You are here

Categorical Exclusion Determinations: Idaho

Location

Categorical Exclusion Determinations issued for actions in Idaho.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • May 17, 2012

    Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter – Texas Agricultural & Mechanical University
    CX(s) Applied: B2.2, B3.6
    Date: 05/17/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 17, 2012

    Equipment Upgrade for the University of New Mexico AGN-201M Reactor – University of New Mexico
    CX(s) Applied: B2.2, B3.6
    Date: 05/17/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 15, 2012

    Idaho County-Kootenai
    CX(s) Applied: B2.5, B5.1, B5.16
    Date: 05/15/2012
    Location(s): Idaho
    Offices(s): Energy Efficiency and Renewable Energy

  • May 14, 2012

    Advanced Test Reactor (ATR) Primary Coolant System (PCS) Relief Valves Monorail System
    CX(s) Applied: B1.31
    Date: 05/14/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 9, 2012

    Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation
    CX(s) Applied: B1.4
    Date: 05/09/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 26, 2012

    Test Reactor Area (TRA)-1710 Radioactive Materials Storage Area
    CX(s) Applied: B2.5
    Date: 04/26/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • April 24, 2012

    Amended Provision of Funds to the Idaho Department of Fish and Game (IDFG) to Purchase the Rapid Lightning Creek Property
    CX(s) Applied: B1.25
    Date: 04/24/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • April 24, 2012

    Provision of Funds to the Idaho Department of Fish and Game (IDFG) to Purchase the Rapid Lightning Creek Property
    CX(s) Applied: B1.25
    Date: 04/24/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • April 18, 2012

    Geotechnical Core Drilling for USGS 138
    CX(s) Applied: B3.1
    Date: 04/18/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • April 15, 2012

    Power Line Configuration 2013-1
    CX(s) Applied: B4.13
    Date: 04/15/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • April 7, 2012

    Idaho National Laboratory (INL) Closed Circuit Television (CCTV) Replacement Project
    CX(s) Applied: B2.2
    Date: 04/07/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • March 28, 2012

    Sitewide Categorical Exclusion for Research Activities in Aquatic Environments
    CX(s) Applied: B3.16
    Date: 03/28/2012
    Location(s): Oregon, Washington, Idaho
    Offices(s): Pacific Northwest Site Office

  • March 21, 2012

    Central Facilities Area (CFA) Shoot House Panel Installation
    CX(s) Applied: B2.1
    Date: 03/21/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • March 21, 2012

    International Way Office Building Lease Termination
    CX(s) Applied: B1.24
    Date: 03/21/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • March 15, 2012

    Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change
    CX(s) Applied: B1.31
    Date: 03/15/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • February 24, 2012

    System-Cost-Optimized Smart Electric Vehicle Supply Equipment for Residential Application
    CX(s) Applied: B3.6
    Date: 02/24/2012
    Location(s): Idaho, Illinois
    Offices(s): National Energy Technology Laboratory

  • February 16, 2012

    Smart Grid Capable Electric Vehicle Supply Equipment
    CX(s) Applied: B3.6
    Date: 02/16/2012
    Location(s): Idaho, Illinois
    Offices(s): National Energy Technology Laboratory

  • February 10, 2012

    Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways
    CX(s) Applied: B1.3
    Date: 02/10/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • February 9, 2012

    Hatwai 230-Kilovolt Substation Breaker Replacement
    CX(s) Applied: B4.6
    Date: 02/09/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • February 2, 2012

    Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way
    CX(s) Applied: B1.3
    Date: 02/02/2012
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • January 10, 2012

    Enhanced Geothermal Systems- Concept Testing and Development at the Raft River Geothermal Field, Idaho
    CX(s) Applied: A9, B3.1
    Date: 01/10/2012
    Location(s): Idaho
    Offices(s): Golden Field Office

  • January 4, 2012

    Rensselaer Infrastructure Upgrade to Enhance Research and Education in Nuclear Engineering – Rensselaer Polytechnic Institute
    CX(s) Applied: B3.6
    Date: 01/04/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • December 20, 2011

    State Energy Program American Recovery and Reinvestment Act REEZ· City of Sandpoint - Phase II
    CX(s) Applied: B5.21
    Date: 12/20/2011
    Location(s): Idaho
    Offices(s): Golden Field Office

  • December 1, 2011

    Provision of Funds To The Idaho Department of Fish and Game (IDFG) To Purchase the Rapid Lightening Creek Conservation Easement
    CX(s) Applied: B1.25
    Date: 12/01/2011
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • November 28, 2011

    Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC
    CX(s) Applied: B1.3
    Date: 11/28/2011
    Location(s): Idaho
    Offices(s): Nuclear Energy, Idaho Operations Office