Many tasks performed at the Idaho National Laboratory (INL) site require field surveying activities to measure and identify information pertaining …
Bonneville Power Administration (BPA) proposes to fund the Idaho Department of Fish and Game (IDFG) to replace a fish screen along the East Fork of…
Bonneville Power Administration (BPA) proposes to fund Trout Unlimited (TU) to collect and analyze genetic samples of juvenile steelhead (Oncorhync…
The primary flight test site is at the Idaho National Laboratory (INL) Unmanned Aerial Systems (UAS) B16-710 runway and facility B16-612 and includ…
There are three legacy tanks, in two vaults at SMC, that will be removed to repurpose the areas for future SMC projects. The tanks are TK-BA-107, T…
This ECP only pertains to Section 110 activities carried out by the INL CRMO. CRMO Activities: Test excavations, surveys, monitoring and data recor…
Power Management is requesting authorization to build a training yard to develop the skills of the journeymen linemen in the department.…
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe (NPT) to plant riparian vegetation along Little Salmon Creek in the Litt…
New 3-phase underground power line (approx. 0.5 mile), a new cable installed by boring under the Pen Oreille River (approx. 0.25 mile), and the reb…
Bonneville Power Administration (BPA) proposes to replace in-kind, wood pole structure 10/6 and associated structural/electrical components (e.g., …