This ECP revision is based on Oklo requesting to spread soil in two areas as needed. There are two locations identified, On site and Medal of Honor…
This project is a revision to the original environmental review process (ERP) identification 4157 that was covered by tent Environmental Compliance…
The Idaho National Laboratory (INL) is partnering with the U.S. Army Combat Capabilities Development Command (DEVCOM) and the Colorado School of Mi…
As part of Revision 1 to ECP INL-25-027, additional scope has been identified to support reactor demonstration at MFC-793. These activities are nec…
Fall River Rural Electric Cooperative plans to underground 3.22 miles of existing distribution lines in a heavily forested area in and next to Cari…
BPA proposes to maintain low growing vegetation communities in specific, localized areas in and adjacent to the Drummond-Macks Inn No. 1 and Green…
During the construction of the Pronghorn Station, the Idaho National Laboratory (INL) will supply temporary power to facilitate the construction an…
This revision is based on Aalo further defining areas needed to perform limited construction activities. The limited construction activities will r…
BEA is performing additional Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 and/or 2 on behalf of the U.S. Department of Energy (DOE). Th…
The No Trespassing signs along the Idaho National Laboratory (INL) border have not been updated for some time and have consequently become illegibl…