You are here

Categorical Exclusion (CX) Determinations By Date

  • January 9, 2013

    C-CA-CAM Building Complex Demolition and Site Restoration
    CX(s) Applied: B1.11, B1.16, B1.17, B1.23, B1.24, B1.27, B1.30, B1.33, B1.34
    Date: 01/09/2013
    Location(s): Pennsylvania
    Offices(s): Naval Nuclear Propulsion Program

  • January 8, 2013

    Building 4 Drain Line Replacement
    CX(s) Applied: B1.3, B1.15, B1.31
    Date: 01/08/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • January 8, 2013

    Rogue-Gold Beach No. 2 Disconnect Switch Replacement
    CX(s) Applied: B4.6
    Date: 01/08/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 8, 2013

    Production of Coal/Biomass-to-Liquid-Based Jet Fuels from Biomass-Based Feedstocks
    CX(s) Applied: B3.6
    Date: 01/08/2013
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • January 7, 2013

    Project Icebreaker
    CX(s) Applied: A9, B3.1
    Date: 01/07/2013
    Location(s): Ohio
    Offices(s): Golden Field Office

  • January 7, 2013

    Technology Research, Development and Tools for Clean Biomass Cookstoves
    CX(s) Applied: A9, B3.6, B5.15
    Date: 01/07/2013
    Location(s): New York, California, Colorado
    Offices(s): Golden Field Office

  • January 7, 2013

    Minnesota Chippewa Tribe, Minnesota Energy Efficiency and Conservation Block Grant
    CX(s) Applied: A9, B5.1, B5.16
    Date: 01/07/2013
    Location(s): Minnesota
    Offices(s): Golden Field Office

  • January 7, 2013

    Refinery Upgrading of Hydropyrolysis Oil from Biomass
    CX(s) Applied: A9, B3.6
    Date: 01/07/2013
    Location(s): Illinois
    Offices(s): Golden Field Office

  • January 7, 2013

    Video Inspection of Bryan Mound 36-inch Raw Water Pipeline
    CX(s) Applied: B1.3
    Date: 01/07/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 7, 2013

    Beck Road Substation Meter Installation
    CX(s) Applied: B1.7
    Date: 01/07/2013
    Location(s): Idaho
    Offices(s): Bonneville Power Administration

  • January 7, 2013

    Roosevelt Radio Station Emergency Generator Removal and Replacement
    CX(s) Applied: B1.3
    Date: 01/07/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • January 3, 2013

    Maintenance and Wood Pole Replacement along the Gila Wellton Mohawk 161 Kilovolt Transmission Line
    CX(s) Applied: B1.3
    Date: 01/03/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 2, 2013

    Strategic Petroleum Reserve Site Subsidence Surveys, 2013-2017
    CX(s) Applied: B3.1
    Date: 01/02/2013
    Location(s): Louisiana, Texas, Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 2, 2013

    Simplified Predictive Models for Carbon Dioxide Sequestration Performance Assessment
    CX(s) Applied: A9
    Date: 08/15/2012
    Location(s): Ohio, California
    Offices(s): National Energy Technology Laboratory

  • December 31, 2012

    Bertelsen Substation Metering Panel Segment Addition
    CX(s) Applied: B1.7
    Date: 12/31/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • December 31, 2012

    Tualatin Valley Water District Waterline Land Use Review Request
    CX(s) Applied: B4.9
    Date: 12/31/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • December 27, 2012

    Continuation of Yakama Nation Sturgeon Management Project
    CX(s) Applied: B1.20
    Date: 12/27/2012
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • December 27, 2012

    Sale of Lakeside Radio Station
    CX(s) Applied: B1.24
    Date: 12/27/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • December 27, 2012

    Williams Northwest Pipeline Land Use Review Request
    CX(s) Applied: B4.9
    Date: 12/27/2012
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 27, 2012

    Finely Creek and North Valley Creek Property Funding
    CX(s) Applied: B1.25
    Date: 12/27/2012
    Location(s): Montana, Montana
    Offices(s): Bonneville Power Administration

  • December 26, 2012

    Certifying the Performance of Small Wind Turbines
    CX(s) Applied: A9, A11
    Date: 12/26/2012
    Location(s): Colorado
    Offices(s): Golden Field Office

  • December 21, 2012

    Columbia Rural Electric Association Walla Walla Hydroelectric Project
    CX(s) Applied: B4.1
    Date: 12/21/2012
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 20, 2012

    AMP! Advanced Manufacturing and Prototyping Center of East Tennessee
    CX(s) Applied: A9, A11, B3.6
    Date: 12/20/2012
    Location(s): Tennessee
    Offices(s): Golden Field Office

  • December 20, 2012

    WVDP-2012-02 Routine Maintenance
    CX(s) Applied: B1.3
    Date: 12/20/2012
    Location(s): New York
    Offices(s): West Valley Demonstration Project

  • December 19, 2012

    723-A Distribution Panel 4 (DB4) Replacement
    CX(s) Applied: B1.3
    Date: 12/19/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office