The U.S. Department of Energy (DOE) is proposing to provide federal funding to Coppin State University (CSU) to advance renewable energy technologi…
The project involves the complete rebuild and modernization of Boulder City's existing Substation No. 3. Activities include: Demolition and removal…
As part of Revision 1 to ECP INL-25-027, additional scope has been identified to support reactor demonstration at MFC-793. These activities are nec…
The purpose of this work is to install a cooling tower water treatment system at the Central Utility Building (CUB) that will not use any hazardous…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform installation or relocation and operation of machinery and equipment (includi…
Demo of existing compressed air piping and appurtenances and installation of two new variable speed 100 psi air compressors, air dryers, wet tanks,…
Install, operate, and maintain a Stratasys Fortus 450MC 3D Printer and accompanying Support Cleaning Apparatus (SCA) at 248-H.…
The Real-Time Radiography 2 (RTR-2) Trailer will be transferred to Waste Control Specialists (WCS) out of Texas. It will potentially be sent to add…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in B…
Install a compressed air dryer in 248-H for the EDM in the machine shop.…