Categorical Exclusion Determinations: Texas

Location

Categorical Exclusion Determinations issued for actions in Texas.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • September 25, 2015

    ADAS Life Cycle Management Services, 2015-2020
    CX(s) Applied: B1.7
    Date: 09/25/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 23, 2015

    NRG CO2NCEPT
    CX(s) Applied: A9
    Date: 09/23/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 21, 2015

    Inspect Big Hill 48 Inch Raw Water Intake Pipeline (BH-MM-1200)
    CX(s) Applied: B1.3
    Date: 09/21/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 18, 2015

    Programmable Sealant-Loaded Mesoporous Nanoparticles for Gas/Liquid Leakage Mit.
    CX(s) Applied: B3.6, B3.11
    Date: 09/18/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 16, 2015

    Metal 3D Printing of Low-NOX Fuel Injectors with Integrated Temperature Sensors
    CX(s) Applied: A9
    Date: 09/16/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 14, 2015

    Subsea Produced Water Sensor Development
    CX(s) Applied: A9, A11, B3.6
    Date: 09/14/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 10, 2015

    Evaluation of Concentrated Piperazine for Carbon Dioxide Capture from Coal-Fired Flue Gas
    CX(s) Applied: A9, A11, B3.6
    Date: 09/10/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 8, 2015

    The Energy Switch
    Award Number: DE-EE0007185
    CX(s) Applied: A9, B3.1, B5.15
    Solar Energy Technologies Office
    Date: 09/08/2015
    Location(s): TX
    Office(s): Golden Field Office

  • September 4, 2015

    Subsea Produced Water Sensor Development
    CX(s) Applied: A9, A11, B3.6
    Date: 09/04/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 3, 2015

    Combustion Synthesis of Boride-Based Electrode Materials for MHD Direct Power...
    CX(s) Applied: A9, B3.6
    Date: 09/03/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 2, 2015

    A Framework for Data Integration, Assimilation, and Learning
    CX(s) Applied: A1, A9
    Date: 09/02/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • September 1, 2015

    Amine-Incorporated Porous Polymer Networks (aPPNs) as Sorbents for Post-Comb...
    CX(s) Applied: B3.6
    Date: 09/01/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 31, 2015

    Replace Bryan Mound Crude Oil Closed Drain System at Meter Skid (BM-MM-805)
    CX(s) Applied: B1.3
    Date: 08/31/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 31, 2015

    Development of an Ultra-High Efficiency Wide-Range Integrally-Geared Supercritical CO2 Compander
    Award Number: DE-EE0007114
    CX(s) Applied: A9, B3.6
    Solar Energy Technologies Office
    Date: 08/31/2015
    Location(s): TX
    Office(s): Golden Field Office

  • August 27, 2015

    Hydrogen Fuel-Cell Electric Hybrid Truck Demonstration
    CX(s) Applied: B5.22
    Date: 08/27/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 17, 2015

    Replace Critical Loop Transformers & Cables Damaged by Hurricane Ike
    CX(s) Applied: B1.3
    Date: 08/17/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 12, 2015

    PXP-15-0005 Routine Administrative, Maintenance, and Operating Activities Planned at Pantex Plant for Fiscal year 2016 and 2017
    CX(s) Applied: B1.3
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Pantex Site Office

  • August 12, 2015

    PXP-15-0004 Safety, Health, and Environmental Improvements for Fiscal Year 2016 and 2017
    CX(s) Applied: B2.1, B2.2, B2.3, B2.5
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Pantex Site Office

  • August 12, 2015

    Bayou Choctaw Wi-Fi/Radio Replacement Pilot
    CX(s) Applied: B1.7
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 12, 2015

    Install Packaged Central Heating, Ventilation and Air Conditioning Units for Bayou Choctaw Building 423
    CX(s) Applied: B1.4
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 12, 2015

    Replace Big Hill Critical Loop Transformers & Cables Damaged by Hurricane Ike
    CX(s) Applied: B1.3
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 10, 2015

    Big Hill Site Building Upgrades, Phase 2
    CX(s) Applied: B1.3
    Date: 08/10/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 3, 2015

    Surface and Airborne Monitoring Technology for Detecting Geologic Leakage in a Carbon Dioxide-Enhanced Oil Recovery Pilot, Anadarko Basin, Texas
    CX(s) Applied: A9, B3.1
    Date: 08/03/2015
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • August 3, 2015

    Replace 6" Piping at West Hackberry Disposal Wells
    CX(s) Applied: B1.3
    Date: 08/03/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 3, 2015

    Replace Windows on Big Hill and Bryan Mound Entry Portal Buildings
    CX(s) Applied: B1.3
    Date: 08/03/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office