You are here

Categorical Exclusion Determinations: Texas

Location

Categorical Exclusion Determinations issued for actions in Texas.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 13, 2012

    Sologen Geothermal Co-Production Field Demonstration
    CX(s) Applied: A9, B1.31, B3.1, B4.12, B5.5, B5.12, B5.15
    Date: 12/13/2012
    Location(s): Texas
    Offices(s): Golden Field Office

  • December 12, 2012

    City of Houston, Texas
    CX(s) Applied: B5.1
    Date: 12/12/2012
    Location(s): Texas
    Offices(s): Golden Field Office

  • December 12, 2012

    Southwest Regional Partnership on Carbon Sequestration: Phase III Commercial-Scale Geologic Carbon Capture, Utilization and Storage Department
    CX(s) Applied: B3.1
    Date: 12/12/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • December 12, 2012

    Southwest Regional Partnership on Carbon Sequestration: Phase III Commercial-Scale Geologic Carbon Capture, Utilization and Storage Department
    CX(s) Applied: B3.1
    Date: 12/12/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • December 12, 2012

    Pumping System for 100 MBD Cavern Capacity Maintenance
    CX(s) Applied: B1.15
    Date: 12/12/2012
    Location(s): Texas, Louisiana, Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 11, 2012

    Replace Brine Disposal System Header to Bryan Mound Brine Tank, GFE
    CX(s) Applied: B1.3
    Date: 12/11/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 11, 2012

    Loss of a Major Transformer at Bryan Mound or West Hackberry
    CX(s) Applied: B1.3
    Date: 12/11/2012
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • November 26, 2012

    Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline
    CX(s) Applied: B5.2
    Date: 11/26/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • November 9, 2012

    Collaborative Atomic-Scale Design, Analysis, and Nanofabrication for Record Breaking, Single-Crystal Solar Cell Arrays
    CX(s) Applied: A9, B3.6
    Date: 11/09/2012
    Location(s): Texas
    Offices(s): Golden Field Office

  • November 8, 2012

    North Central Texas Alternative Fuel and Advanced Technology Investments
    CX(s) Applied: A1
    Date: 11/08/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • November 8, 2012

    South Louisiana Enhanced Oil Recovery/Sequestration Research and Development Project
    CX(s) Applied: A9, A11
    Date: 11/08/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • November 8, 2012

    South Louisiana Enhanced Oil Recovery/Sequestration Research and Development Project
    CX(s) Applied: A9, A11
    Date: 11/08/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • November 5, 2012

    Alternate Source of Firewater at Bryan Mound
    CX(s) Applied: B5.2
    Date: 11/05/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • November 1, 2012

    Development and Test of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon
    CX(s) Applied: A9, B3.1
    Date: 11/01/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • October 31, 2012

    Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install)
    CX(s) Applied: B1.7
    Date: 10/31/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 18, 2012

    Midwest Region Alternative Fuels Project
    CX(s) Applied: B5.1
    Date: 10/18/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • October 18, 2012

    Temporal Characterization of Hydrates System Dynamics Beneath Seafloor Mounds: Integrating Time-Lapse
    CX(s) Applied: B3.6
    Date: 10/18/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • October 18, 2012

    Temporal Characterization of Hydrates System Dynamics beneath Seafloor Mounds: Integrating Time-Lapse
    CX(s) Applied: A9, A11
    Date: 10/18/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • October 9, 2012

    Development of Improved Caprock Integrity and Risk Assessment Techniques
    CX(s) Applied: A9
    Date: 10/09/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • October 2, 2012

    The Dow Chemical Company
    CX(s) Applied: B5.7
    Date: 10/02/2012
    Location(s): Texas
    Offices(s): Fossil Energy

  • September 27, 2012

    Gas Hydrate Dynamics on the Alaskan Beaufort Continental Slope: Modeling and Field Characterization
    CX(s) Applied: A9
    Date: 09/27/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 20, 2012

    Replace Sparge Piping at Bryan Mound Raw Water Intake Structure
    CX(s) Applied: B1.3
    Date: 09/20/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 19, 2012

    Houston Zero Emission Delivery Vehicle Deployment
    CX(s) Applied: A1, A9
    Date: 09/19/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 14, 2012

    Big Hill Fence Extension Modifications
    CX(s) Applied: B1.11
    Date: 09/14/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 12, 2012

    Water Management in Mature Oil Fields Using Advanced Particle Gels
    CX(s) Applied: A9
    Date: 09/12/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory