Applied: B1.3
    Date: 08/28/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 27, 2012

    Catalyst-Assisted Manufacture of Olefins from Natural Gas Liquids: Prototype Development
    CX(s) Applied: A9, B3.6
    Date: 08/27/2012
    Location(s): Pennsylvania, Texas, New Jersey
    Offices(s): Golden Field Office

  • August 24, 2012

    Texas Alternative Fuel Vehicle Pilot Program
    CX(s) Applied: A1
    Date: 08/24/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 23, 2012

    Replace Three Wood Poles-In-Kind at Bryan Mound West Gate
    CX(s) Applied: B1.3
    Date: 08/23/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 21, 2012

    "Development of a High Efficiency Hot Gas Turbo-Expander and Low Cost Heat Exchangers for
    Optimized Concentrated Solar Power Supercritical C02 Operation

    CX(s) Applied: A9, B3.6
    Date: 08/21/2012
    Location(s): Texas
    Offices(s): Golden Field Office"

  • August 21, 2012

    Optimizing the Concentrated Solar Power Tower Air Brayton Cycle System to meet the SunShot Objectives
    CX(s) Applied: A9, B3.6
    Date: 08/21/2012
    Location(s): Texas
    Offices(s): Golden Field Office

  • August 17, 2012

    Pecan Street Smart Grid Extension Service - Phase I
    CX(s) Applied: A9, A11, B5.1
    Date: 08/17/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 16, 2012

    Variable Frequency Drivers for Raw Water Intake Structure Pumps Government Furnished Equipment
    CX(s) Applied: B1.3
    Date: 08/16/2012
    Location(s): Texas, Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 15, 2012

    Novel Supercritical Carbon Dioxide Power Cycle Utilizing Pressurized Oxy-Combustion in Conjunction…
    CX(s) Applied: A9
    Date: 08/15/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 13, 2012

    Novel Materials for Robust Repair of Leaky Wellbores in Carbon Dioxide Storage Formations
    CX(s) Applied: A9, B3.6
    Date: 08/13/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 13, 2012

    University of Texas at Austin, Center for Electromechanics- Novel Free Piston Linear Motor Compressor
    CX(s) Applied: B3.6
    Date: 08/13/2012
    Location(s): Texas, Illinois, Illinois
    Offices(s): Advanced Research Projects Agency-Energy

  • August 7, 2012

    Texas Program Year 2012 State Energy Program Formula Grant
    CX(s) Applied: A9, A11
    Date: 08/07/2012
    Location(s): Texas
    Offices(s): Golden Field Office

  • August 7, 2012

    Algaecide Use at Wastewater Treatment Facility - Amendment 01
    CX(s) Applied: B1.3
    Date: 08/07/2012
    Location(s): Texas
    Offices(s): Pantex Site Office