Maintenance will be fabricating a high angle iron frame for a tool cabinet to go in in the L-Area Disassembly Basin.…
Gate valve (GCAS-V-RWW315) for Tails Pump Suction Drain valve located at M-1 Air Stripper in M Area is leaking and needs to be replaced.…
Perform relamping and lighting repairs in Solid Waste Deactivation Management (SWDM).…
This evaluation is to analyze the impacts of the new density analysis method associated with the FCA project for H-Canyon.…
Performing chemical separations at 999-2W to study the kinetics of different processes and chemical transformations.…
Bonneville Power Administration (BPA) proposes to install electronic equipment and fiber optic cable to facilitate the interconnection of One Energ…
CX-035616: Novel Composite Turbine Blade Testing and Validation using the OSTEC Test Bed at the AMEC
The U.S. Department of Energy (DOE) is proposing to provide federal funding to University of New Hampshire (UNH) to design, develop, fabricate, and…
Paint and replace carpet at 703-46A per AOS work request 00840764.…
Replace exterior doors at 784-3A…
Replacement of lighting to take place at 736-A in rooms 101-A, 102, 124, 126, 129, 130, 131, 131-A, 132, 133, 134, 135, 136, 136-A, and 143 thru 15…