Temporarily modify Saltstone Hopper Overflow Container (SHOC) Suction Line L-131 due to missing downcomer.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Curecanti-Lost C…
Bonneville Power Administration (BPA) proposes to partially fund, in the amount of $25,000, the slide repair of a multi-easement access road that l…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to remove four fish passa…
The proposed work activity is to transfer wastewater from the F-Canyon B-Basins to the Effluent Treatment Facility (ETF) using an approved Waste Co…
The existing H-Canyon Railroad Tunnel (RRT) rollup door has exceeded its expected lifespan and needs to be replaced.…
The 512-S building, which is currently in the Suspended Operations state, will be modified to temporarily store Strip Effluent (SE) from the Salt W…
LM is responsible for long-term surveillance and maintenance of the Tuba City, Arizona, Disposal Site. LM is proposing the Secondary Source Term an…
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe (the Tribe) to install new fencing along the boundary of the Tribe's Red…
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe (NPT) to conduct aerial surveys to assess potential locations for restor…