You are here

Categorical Exclusion (CX) Determinations By Date

  • January 29, 2014

    I-75 Green Corridor Project
    CX(s) Applied: A1, A9, B5.22
    Date: 01/29/2014
    Location(s): Tennessee, Georgia, Florida
    Offices(s): National Energy Technology Laboratory

  • January 29, 2014

    Final Rule for New and Amended Energy Conservation Standards for Metal Halide Lamp Fixtures
    CX(s) Applied: B5.1
    Date: 01/29/2014
    Location(s): CX: none
    Offices(s): Golden Field Office

  • January 29, 2014

    McNary Substation Equipment Acquisition
    CX(s) Applied: B1.24
    Date: 01/29/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 29, 2014

    Wood Pole Replacements Along the Targhee Tap and Targhee-Drummond 115-kilovolt (kV) Transmission Line Rights-Of-Way
    CX(s) Applied: B1.3
    Date: 01/29/2014
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • January 28, 2014

    Magnetic Mountain Microwave Tower Access road Maintenance, Rio Blanco County, Colorado
    CX(s) Applied: B1.3
    Date: 01/28/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 28, 2014

    Archer-Cheyenne North/South 115 Kilovolt Transmission Line Structure Replacement, Laramie County, Wyoming
    CX(s) Applied: B4.13
    Date: 01/28/2014
    Location(s): Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 28, 2014

    Carbon Dioxide Capture By Cold Membrane Operation with Actual Coal-Fired Power Plant Flue Gas
    CX(s) Applied: A1, A9, B3.6, B5.5
    Date: 01/28/2014
    Location(s): CX: none, Delaware, Alabama, Pennsylvania, California
    Offices(s): National Energy Technology Laboratory

  • January 28, 2014

    Building 26 FSARS
    CX(s) Applied: B1.3, Facility operation and maintenance
    Date: 01/28/2014
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • January 28, 2014

    South Louisiana EOR/Sequestration Research and Development Project
    CX(s) Applied: A1, A9, A11, B3.6
    Date: 01/28/2014
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • January 28, 2014

    South Louisiana EOR/Sequestration Research and Development Project
    CX(s) Applied: A1, A9, A11, B3.6
    Date: 01/28/2014
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • January 27, 2014

    Replace Bayou Choctaw 16” B-Spec Crude Oil Header Piping
    CX(s) Applied: B1.3
    Date: 01/27/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 27, 2014

    Subcontractor Repair of Roof Leaks at 245-10F
    CX(s) Applied: B1.3
    Date: 01/27/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 27, 2014

    685-G PAR Pond and 686-G L-Lake Sluice Gate Conduit Cleanouts/Inspections
    CX(s) Applied: B1.3
    Date: 01/27/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 27, 2014

    Replace Fiber Optic Receivers/Transmitters, etc. on S&S Systems
    CX(s) Applied: B1.7
    Date: 01/27/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 27, 2014

    Synthesis of Inorganic Materials Using a Microwave Reactor
    CX(s) Applied: B3.6
    Date: 01/27/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 27, 2014

    Laboratory Kd Measurements of Non-contaminated Solids and Rad Spiked Solutions
    CX(s) Applied: B3.6
    Date: 01/27/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 27, 2014

    Alternative Reductant Melter Evaluation Using the Cold Cap Evaluation Furnace (CEF)
    CX(s) Applied: B3.6
    Date: 01/27/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 27, 2014

    Advanced Analytical Methods for Air and Stray Gas Emissions and Produced Brine Characterization
    CX(s) Applied: A9, A11, B3.6
    Date: 01/27/2014
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • January 27, 2014

    Fiber Installation at Snohomish, SnoKing and Murray Substations
    CX(s) Applied: B4.7
    Date: 01/27/2014
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 27, 2014

    Advanced Analytical Methods for Air and Stray Gas Emissions and Produced Brine Characterization
    CX(s) Applied: A9, A11, B3.1, B3.6
    Date: 01/27/2014
    Location(s): Pennsylvania, Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • January 27, 2014

    Commercialization of an Atmospheric Iron-Based Coal Direct Chemical Looping (CDCL) Process for Power…
    CX(s) Applied: A9, B3.6
    Date: 01/27/2014
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • January 26, 2014

    Routine Maintenance Activities
    CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, B1.13, B1.15, B1.16, B1.17, B1.21, B1.22, B1.23, B1.27, B1.28, B1.31, B1.32, B2.1, B2.2, B2.3, B2.5
    Date: 01/26/2014
    Location(s): New Jersey
    Offices(s): Princeton Site Office

  • January 26, 2014

    Bench-Scale Research Projects & Conventional Laboratory Operations
    CX(s) Applied: B3.6
    Date: 01/26/2014
    Location(s): New Jersey
    Offices(s): Princeton Site Office

  • January 23, 2014

    Substation Maintenance and Renovation Activities for 2014
    CX(s) Applied: B1.3
    Date: 01/23/2014
    Location(s): Arizona, California, Nevada
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 23, 2014

    Construct Solar Energy Generation Facility
    CX(s) Applied: B5.16
    Date: 01/23/2014
    Location(s): Nevada
    Offices(s): National Energy Technology Laboratory