You are here

Categorical Exclusion Determinations: Idaho

Location

Categorical Exclusion Determinations issued for actions in Idaho.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • October 30, 2013

    Self-powered Wireless Dual-mode Langasite Sensor for Pressure/Temperature Monitoring of Nuclear Reactors
    CX(s) Applied: B3.6
    Date: 10/30/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 29, 2013

    Innovative Coating of Nanostructured Vanadium Carbide on the F/M Cladding Tube Inner Surface for Mitigating the Fuel Cladding Chemical Interactions
    CX(s) Applied: B3.6
    Date: 10/29/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 29, 2013

    Bil3 Gamma-Ray Spectrometers for Reliable Room-Temperature Nuclear Materials Safeguarding
    CX(s) Applied: B3.6
    Date: 10/29/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 24, 2013

    Relief Valve Test Stand Relocation
    CX(s) Applied: B1.31
    Date: 10/24/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 24, 2013

    Multipurpose High-Resolution X-Ray Diffractometer for Nuclear Energy Research and Education
    CX(s) Applied: B3.6
    Date: 10/24/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 24, 2013

    In-core Neutron Detectors for the University of Texas at Austin TRIGA REActor
    CX(s) Applied: B1.31
    Date: 10/24/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 23, 2013

    High Temperature Thermal Properties
    CX(s) Applied: B1.31
    Date: 10/23/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 22, 2013

    Expansion of Nuclear Industry Programs at Aiken Technical College
    CX(s) Applied: B1.31
    Date: 10/22/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 21, 2013

    Infrastructure Improvement of the Kansas State University Reactor
    CX(s) Applied: B2.2
    Date: 10/21/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 21, 2013

    Development of New Analytical Capabilities for the Characterization and Measurement of Solid Actinide-Containing Materials Supporting Fuel Cycle Research and Development at Clemson University
    CX(s) Applied: B3.6
    Date: 10/21/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 17, 2013

    Infrastructure Upgrade to the Massachusetts Institute of Technology Research Reactor in Support of Operational Safety
    CX(s) Applied: B2.5
    Date: 10/17/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • September 30, 2013

    Idaho Petroleum Reduction Leadership Project
    CX(s) Applied: A1
    Date: 09/30/2013
    Location(s): Idaho
    Offices(s): National Energy Technology Laboratory

  • September 27, 2013

    Idaho National Laboratory Road Sign Installation/Maintenance
    CX(s) Applied: B1.32
    Date: 09/27/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • September 23, 2013

    Test Reactor Area - 680 Road Widening
    CX(s) Applied: B1.32
    Date: 09/23/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • September 16, 2013

    Swan Valley-Teton Number 1 and Number 2 Access Road Maintenance
    CX(s) Applied: B1.3
    Date: 09/16/2013
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • September 13, 2013

    National Oceanic and Atmospheric Administration Project Sagebrush Atmospheric Tracer Dispersion Study Revision 1
    CX(s) Applied: B3.1
    Date: 09/13/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • August 29, 2013

    Decommissioning of Shallow Injection Wells at the Advanced Test Reactor Complex
    CX(s) Applied: B5.3
    Date: 08/29/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • August 25, 2013

    Willow Creek Building Pedestrian Bridge Replacement
    CX(s) Applied: B2.5
    Date: 08/25/2009
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • August 16, 2013

    Interim Storage Area for Interim Storage Containers (ISCs) at the Radioactive Scrap and Waste Facility (RSWF)
    CX(s) Applied: B6.6
    Date: 08/16/2013
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • August 14, 2013

    University Boulevard Water Meter Installation
    CX(s) Applied: B2.2
    Date: 08/14/2013
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • August 12, 2013

    ZIRCEX Nuclear Fuel Dissolution Testing
    CX(s) Applied: B3.6
    Date: 08/12/2013
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • August 8, 2013

    United States Geological Survey (USGS) Geotechnical Drilling for USGS 139
    CX(s) Applied: B3.1
    Date: 08/08/2013
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • August 1, 2013

    Wildland Fire Chainsaw Training
    CX(s) Applied: B1.2
    Date: 08/01/2013
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • July 31, 2013

    2013 Spokane District Wood pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 07/31/2013
    Location(s): Washington, Washington, Washington, Washington, Idaho
    Offices(s): Bonneville Power Administration

  • July 30, 2013

    Relocation of National and Homeland Security (N&HS) activities from Transient Reactor Experiment and Test Facility (TREAT) to Critical Infrastructure Test Range Complex (CITRC)
    CX(s) Applied: B1.15
    Date: 07/30/2013
    Location(s): Idaho
    Offices(s): Nuclear Energy