Advanced Test Reactor (ATR) Primary Coolant System (PCS) Relief Valves Monorail System
CX(s) Applied: B1.31
Date: 05/14/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
Existing Regulations
B1.31: Installation or relocation of machinery and equipment
Installation or relocation and operation of machinery and equipment (including, but not limited to, laboratory equipment, electronic hardware, manufacturing machinery, maintenance equipment, and health and safety equipment), provided that uses of the installed or relocated items are consistent with the general missions of the receiving structure. Covered actions include modifications to an existing building, within or contiguous to a previously disturbed or developed area, that are necessary for equipment installation and relocation. Such modifications would not appreciably increase the footprint or height of the existing building or have the potential to cause significant changes to the type and magnitude of environmental impacts.
Previous Regulations
Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
May 14, 2012
-
April 27, 2012
Electric Discharge Machining (EDM) Projects
CX(s) Applied: B1.31
Date: 04/27/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office -
April 27, 2012
Californium Shuffler Removal Projects
CX(s) Applied: B1.24, B1.31
Date: 04/27/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office -
April 20, 2012
Compressed Air System Replacement
CX(s) Applied: B1.31, B2.2
Date: 04/20/2012
Location(s): New York
Offices(s): Naval Nuclear Propulsion Program -
April 16, 2012
Prosser Hatchery Backup Generator Replacement
CX(s) Applied: B1.31
Date: 04/16/2012
Location(s): Washington
Offices(s): Bonneville Power Administration -
March 26, 2012
Captain Jack-Olinda RAS LLL/LT Replacement Project
CX(s) Applied: B1.31
Date: 03/26/2012
Location(s): California
Offices(s): Bonneville Power Administration -
March 15, 2012
Materials and Fuels Complex (MFC) Contaminated Equipment Storage Building (CESB) Conversion Scope Change
CX(s) Applied: B1.31
Date: 03/15/2012
Location(s): Idaho
Offices(s): Nuclear Energy -
January 24, 2012
Project Eagle Phase 1 Direct Wafer/Cell Solar Facility
CX(s) Applied: B1.31
Date: 01/24/2012
Location(s): Massachusetts
Offices(s): Advanced Technology Vehicles Manufacturing Loan Program -
January 13, 2012
Installation or Relocation of Machinery and Equipment
CX(s) Applied: B1.31
Date: 01/13/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office -
December 21, 2011
Improving Recycling Capacity and Solid Waste Education in American Samoa
CX(s) Applied: B1.31, B1.35, A9
Date: 12/21/2011
Location(s): American Samoa
Offices(s): Golden Field Office -
December 20, 2011
Regional Test Center Project: Solar Technology Acceleration Center (SolarTAC)
CX(s) Applied: B1.15, B1.31, B5.15
Date: 12/20/2011
Location(s): Colorado
Offices(s): Golden Field Office -
December 15, 2011
Install Additional Expanded Basin Storage Racks
CX(s) Applied: B1.31
Date: 12/15/2011
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
December 15, 2011
MPLE Test Stand Replacement Project
CX(s) Applied: B1.3, B1.27, B1.31
Date: 12/15/2011
Location(s): Tennessee
Offices(s): Y-12 Site Office -
December 15, 2011
Waste Management Construction Support
CX(s) Applied: B1.3, B1.11, B1.23, B1.24, B1.27, B1.28, B1.29, B1.31, B2.1
Date: 12/15/2011
Location(s): Tennessee
Offices(s): Y-12 Site Office -
November 29, 2011
Parts Washer Project
CX(s) Applied: B1.23, B1.31
Date: 11/29/2011
Location(s): Tennessee
Offices(s): Y-12 Site Office -
September 8, 2011
Information Technology Hub Relocation
CX(s) Applied: B1.31
Date: 09/08/2011
Location(s): Morgantown, West Virginia
Office(s): Fossil Energy, National Energy Technology Laboratory -
September 6, 2011
Chrysler Group LLC, Revised Specific Project Application 2, Retooling, Reequipping and Engineering
CX(s) Applied: B1.31, B5.1
Date: 09/06/2011
Location(s): Auburn Hills, Michigan
Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office -
August 29, 2011
B83 1st Floor Renovation - Phase II Completion
CX(s) Applied: B1.29, B1.31, B2.1, B2.2
Date: 08/29/2011
Location(s): Pittsburgh, Pennsylvania
Office(s): Fossil Energy, National Energy Technology Laboratory -
August 3, 2011
B-Press and Extruder Modification
CX(s) Applied: A7, B1.3, B1.15, B1.16, B1.27, B1.31
Date: 08/03/2011
Location(s): Amarillo, Texas
Office(s): Pantex Site Office -
July 28, 2011
Project Eagle Direct Water Manufacturing Plants
CX(s) Applied: B1.23, B1.31
Date: 07/28/2011
Location(s): Lexington, Massachusetts
Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office -
July 20, 2011
Relocate Hydroburst System from 238-H to 234-7H
CX(s) Applied: B1.31
Date: 07/20/2011
Location(s): Aiken, South Carolina
Office(s): Savannah River Operations Office -
July 11, 2011
Solid State Batteries for Grid-Scale Energy Storage
CX(s) Applied: A1, A9, B1.31, B3.6
Date: 07/11/2011
Location(s): Hayward, California
Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory -
June 20, 2011
Aptera All-Electric and Hybrid Electric Vehicles
CX(s) Applied: B1.31, B5.1
Date: 06/20/2011
Location(s): Grand Rapids, Michigan
Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office -
June 20, 2011
Relocation and Operation of Machinery and Equipment
CX(s) Applied: B1.31
Date: 06/20/2011
Location(s): Richland, Washington
Office(s): Office of River Protection-Richland Office -
June 16, 2011
OPOC Engine Manufacturing Project
CX(s) Applied: B1.31, B5.1
Date: 06/16/2011
Location(s): Troy, Michigan
Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office