Subcontractor will repair 705-C. Revision 1 includes the additional work scope at this facility (705-C). Subcontractor will disturb the existing ro…
This scope of work is for the painting of exterior shop doors/roll-up doors, and around loading zones at 704-C.…
A vendor will generate and/or remove excess wastewater from various systems/containments located across SRS.…
Subcontractor will repair roof at 716-N. The Subcontractor will not disturb the existing roof while performing these repairs on 716-N.…
In support of an NNSA initiative to increase living / office space for employees without increasing building footprint area, the Building 105-K, Pe…
The goal of this mercury precipitation experiments is to evaluate the use of NaI in the sequestering of mercury from a typical SRS radioactive samp…
LM is proposing to conduct routine long-term surveillance and maintenance (LTS and M) actions at the Boiling Nuclear Superheater (BONUS), Puerto Ri…
The U.S. Department of Energy (DOE) is proposing to provide funding to University of Alaska Fairbanks (UAF) to develop a replicable community-led c…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the Town of Morrisville, North Carolina, for th…
Bonneville Power Administration (BPA) proposes to fund the Nez Perce Tribe (the Tribe) to construct post-assisted log structures (PALS) and beaver …