You are here

Categorical Exclusion Determinations: B1.31

Existing Regulations

B1.31: Installation or relocation of machinery and equipment
Installation or relocation and operation of machinery and equipment (including, but not limited to, laboratory equipment, electronic hardware, manufacturing machinery, maintenance equipment, and health and safety equipment), provided that uses of the installed or relocated items are consistent with the general missions of the receiving structure. Covered actions include modifications to an existing building, within or contiguous to a previously disturbed or developed area, that are necessary for equipment installation and relocation. Such modifications would not appreciably increase the footprint or height of the existing building or have the potential to cause significant changes to the type and magnitude of environmental impacts.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • March 26, 2012

    Captain Jack-Olinda RAS LLL/LT Replacement Project
    CX(s) Applied: B1.31
    Date: 03/26/2012
    Location(s): California
    Offices(s): Bonneville Power Administration

  • March 15, 2012

    Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change
    CX(s) Applied: B1.31
    Date: 03/15/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • January 24, 2012

    Project Eagle Phase 1 Direct Wafer/Cell Solar Facility
    CX(s) Applied: B1.31
    Date: 01/24/2012
    Location(s): Massachusetts
    Offices(s): Loan Guarantee Program Office

  • January 13, 2012

    Installation or Relocation of Machinery and Equipment
    CX(s) Applied: B1.31
    Date: 01/13/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 21, 2011

    Improving Recycling Capacity and Solid Waste Education in American Samoa
    CX(s) Applied: B1.31, B1.35, A9
    Date: 12/21/2011
    Location(s): American Samoa
    Offices(s): Golden Field Office

  • December 20, 2011

    Regional Test Center Project: Solar Technology Acceleration Center (SolarTAC)
    CX(s) Applied: B1.15, B1.31, B5.15
    Date: 12/20/2011
    Location(s): Colorado
    Offices(s): Golden Field Office

  • December 15, 2011

    Install Additional Expanded Basin Storage Racks
    CX(s) Applied: B1.31
    Date: 12/15/2011
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 15, 2011

    MPLE Test Stand Replacement Project
    CX(s) Applied: B1.3, B1.27, B1.31
    Date: 12/15/2011
    Location(s): Tennessee
    Offices(s): Y-12 Site Office

  • December 15, 2011

    Waste Management Construction Support
    CX(s) Applied: B1.3, B1.11, B1.23, B1.24, B1.27, B1.28, B1.29, B1.31, B2.1
    Date: 12/15/2011
    Location(s): Tennessee
    Offices(s): Y-12 Site Office

  • November 29, 2011

    Parts Washer Project
    CX(s) Applied: B1.23, B1.31
    Date: 11/29/2011
    Location(s): Tennessee
    Offices(s): Y-12 Site Office

  • September 8, 2011

    Information Technology Hub Relocation
    CX(s) Applied: B1.31
    Date: 09/08/2011
    Location(s): Morgantown, West Virginia
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • September 6, 2011

    Chrysler Group LLC, Revised Specific Project Application 2, Retooling, Reequipping and Engineering
    CX(s) Applied: B1.31, B5.1
    Date: 09/06/2011
    Location(s): Auburn Hills, Michigan
    Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office

  • August 29, 2011

    B83 1st Floor Renovation - Phase II Completion
    CX(s) Applied: B1.29, B1.31, B2.1, B2.2
    Date: 08/29/2011
    Location(s): Pittsburgh, Pennsylvania
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • August 15, 2011

    SoloPower, Inc. Electrodeposition-based Solar Panel Manufacturing Facilities
    CX(s) Applied: B1.31
    Date: 08/15/2011
    Location(s): Oregon, California
    Offices(s): Loan Guarantee Program Office

  • August 3, 2011

    B-Press and Extruder Modification
    CX(s) Applied: A7, B1.3, B1.15, B1.16, B1.27, B1.31
    Date: 08/03/2011
    Location(s): Amarillo, Texas
    Office(s): Pantex Site Office

  • July 28, 2011

    Project Eagle Direct Wafer Manufacturing Plants
    CX(s) Applied: B1.23, B1.31
    Date: 07/28/2011
    Location(s): Massachusetts
    Offices(s): Loan Guarantee Program Office

  • July 20, 2011

    Relocate Hydroburst System from 238-H to 234-7H
    CX(s) Applied: B1.31
    Date: 07/20/2011
    Location(s): Aiken, South Carolina
    Office(s): Savannah River Operations Office

  • July 11, 2011

    Solid State Batteries for Grid-Scale Energy Storage
    CX(s) Applied: A1, A9, B1.31, B3.6
    Date: 07/11/2011
    Location(s): Hayward, California
    Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory

  • June 20, 2011

    Aptera All-Electric and Hybrid Electric Vehicles
    CX(s) Applied: B1.31, B5.1
    Date: 06/20/2011
    Location(s): Grand Rapids, Michigan
    Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office

  • June 20, 2011

    Decherd Electric Vehicle Motor Project
    CX(s) Applied: B1.31
    Date: 06/20/2011
    Location(s): Tennessee
    Offices(s): Advanced Technology Vehicles Manufacturing Loan Program

  • June 20, 2011

    Relocation and Operation of Machinery and Equipment
    CX(s) Applied: B1.31
    Date: 06/20/2011
    Location(s): Richland, Washington
    Office(s): Office of River Protection-Richland Office

  • June 16, 2011

    OPOC Engine Manufacturing Project
    CX(s) Applied: B1.31, B5.1
    Date: 06/16/2011
    Location(s): Troy, Michigan
    Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office

  • June 10, 2011

    NORDIC Wind Manufacturing Project
    CX(s) Applied: B1.31
    Date: 06/10/2011
    Location(s): Missouri
    Offices(s): Loan Guarantee Program Office

  • June 3, 2011

    Building 12-125 Modifications and Parking Lot
    CX(s) Applied: B1.15, B1.31
    Date: 06/03/2011
    Location(s): Amarillo, Texas
    Office(s): Pantex Site Office

  • May 23, 2011

    Calisolar 16,000 Metric Ton Upgraded Metallurgical-grade Silicon Manufacturing Facility
    CX(s) Applied: B1.31
    Date: 05/23/2011
    Location(s): Ontario, Ohio
    Office(s): Loan Guarantee Program Office