High Density Fuel Material for Light Water Reactors (LWRs)
CX(s) Applied: B1.31
Date: 01/14/2013
Location(s): Idaho
Offices(s): Nuclear Energy
Location
Categorical Exclusion Determinations issued for actions in Idaho.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
January 14, 2013
-
January 7, 2013
Beck Road Substation Meter Installation
CX(s) Applied: B1.7
Date: 01/07/2013
Location(s): Idaho
Offices(s): Bonneville Power Administration -
December 19, 2012
Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line
CX(s) Applied: B1.3, B1.13
Date: 12/19/2012
Location(s): Washington, Idaho
Offices(s): Bonneville Power Administration -
December 17, 2012
National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study
CX(s) Applied: B3.1
Date: 12/17/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
December 15, 2012
INTEC – U-233 Waste Stream Disposition
CX(s) Applied: NO CX GIVEN
Date: 12/15/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
December 5, 2012
Advanced Test Reactor (ATR) Transition to Commercial Power
CX(s) Applied: B2.5
Date: 12/05/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
November 29, 2012
Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way
CX(s) Applied: B1.3
Date: 11/29/2012
Location(s): Idaho, Idaho
Offices(s): Bonneville Power Administration -
November 29, 2012
Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670
CX(s) Applied: B2.5
Date: 11/29/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
November 23, 2012
INTEC – Suspect RH-TRU (AMWTP)
CX(s) Applied: NO CX GIVEN
Date: 11/23/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
November 6, 2012
CPP-684 – Remote Analytical Laboratory Facility Modifications
CX(s) Applied: B1.28
Date: 11/06/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
November 6, 2012
ICP Routine Maintenance
CX(s) Applied: B1.3
Date: 11/06/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
October 18, 2012
Central Facilities Area (CFA)-696 Gasoline Tank Installation
CX(s) Applied: B2.5
Date: 10/18/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
October 16, 2012
Idaho Falls Power - Willow Creek Building Conduit Installation
CX(s) Applied: B4.7
Date: 10/16/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
September 24, 2012
2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project
CX(s) Applied: B1.3
Date: 09/24/2012
Location(s): Idaho, Idaho
Offices(s): Bonneville Power Administration -
September 4, 2012
Provision of Funds to the Shoshone-Paiute Tribes of the Duck Valley Reservation (Shoshone-Paiute Tribes) to Purchase Five Parcels of Land in Owyhee County, Idaho
CX(s) Applied: B1.25
Date: 09/04/2012
Location(s): Idaho
Offices(s): Bonneville Power Administration -
August 30, 2012
Radiological Dispersal Device (RDD)/Improvised Nuclear Device (IND) Material Training Activities and Evaluations Using Radiation Emitting Sources/Material/Devices - Overarching
CX(s) Applied: B1.2
Date: 08/30/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
August 13, 2012
Area 4: Reactive Transport Models with Geomechanics to Mitigate Risks of Carbon Dioxide Utilization and Storage
CX(s) Applied: A9
Date: 08/13/2012
Location(s): Idaho
Offices(s): National Energy Technology Laboratory -
July 24, 2012
Idaho Program Year 2012 State Energy Program Formula Grants
CX(s) Applied: A9, A11
Date: 07/24/2012
Location(s): Idaho
Offices(s): Golden Field Office -
July 11, 2012
High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility
CX(s) Applied: B1.19
Date: 07/11/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
July 9, 2012
Zero Power Physics Reactor Surveillance Glove Box
CX(s) Applied: B2.5
Date: 07/09/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
July 5, 2012
Idaho National Laboratory Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade
CX(s) Applied: B1.4
Date: 07/05/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
July 5, 2012
Rexburg Bus Lot Lease Termination
CX(s) Applied: B1.24
Date: 07/05/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
July 2, 2012
State Energy Plan Council School District Woody Biomass Project
CX(s) Applied: B5.1, B5.5
Date: 07/02/2012
Location(s): Idaho
Offices(s): Golden Field Office -
June 28, 2012
Lancaster Line and Load Project
CX(s) Applied: B4.6, B4.7
Date: 06/28/2012
Location(s): Idaho
Offices(s): Bonneville Power Administration -
June 27, 2012
Materials and Fuel Complex – Sodium Processing Facility Tank System Resource Conservation and Recovery Act Closure
CX(s) Applied: B6.1
Date: 06/27/2012
Location(s): Idaho
Offices(s): Idaho Operations Office