  • Amended Provision of Funds to the Idaho Department of Fish and Game (IDFG) to Purchase the Rapid Lightning Creek Property
    CX(s) Applied: B1.25
    Date: 04/24/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • Provision of Funds to the Idaho Department of Fish and Game (IDFG) to Purchase the Rapid Lightning Creek Property
    CX(s) Applied: B1.25
    Date: 04/24/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • Geotechnical Core Drilling for USGS 138
    CX(s) Applied: B3.1
    Date: 04/18/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • Power Line Configuration 2013-1
    CX(s) Applied: B4.13
    Date: 04/15/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • Idaho National Laboratory (INL) Closed Circuit Television (CCTV) Replacement Project
    CX(s) Applied: B2.2
    Date: 04/07/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • Sitewide Categorical Exclusion for Research Activities in Aquatic Environments
    CX(s) Applied: B3.16
    Date: 03/28/2012
    Location(s): Oregon, Washington, Idaho
    Offices(s): Pacific Northwest Site Office

  • Central Facilities Area (CFA) Shoot House Panel Installation
    CX(s) Applied: B2.1
    Date: 03/21/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • International Way Office Building Lease Termination
    CX(s) Applied: B1.24
    Date: 03/21/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change
    CX(s) Applied: B1.31
    Date: 03/15/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • System-Cost-Optimized Smart Electric Vehicle Supply Equipment for Residential Application
    CX(s) Applied: B3.6
    Date: 02/24/2012
    Location(s): Idaho, Illinois
    Offices(s): National Energy Technology Laboratory

  • Smart Grid Capable Electric Vehicle Supply Equipment
    CX(s) Applied: B3.6
    Date: 02/16/2012
    Location(s): Idaho, Illinois
    Offices(s): National Energy Technology Laboratory

  • Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways
    CX(s) Applied: B1.3
    Date: 02/10/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • Hatwai 230-Kilovolt Substation Breaker Replacement
    CX(s) Applied: B4.6
    Date: 02/09/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way
    CX(s) Applied: B1.3
    Date: 02/02/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • Enhanced Geothermal Systems- Concept Testing and Development at the Raft River Geothermal Field, Idaho
    CX(s) Applied: A9, B3.1
    Date: 01/10/2012
    Location(s): Idaho
    Offices(s): Golden Field Office

  • Rensselaer Infrastructure Upgrade to Enhance Research and Education in Nuclear Engineering – Rensselaer Polytechnic Institute
    CX(s) Applied: B3.6
    Date: 01/04/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • State Energy Program American Recovery and Reinvestment Act REEZ· City of Sandpoint - Phase II
    CX(s) Applied: B5.21
    Date: 12/20/2011
    Location(s): Idaho
    Offices(s): Golden Field Office

  • Provision of Funds To The Idaho Department of Fish and Game (IDFG) To Purchase the Rapid Lightening Creek Conservation Easement
    CX(s) Applied: B1.25
    Date: 12/01/2011
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC
    CX(s) Applied: B1.3
    Date: 11/28/2011
    Location(s): Idaho
    Offices(s): Nuclear Energy, Idaho Operations Office

  • Idaho-TRIBE-SHOSHONE-BANNOCK TRIBE OF THE FORT HALL RESERVATION OF IDAHO
    CX(s) Applied: B2.5, B5.1
    Date: 11/22/2011
    Location(s): Idaho
    Offices(s): Energy Efficiency and Renewable Energy

  • Provision of Funds to the Kootenai Tribe of Idaho to Purchase the Upper Twin Rivers Conservation Easement
    CX(s) Applied: B1.25
    Date: 11/17/2011
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • Idaho National Laboratory (INL) Support to Analysis and Measurement Systems Corporation (AMS) for Performance Monitoring Technology Deployment at the Advanced Test Reactor (ATR) on the INL
    CX(s) Applied: B3.6
    Date: 11/15/2011
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • Targhee Substation Communication Equipment Upgrades
    CX(s) Applied: B1.15
    Date: 10/12/2011
    Location(s): Teton County, Idaho
    Office(s): Bonneville Power Administration

  • Cattle Creek Substation
    CX(s) Applied: B4.11
    Date: 09/27/2011
    Location(s): Bonneville County, Idaho
    Office(s): Bonneville Power Administration

  • Idaho-Tribal Energy Program-Nez Perce Tribe
    CX(s) Applied: B2.5, B5.1
    Date: 09/23/2011
    Location(s): Nez Perce Tribe, Idaho
    Office(s): Energy Efficiency and Renewable Energy, Savannah River Operations Office