You are here

Categorical Exclusion Determinations: B2.2

Existing Regulations

B2.2: Building and equipment instrumentation
Installation of, or improvements to, building and equipment instrumentation (including, but not limited to, remote control panels, remote monitoring capability, alarm and surveillance systems, control systems to provide automatic shutdown, fire detection and protection systems, water consumption monitors and flow control systems, announcement and emergency warning systems, criticality and radiation monitors and alarms, and safeguards and security equipment).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • June 21, 2011

    Recovery Act: Development of Low-Cost Bio-Based Phase Change Material
    CX(s) Applied: A11, B2.2, B3.6, B5.1
    Date: 06/21/2011
    Location(s): Charlotte, North Carolina
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 14, 2011

    Recovery Act: San Bernardino Associated Government Natural Gas Truck Project
    CX(s) Applied: B2.2, B2.3, B5.1
    Date: 06/14/2011
    Location(s): Fontana, California
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 7, 2011

    Add a H Area Diverson Box 8 (HDB-8) Continuous Air Monitor (CAM) Low Activity alarm to the Distributed Control System (DCS)
    CX(s) Applied: B2.2
    Date: 06/07/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Sandia Site Office

  • May 24, 2011

    United States Navy Security System Upgrades
    CX(s) Applied: B1.15, B2.2
    Date: 05/24/2011
    Location(s): Albuquerque, NM; Kings Bay, GA; Bangor, WA, Georgia, New Mexico, Washington
    Office(s): NNSA-Headquarters, Sandia Site Office

  • May 13, 2011

    State Energy Program American Recovery and Reinvestment Act Program Administration
    CX(s) Applied: A1, A9, A11, B2.2, B5.1
    Date: 05/13/2011
    Location(s): Virginia
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • May 13, 2011

    Economic Development Program
    CX(s) Applied: A1, A9, A11, B2.2, B5.1
    Date: 05/13/2011
    Location(s): Virginia
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • March 25, 2011

    Heating, Ventilation, and Air Conditioning Efficiency and Replacement Project
    CX(s) Applied: B1.4, B2.2, B2.5, B5.1
    Date: 03/25/2011
    Location(s): Oldham County, Kentucky
    Office(s): Civilian Radioactive Waste Management, Energy Efficiency and Renewable Energy

  • March 25, 2011

    City Facilities Lighting Upgrades
    CX(s) Applied: B2.2, B2.5, B5.1
    Date: 03/25/2011
    Location(s): Urbana, Illinois
    Office(s): Civilian Radioactive Waste Management, Energy Efficiency and Renewable Energy

  • March 17, 2011

    Plug and Play Distributed Power Systems for Smart-Grid Connected Buildings
    CX(s) Applied: A9, B2.2, B5.1
    Date: 03/17/2011
    Location(s): Madison, Wisconsin
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • March 17, 2011

    Plug and Play Distributed Power Systems for Smart-Grid Connected Buildings
    CX(s) Applied: A9, B2.2, B5.1
    Date: 03/17/2011
    Location(s): East Hartford, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • March 17, 2011

    Plug and Play Distributed Power Systems for Smart-Grid Connected Buildings
    CX(s) Applied: A9, B2.2, B5.1
    Date: 03/17/2011
    Location(s): Bristol, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • March 10, 2011

    Provide Power and Uninterruptible Power Supply System in 241-062F
    CX(s) Applied: B2.2
    Date: 03/10/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • February 28, 2011

    Replacement of the F/H Labs Fire Alarm Control Panel
    CX(s) Applied: B2.2
    Date: 02/28/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • February 17, 2011

    Lincoln County Energy Efficiency Retrofits
    CX(s) Applied: B2.2, B2.5, B5.1
    Date: 02/17/2011
    Location(s): Lincoln County, South Dakota
    Office(s): Energy Efficiency and Renewable Energy

  • February 17, 2011

    Woburn Energy Efficiency Retrofits
    CX(s) Applied: B1.4, B2.2, B2.5, B5.1
    Date: 02/17/2011
    Location(s): Woburn, Massachusetts
    Office(s): Energy Efficiency and Renewable Energy

  • February 10, 2011

    Windham Superior Courthouse Weatherization Retrofits

    Date: 02/10/2011
    Location(s): Windham County, Vermont
    Office(s): Energy Efficiency and Renewable Energy

  • January 31, 2011

    Raise the Tank26 High Liquid Level Conductivity Probe Setpoint to 362 Inches
    CX(s) Applied: B2.2
    Date: 01/31/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • January 31, 2011

    Radiation Portal Monitor
    CX(s) Applied: B2.2
    Date: 01/31/2011
    Location(s): Menlo Park, California
    Office(s): Stanford Linear Accelerator Site Office

  • January 25, 2011

    Rework Fire-rated Penetration Seal Per F-DCF-H-00591HB-Line Room 602A Floor
    CX(s) Applied: B2.2
    Date: 01/25/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • January 25, 2011

    HB-Line Standpipe Installation
    CX(s) Applied: B2.2
    Date: 01/25/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • January 4, 2011

    Arkansas Energy Technology Loan Program - General Energy Solutions Anaerobic Digester Loan Request

    Date: 01/04/2011
    Location(s): Clarksville, Arkansas
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • January 3, 2011

    City of Newark, Energy Conservation and Efficiency Efforts
    CX(s) Applied: B2.2, B2.5, B5.1
    Date: 01/03/2011
    Location(s): Newark, Delaware
    Office(s): Energy Efficiency and Renewable Energy

  • January 3, 2011

    Eastern BioPlastics - Manufacturing of Keratin (Poultry Feathers) for use in Bioplastics
    CX(s) Applied: A1, B2.2
    Date: 01/03/2011
    Location(s): Crawford, Virginia
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • December 30, 2010

    Lyon County Law Enforcement Center Equipment Retrofit/Upgrade
    CX(s) Applied: B1.4, B2.2, B2.5, B5.1
    Date: 12/30/2010
    Location(s): Lyon County, Kansas
    Office(s): Energy Efficiency and Renewable Energy

  • December 22, 2010

    State Energy Program - Grants to Promote Mid-Size Renewables at Private and Government Buildings
    CX(s) Applied: A7, B1.3, B1.4, B1.15, B1.22, B1.24, B1.31, B2.2, B2.5, B5.1
    Date: 12/22/2010
    Location(s): Maryland
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory