You are here

Categorical Exclusion Determinations: Idaho

Location

Categorical Exclusion Determinations issued for actions in Idaho.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • April 25, 2013

    High Density Fuel Material for Light Water Reactors
    CX(s) Applied: B1.31
    Date: 04/25/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 25, 2013

    Power Line Configuration
    CX(s) Applied: B4.13
    Date: 04/25/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 24, 2013

    Bald Mountain, Miller Peak, Lines Creek, and Taft Passive Repeater Communication Upgrades
    CX(s) Applied: B1.19
    Date: 04/24/2013
    Location(s): Montana, Montana, Idaho
    Offices(s): Bonneville Power Administration

  • April 23, 2013

    Nanostructured High Temperature Bulk Thermoelectric Energy Conversion
    CX(s) Applied: A9
    Date: 04/23/2013
    Location(s): Idaho
    Offices(s): National Energy Technology Laboratory

  • March 12, 2013

    Land Mobile Radio - Bi Directional Amplifier (BDA) Installation
    CX(s) Applied: B1.7
    Date: 03/21/2013
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • February 20, 2013

    Energy Efficient Integrated Fiber-Reinforced Polymer-confined Sandwich Roof System
    CX(s) Applied: A9, B3.6, B5.1
    Date: 02/20/2013
    Location(s): Idaho
    Offices(s): Golden Field Office

  • January 14, 2013

    High Density Fuel Material for Light Water Reactors (LWRs)
    CX(s) Applied: B1.31
    Date: 01/14/2013
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • January 7, 2013

    Beck Road Substation Meter Installation
    CX(s) Applied: B1.7
    Date: 01/07/2013
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • December 19, 2012

    Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line
    CX(s) Applied: B1.3, B1.13
    Date: 12/19/2012
    Location(s): Washington, Idaho
    Offices(s): Bonneville Power Administration

  • December 17, 2012

    National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study
    CX(s) Applied: B3.1
    Date: 12/17/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • December 15, 2012

    INTEC โ€“ U-233 Waste Stream Disposition
    CX(s) Applied: NO CX GIVEN
    Date: 12/15/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • December 5, 2012

    Advanced Test Reactor (ATR) Transition to Commercial Power
    CX(s) Applied: B2.5
    Date: 12/05/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • November 29, 2012

    Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way
    CX(s) Applied: B1.3
    Date: 11/29/2012
    Location(s): Idaho, Idaho
    Offices(s): Bonneville Power Administration

  • November 29, 2012

    Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670
    CX(s) Applied: B2.5
    Date: 11/29/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • November 23, 2012

    INTEC โ€“ Suspect RH-TRU (AMWTP)
    CX(s) Applied: NO CX GIVEN
    Date: 11/23/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • November 6, 2012

    CPP-684 โ€“ Remote Analytical Laboratory Facility Modifications
    CX(s) Applied: B1.28
    Date: 11/06/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • November 6, 2012

    ICP Routine Maintenance
    CX(s) Applied: B1.3
    Date: 11/06/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • October 18, 2012

    Central Facilities Area (CFA)-696 Gasoline Tank Installation
    CX(s) Applied: B2.5
    Date: 10/18/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • October 16, 2012

    Idaho Falls Power - Willow Creek Building Conduit Installation
    CX(s) Applied: B4.7
    Date: 10/16/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • September 24, 2012

    2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project
    CX(s) Applied: B1.3
    Date: 09/24/2012
    Location(s): Idaho, Idaho
    Offices(s): Bonneville Power Administration

  • September 4, 2012

    Provision of Funds to the Shoshone-Paiute Tribes of the Duck Valley Reservation (Shoshone-Paiute Tribes) to Purchase Five Parcels of Land in Owyhee County, Idaho
    CX(s) Applied: B1.25
    Date: 09/04/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • August 30, 2012

    Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching
    CX(s) Applied: B1.2
    Date: 08/30/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • August 13, 2012

    Area 4: Reactive Transport Models with Geomechanics to Mitigate Risks of Carbon Dioxide Utilization and Storage
    CX(s) Applied: A9
    Date: 08/13/2012
    Location(s): Idaho
    Offices(s): National Energy Technology Laboratory

  • July 24, 2012

    Idaho Program Year 2012 State Energy Program Formula Grants
    CX(s) Applied: A9, A11
    Date: 07/24/2012
    Location(s): Idaho
    Offices(s): Golden Field Office

  • July 11, 2012

    High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility
    CX(s) Applied: B1.19
    Date: 07/11/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office