This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
The Kesselring Site Building 107 Refresh Project will address three key building renovation activities: a full-scale roof replacement, roof-top air handler unit replacements, and dust collection system ductwork reconfiguration.
Kansas City National Security Campus (KCNSC), KCNSC26-03, the facility will be located at TA-193 and will be a prefabricated indoor shooting range …
Replace rotten wood supporting BARD wall mount HVAC system at 704-53E.…
The Kesselring Site Outfall 002 Redesign and Replacement Project consists of raising the bottom elevation of the Outfall 002 trench to eliminate the standing water that produces algae and the potential for turbulent discharges to the Glowegee Creek.
The Kesselring Site Reverse Osmosis System Overhaul Project will replace the current Reverse Osmosis (RO) system located inside the KS Boiler House with a new water purification system.
Fermi National Accelerator Laboratory (Fermilab) proposes to continue the periodic shipment of low-level radioactive waste, excluding high level wa…
Corrective maintenance will be conducted in 233-H that may temporarily increase emissions.…
This activity covers installing new flooring in offices in building 711-9N.…
Replace 3 electrical supplied wall heaters in building 717-1N.…