You are here

Categorical Exclusion Determinations: Texas

Location

Categorical Exclusion Determinations issued for actions in Texas.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • July 13, 2012

    Deepwater Direct Offloading Systems, Phase One
    CX(s) Applied: A9, A11
    Date: 07/13/2012
    Location(s): Florida, New York, Texas
    Offices(s): National Energy Technology Laboratory

  • July 3, 2012

    EI Paso County Geothermal Project at Fort Bliss - Phase 2-B and Phase 3
    CX(s) Applied: A9, B3.1, B3.6
    Date: 07/03/2012
    Location(s): Texas
    Offices(s): Golden Field Office

  • July 3, 2012

    Texas-City-Grapevine
    CX(s) Applied: A9, B1.32, B2.5, B3.6, B5.1, B5.16, B5.17
    Date: 07/03/2012
    Location(s): Texas
    Offices(s): Energy Efficiency and Renewable Energy

  • June 26, 2012

    Texas-City-Rowlett
    CX(s) Applied: B2.5, B5.1
    Date: 06/26/2012
    Location(s): Texas
    Offices(s): Energy Efficiency and Renewable Energy

  • June 21, 2012

    Smart Cementing Materials and Drilling Muds for Real Time Monitoring of Deepwater Wellbore Enhancement
    CX(s) Applied: B3.6
    Date: 06/21/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • June 18, 2012

    Low Cost Flexible Production System for Remote Ultra Deepwater Gulf of Mexico Field Development
    CX(s) Applied: A9, A11
    Date: 06/18/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • June 18, 2012

    Low Cost Flexible Production System for Remote Ultra Deepwater Gulf of Mexico Field Development
    CX(s) Applied: A9
    Date: 06/18/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • June 14, 2012

    More Improvements to Deepwater Subsea Measurement
    CX(s) Applied: B3.6
    Date: 06/14/2012
    Location(s): Texas, Louisiana, New York, Oklahoma, Scotland
    Offices(s): National Energy Technology Laboratory

  • June 12, 2012

    Ultra-Deepwater Riser Concepts for High Motion Vessels
    CX(s) Applied: A9
    Date: 06/12/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • June 4, 2012

    Composite Riser for Ultra-Deepwater High Pressure Wells
    CX(s) Applied: A9, A11
    Date: 06/04/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • June 4, 2012

    Composite Riser for Ultra-Deepwater High Pressure Wells
    CX(s) Applied: A9, A11
    Date: 06/04/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • May 29, 2012

    High Pressure Fire Loop and Lead-In Replacement in the MAA - Amendment 01
    CX(s) Applied: B5.4
    Date: 05/29/2012
    Location(s): Texas
    Offices(s): Pantex Site Office

  • May 18, 2012

    Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank GFE
    CX(s) Applied: B1.3
    Date: 05/18/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 18, 2012

    Replace Big Hill RWIS Oil Water Separator Tank with Concrete Tank GFE
    CX(s) Applied: B1.3
    Date: 05/18/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 14, 2012

    Pilot Testing: Pretreatment Options to Allow Re-Use of Flowback Water
    CX(s) Applied: A9, B3.6
    Date: 05/14/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 27, 2012

    Waste Heat Integration with Solvent Process for More Efficient Carbon Dioxide Removal from Coal-Fired Flue Gas
    CX(s) Applied: A9, A11, B3.6
    Date: 04/27/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 27, 2012

    Waste Heat Integration with Solvent Process for More Efficient Carbon Dioxide Removal from Coal-Fired Flue Gas
    CX(s) Applied: A11
    Date: 04/27/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 25, 2012

    Deepwater Reverse-Circulation Primary Cementing
    CX(s) Applied: A9
    Date: 04/25/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 25, 2012

    Interstate Electrification Improvement
    CX(s) Applied: B5.1, B5.23
    Date: 04/25/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 24, 2012

    Deepwater Reverse-Circulation Primary Cementing
    CX(s) Applied: B3.6
    Date: 04/24/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 24, 2012

    Building 09-056 Demolition
    CX(s) Applied: B1.23
    Date: 04/24/2012
    Location(s): Texas
    Offices(s): Pantex Site Office

  • April 19, 2012

    Rework Big Hill 36” Crude Oil Pipeline Mainline Valves
    CX(s) Applied: B1.3
    Date: 04/19/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 10, 2012

    Re-work Bryan Mound 30” Crude Oil Pipeline Mainline Valves
    CX(s) Applied: B1.3
    Date: 04/10/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 6, 2012

    Coil Tubing (CT) Drilling and Intervention System Using Cost-Effective Vessels
    CX(s) Applied: A9
    Date: 04/06/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 6, 2012

    Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Consortium
    CX(s) Applied: A9
    Date: 04/06/2012
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory