B1.31: Installation or relocation of machinery and equipment
Installation or relocation and operation of machinery and equipment (including, but not limited to, laboratory equipment, electronic hardware, manufacturing machinery, maintenance equipment, and health and safety equipment), provided that uses of the installed or relocated items are consistent with the general missions of the receiving structure. Covered actions include modifications to an existing building, within or contiguous to a previously disturbed or developed area, that are necessary for equipment installation and relocation. Such modifications would not appreciably increase the footprint or height of the existing building or have the potential to cause significant changes to the type and magnitude of environmental impacts.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • November 19, 2012

    Alterations to Existing Buildings, Construction of Small-Scale Support Structures, and Relocation of Machinery and Equipment
    CX(s) Applied: B1.11, B1.15, B1.31
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • October 24, 2012

    Routine Operating and Administrative Activities (ROAA)
    CX(s) Applied: A8, A9, A11, B1.3, B1.23, B1.31
    Date: 10/24/2012
    Location(s): Missouri
    Offices(s): Kansas City Site Office

  • September 18, 2012

    New Orleans Emergency Generator Installation (900 Building)
    CX(s) Applied: B1.31
    Date: 09/18/2012
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 13, 2012

    Joyce Street Warehouse Facility; NREL
    CX(s) Applied: B1.31, B1.35
    Date: 09/13/2012
    Location(s): Colorado
    Offices(s): Golden Field Office

  • August 22, 2012

    A Novel Flash lronmaking Process
    CX(s) Applied: A9, B1.31, B3.6
    Date: 08/22/2012
    Location(s): Utah
    Offices(s): Golden Field Office

  • August 22, 2012

    Clemson University 15 Megawatt Hardware-In-the-Loop (HIL) Grid Simulator
    CX(s) Applied: A9, B1.31
    Date: 08/22/2012
    Location(s): South Carolina
    Offices(s): Golden Field Office

  • August 13, 2012

    Recovery Act State Energy Program Award for the State of Ohio - Revolving Loan Fund
    CX(s) Applied: A9, A11, B1.31, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19
    Date: 08/13/2012
    Location(s): Ohio
    Offices(s): Golden Field Office

  • July 26, 2012

    Install Power Metering for Strategic Petroleum Reserve Site Buildings
    CX(s) Applied: B1.31
    Date: 07/26/2012
    Location(s): Louisiana, Texas, Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 20, 2012

    Modify the HB-Line Can Inerting System
    CX(s) Applied: B1.31
    Date: 07/20/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 18, 2012

    Project 1769 - Relocate NC-135 Site Operations
    CX(s) Applied: B1.24, B1.31
    Date: 07/18/2012
    Location(s): Missouri
    Offices(s): Kansas City Site Office

  • June 21, 2012

    SANfab: Module Manufacturing Facility
    CX(s) Applied: A9, B1.31, B5.1
    Date: 06/21/2012
    Location(s): California
    Offices(s): Golden Field Office

  • June 21, 2012

    1366 Project Silicon: Reclaiming US Silicon Photovoltaic Leadership
    CX(s) Applied: A9, B1.31, B3.6, B5.1
    Date: 06/21/2012
    Location(s): Massachusetts
    Offices(s): Golden Field Office

  • June 19, 2012

    Building 93 Heat Exchanger Removal at National Energy Technology Laboratory Pittsburgh
    CX(s) Applied: B1.23, B1.31
    Date: 06/19/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 4, 2012

    Dry Air Glove Box Projects
    CX(s) Applied: B1.31
    Date: 06/04/2012
    Location(s): Tennessee
    Offices(s): Y-12 Site Office

  • May 21, 2012

    Idaho National Laboratory (INL) Administration Building (IAB) Communication Room Heating, Ventilation, and Air Conditioning (HVAC) Upgrade
    CX(s) Applied: B1.31
    Date: 05/21/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 14, 2012

    Milling Machine Replacement Projects
    CX(s) Applied: B1.31
    Date: 05/14/2012
    Location(s): Tennessee
    Offices(s): Y-12 Site Office

  • May 14, 2012

    Advanced Test Reactor (ATR) Primary Coolant System (PCS) Relief Valves Monorail System
    CX(s) Applied: B1.31
    Date: 05/14/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 27, 2012

    Electric Discharge Machining (EDM) Projects
    CX(s) Applied: B1.31
    Date: 04/27/2012
    Location(s): Tennessee
    Offices(s): Y-12 Site Office

  • April 27, 2012

    Californium Shuffler Removal Projects
    CX(s) Applied: B1.24, B1.31
    Date: 04/27/2012
    Location(s): Tennessee
    Offices(s): Y-12 Site Office

  • April 20, 2012

    Compressed Air System Replacement
    CX(s) Applied: B1.31, B2.2
    Date: 04/20/2012
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • April 16, 2012

    Prosser Hatchery Backup Generator Replacement
    CX(s) Applied: B1.31
    Date: 04/16/2012
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • March 26, 2012

    Captain Jack-Olinda RAS LLL/LT Replacement Project
    CX(s) Applied: B1.31
    Date: 03/26/2012
    Location(s): California
    Offices(s): Bonneville Power Administration

  • March 15, 2012

    Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change
    CX(s) Applied: B1.31
    Date: 03/15/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • January 24, 2012

    Project Eagle Phase 1 Direct Wafer/Cell Solar Facility
    CX(s) Applied: B1.31
    Date: 01/24/2012
    Location(s): Massachusetts
    Offices(s): Loan Guarantee Program Office

  • January 13, 2012

    Installation or Relocation of Machinery and Equipment
    CX(s) Applied: B1.31
    Date: 01/13/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office