You are here

Categorical Exclusion Determinations: Texas

Location

Categorical Exclusion Determinations issued for actions in Texas.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • May 17, 2013

    Collaborative Industry-Academic Synchrophasor Engineering Program
    CX(s) Applied: A9
    Date: 05/17/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • May 16, 2013

    Energy Efficiency and Conservation Block Grant Program- City of Houston, Texas
    CX(s) Applied: B5.1
    Date: 05/16/2013
    Location(s): Texas
    Offices(s): Golden Field Office

  • May 3, 2013

    Improved Mobility Control in Carbon Dioxide Enhanced Recovery Using SPI Gels
    CX(s) Applied: B3.11
    Date: 05/03/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • May 3, 2013

    Interstate Electrification Improvement
    CX(s) Applied: B5.1
    Date: 05/03/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • May 3, 2013

    Interstate Electrification Improvement
    CX(s) Applied: B5.1
    Date: 05/03/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • May 2, 2013

    Tailoring Catalyst Composition and Architecture for Conversion of Pollutants from Low Temperature
    CX(s) Applied: A9, B3.6
    Date: 05/02/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 30, 2013

    A 1,000 Level Drill Pipe Deployed Fiber Optic 3C Receiver Array for Deep Boreholes
    CX(s) Applied: A9, A11, B3.6
    Date: 04/30/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 30, 2013

    A 1,000 Level Drill Pipe Deployed Fiber Optic 3C Receiver Array for Deep Boreholes
    CX(s) Applied: A9, B3.6
    Date: 04/30/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 29, 2013

    ChargePoint America
    CX(s) Applied: A9, A11, B5.1, B5.23
    Date: 04/29/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 17, 2013

    Field Demonstration of a Novel Eco-Friendly Production Enhancement Process
    CX(s) Applied: B3.11
    Date: 04/17/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 16, 2013

    Purchase of Big Hill Control Valve Assembly
    CX(s) Applied: B1.3
    Date: 04/16/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 15, 2013

    Synthetic Microorganisms to Enable Lignin to Fuel Conversion
    CX(s) Applied: A9, B3.6
    Date: 04/15/2013
    Location(s): Texas, Georgia, Washington
    Offices(s): Golden Field Office

  • April 15, 2013

    Technology Integration Program Phase II Field Trial: Site One - Eagle Ford Shale
    CX(s) Applied: B3.11
    Date: 04/15/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • April 15, 2013

    Pacific Northwest National Laboratory- Novel Membrane Dehumidifier-enabled Air Cooling
    CX(s) Applied: B3.6
    Date: 04/15/2013
    Location(s): Washington, Ohio, Texas
    Offices(s): Advanced Research Projects Agency-Energy

  • April 15, 2013

    eNova, Incorporated - Waste Heat Powered Gas Compressor
    CX(s) Applied: B3.6
    Date: 04/15/2013
    Location(s): New Mexico, Texas, Texas
    Offices(s): Advanced Research Projects Agency-Energy

  • April 4, 2013

    Texas Alternative Fuel Vehicle Pilot Program
    CX(s) Applied: A1, B5.1
    Date: 04/04/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • March 11, 2013

    Georgia Institute of Technology- Electric Power Generation by a Vertical-Axis Turbine Driven by an Anchored Vortex and Sustained by the Air Layer over Solar-Heated Ground
    CX(s) Applied: B3.6, B5.15
    Date: 03/11/2013
    Location(s): Georgia, Texas, Illinois, Connecticut, Colorado
    Offices(s): Advanced Research Projects Agency-Energy

  • February 7, 2013

    Near-Isothermal Multi-Phase Compressor for Stripper Wells
    CX(s) Applied: A9, B3.6
    Date: 02/07/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • February 6, 2013

    Gulf Offshore Wind Project
    CX(s) Applied: A9, B3.1, B3.2, B3.3, B3.6, B3.16
    Date: 02/06/2013
    Location(s): Texas
    Offices(s): Golden Field Office

  • January 29, 2013

    Development of Methods to Prohibit and Remediate Loss of Annular Isolation in Shale Gas Wells
    CX(s) Applied: A9
    Date: 01/29/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • January 29, 2013

    Development of Methods to Prohibit and Remediate Loss of Annular Isolation in Shale Gas Wells
    CX(s) Applied: A9
    Date: 01/29/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • January 29, 2013

    Development of Methods to Prohibit and Remediate Loss of Annular Isolation in Shale Gas Wells
    CX(s) Applied: A9, A11, B3.6
    Date: 01/29/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • January 22, 2013

    Induced Seismicity/Fluid Injection: Development of Strategies to Manage Fluid Disposal in Shale Plays
    CX(s) Applied: A9, A11
    Date: 01/22/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • January 14, 2013

    Seismic Stimulation for Enhanced Oil Recovery
    CX(s) Applied: A9, A11, B3.6, B3.7
    Date: 01/14/2013
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • January 7, 2013

    Video Inspection of Bryan Mound 36-inch Raw Water Pipeline
    CX(s) Applied: B1.3
    Date: 01/07/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office