  • June 9, 2015

    Multi-scale Experimental Study of Creep-Fatigue Failure Initiation in a 709 Stainless Steel Alloy Using High Resolution Digital Image Correlation
    CX(s) Applied: B3.6
    Date: 06/09/2015
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • June 9, 2015

    Advanced Test Reactor Cold Waste Collection Tank 670-M-186 Vessel Replacement
    CX(s) Applied: B6.3
    Date: 06/09/2015
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • June 4, 2015

    Maximizing the habitat restoration potential of controlled releases at hydropower dams; Understanding impacts of hydrograph form on sediment transport - HRF - University of Idaho
    Award Number: DE-EE0002668/EE0006506
    CX(s) Applied: A9
    Water Power Program
    Date: 06/04/2015
    Location(s): ID
    Office(s): Golden Field Office

  • June 1, 2015

    Idaho National Laboratory Routine Maintenance Activities (Overarching)
    CX(s) Applied: B1.3
    Date: 06/01/2015
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • June 1, 2015

    Central Facilities Area Sewage Treatment System lagoon #3 and Land Application Site Closure
    CX(s) Applied: B1.26
    Date: 06/01/2015
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • May 26, 2015

    Upper Lemhi Conservation Easement Acquisition
    CX(s) Applied: B1.25
    Date: 05/26/2015
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • May 26, 2015

    Advanced Test Reactor 2A Loop Chemistry Control
    CX(s) Applied: B3.6
    Date: 05/26/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 20, 2015

    Advanced Test Reactor Complex Street Lights Project
    CX(s) Applied: B2.1
    Date: 05/20/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 20, 2015

    Materials and Fuel Complex-785 Monorail System Upgrade
    CX(s) Applied: B1.31
    Date: 05/20/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 19, 2015

    Advanced Test Reactor Crane 670-C-7 Rated Capacity Upgrade
    CX(s) Applied: B1.31
    Date: 05/19/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 19, 2015

    Removal of Out of Service Equipment and Installation of high-efficiency particulate air Filter in Test Reactor Area 670 Pump Test Room
    CX(s) Applied: B2.5
    Date: 05/19/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 19, 2015

    Materials and Fuels Complex MH50 Fiber Optic Installation Project
    CX(s) Applied: B4.7
    Date: 05/19/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 14, 2015

    Central Facilities Area Live Fire Range Fiber Optic Connection
    CX(s) Applied: B4.7
    Date: 05/14/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 14, 2015

    Idaho National Laboratory Fire Stations' Vehicle Exhaust Extraction Systems Replacement
    CX(s) Applied: B2.3
    Date: 05/14/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 11, 2015

    Materials and Fuel Complex-752 Analytical Laboratory Main Stack Modifications for Sample Probe Replacement
    CX(s) Applied: B2.2
    Date: 05/11/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 5, 2015

    In situ Raman Spectroscopy to Enhance Nuclear Materials Research and Education- University of Nevada Reno
    CX(s) Applied: B2.2
    Date: 05/05/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 27, 2015

    Test Reactor Area-774 Substation Equipment Upgrades
    CX(s) Applied: B2.5
    Date: 04/27/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 16, 2015

    Integrated Approach to Fluoride High Temperature Reactor Technology and Licensing Challenges - Georgia Tech
    CX(s) Applied: B3.6
    Date: 04/16/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 16, 2015

    Replacement of Test Reactor Area-671 Chemistry Monitoring Unit and Modification of Piping and Components
    CX(s) Applied: B2.5
    Date: 04/16/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 14, 2015

    Hot Fuel Examination Facility Lab Hot Water System Modification
    CX(s) Applied: B2.5
    Date: 04/14/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 10, 2015

    Impact Test Machine for Nuclear Containment Research - University of Houston
    CX(s) Applied: B1.31
    Date: 04/10/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 10, 2015

    Equipment for Education, Training, and Research in Advanced Instrumentation for fluoride Salt Cooled High-Temperature Reactors at the Ohio State University
    CX(s) Applied: B1.31
    Date: 04/10/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 10, 2015

    Nuclear Materials Science and Instrumentation Research Infrastructure Upgrade at Pennsylvania State University
    CX(s) Applied: B1.31
    Date: 04/10/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 10, 2015

    In situ Taman Spectroscopy to Enhance Nuclear Materials Research and Education- University of Nevada Reno
    CX(s) Applied: B1.31
    Date: 04/10/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 10, 2015

    Automated Chromatography System for Purification of New Reagents for An/Ln Extraction and Separation- Washington State University
    CX(s) Applied: B1.31
    Date: 04/10/2015
    Location(s): Idaho
    Offices(s): Idaho Operations Office