You are here

Categorical Exclusion Determinations: B1.31

Existing Regulations

B1.31: Installation or relocation of machinery and equipment
Installation or relocation and operation of machinery and equipment (including, but not limited to, laboratory equipment, electronic hardware, manufacturing machinery, maintenance equipment, and health and safety equipment), provided that uses of the installed or relocated items are consistent with the general missions of the receiving structure. Covered actions include modifications to an existing building, within or contiguous to a previously disturbed or developed area, that are necessary for equipment installation and relocation. Such modifications would not appreciably increase the footprint or height of the existing building or have the potential to cause significant changes to the type and magnitude of environmental impacts.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • August 30, 2010

    State Energy Program American Recovery and Reinvestment Act: Calisolar's Solar Manufacturing Capacity Expansion
    CX(s) Applied: B1.31, B5.1
    Date: 08/30/2010
    Location(s): Sunnyvale, California
    Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

  • August 30, 2010

    State Energy Program (SEP) American Recovery and Reinvestment Act (ARRA) EE-0000169
    CX(s) Applied: B1.31, B5.1
    Date: 08/30/2010
    Location(s): Portage, Indiana
    Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

  • August 27, 2010

    Energy Efficient Engines
    CX(s) Applied: A7, B1.31, B5.2
    Date: 08/27/2010
    Location(s): Racine, Wisconsin
    Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

  • August 27, 2010

    State Energy Program American Recovery and Reinvestment Act: Solar Power Incorporated Photovoltaic Panel Manufacturing Facility
    CX(s) Applied: B1.31, B5.1
    Date: 08/27/2010
    Location(s): McClellan, California
    Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

  • July 19, 2010

    Synchrophasor Based Tracking Three Phase State Estimator and Its Applications (Summary Categorical Exclusion)
    CX(s) Applied: B1.31, B4.6
    Date: 07/19/2010
    Location(s): Virginia
    Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory

  • July 15, 2010

    Gas Process Development Unit (GPDU)/Syngas (Synthetic Gas) Generator Decommissioning
    CX(s) Applied: B1.23, B1.27, B1.31, B3.6
    Date: 07/15/2010
    Location(s): Morgantown, West Virginia
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • June 21, 2010

    Energy Efficiency in State Buildings: Health and Human Resources
    CX(s) Applied: B1.24, B1.28, B1.31, B2.2, A9, B1.5, B5.1
    Date: 06/21/2010
    Location(s): West Virginia
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 9, 2010

    Rhode Island Electrical Power Technician (RIEPT) Program
    CX(s) Applied: B1.15, B1.31, A9
    Date: 06/09/2010
    Location(s): Warwick, Rhode Island
    Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory

  • June 2, 2010

    Pennsylvania Green Energy Works Targeted Grant - Native Energy Biogas Project
    CX(s) Applied: B1.15, B1.24, B1.31, A9, B5.1
    Date: 06/02/2010
    Location(s): Franklin County, Pennsylvania
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 2, 2010

    Energy Efficiency Program for Municipalities, Schools, Hospitals, Public Colleges
    CX(s) Applied: B1.24, B1.31, B2.2, A9, B5.1
    Date: 06/02/2010
    Location(s): Rochester, New York
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 1, 2010

    Funk Linko Inc.
    CX(s) Applied: B1.31, B5.1
    Date: 06/01/2010
    Location(s): Wheeling, Illinois
    Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

  • June 1, 2010

    Energy Retrofits for State Correctional Facilities
    CX(s) Applied: B1.23, B1.24, B1.28, B1.31, B2.2, A9, A11, B1.7, B5.1
    Date: 06/01/2010
    Location(s): Alabama
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 1, 2010

    Solid State Batteries for Grid-Scale Energy Storage
    CX(s) Applied: B1.31, B3.6, A1, A9, B5.1
    Date: 06/01/2010
    Location(s): Berkeley, California
    Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory

  • May 24, 2010

    Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel
    CX(s) Applied: B1.31, B2.1
    Date: 05/24/2010
    Location(s): Idaho
    Office(s): Idaho Operations Office, Nuclear Energy

  • May 19, 2010

    Energy Retrofits for State Correctional Facilities - Staton Corrections Facility Boiler
    CX(s) Applied: B1.24, B1.31, B2.2, A9, B5.1
    Date: 05/19/2010
    Location(s): Elmore, Alabama
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • May 19, 2010

    Energy Retrofits for State Correctional Facilities - Mobile Work Release/Work Center Facility Boiler
    CX(s) Applied: B1.24, B1.31, B2.2, A9, B5.1
    Date: 05/19/2010
    Location(s): Pritchard, Alabama
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • May 19, 2010

    Energy Retrofits for State Correctional Facilities - Draper Correctional Boiler
    CX(s) Applied: B1.24, B1.31, B2.2, A9, B5.1
    Date: 05/19/2010
    Location(s): Elmore, Alabama
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • May 19, 2010

    Energy Retrofits for State Correctional Facilities - Ozone Laundry Process
    CX(s) Applied: B1.31, A9, B5.1
    Date: 05/19/2010
    Location(s): Alabama
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • May 17, 2010

    Competitive Renewable Grants Program - Renewable Water Resources Biogas
    CX(s) Applied: B1.15, B1.31, A9, B5.1
    Date: 05/17/2010
    Location(s): Greenville, South Carolina
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • May 13, 2010

    Decommission of B4, 112, Atmospheric Cold Flow Laboratory
    CX(s) Applied: B1.24, B1.27, B1.31
    Date: 05/13/2010
    Location(s): Morgantown, West Virginia
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • April 28, 2010

    Balanced Wind: JADC Manufacturing Operations
    CX(s) Applied: B1.31, B5.1
    Date: 04/28/2010
    Location(s): Chicago, Illinois
    Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

  • April 22, 2010

    AA Solar Products Tracking System Factory
    CX(s) Applied: B1.31, B5.1
    Date: 04/22/2010
    Location(s): Illinois
    Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

  • April 22, 2010

    Manufacture of Battery Containers for Lithium Ion Batteries for the Aerospace and Hybrid Electric Vehicles (HEV) Markets
    CX(s) Applied: B1.24, B1.31, B5.1
    Date: 04/22/2010
    Location(s): Michigan
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • April 22, 2010

    Compressed Natural Gas Fueling Infrastructure Program (Republic Services of Florida)
    CX(s) Applied: B1.24, B1.31, B2.5, A11, B5.1
    Date: 04/22/2010
    Location(s): Florida
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • April 22, 2010

    Compressed Natural Gas Fueling Infrastructure Program (Veolia)
    CX(s) Applied: B1.24, B1.31, B2.5, A11, B5.1
    Date: 04/22/2010
    Location(s): Veolia, Florida
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory