You are here

Categorical Exclusion Determinations: B2.2

Existing Regulations

B2.2: Building and equipment instrumentation
Installation of, or improvements to, building and equipment instrumentation (including, but not limited to, remote control panels, remote monitoring capability, alarm and surveillance systems, control systems to provide automatic shutdown, fire detection and protection systems, water consumption monitors and flow control systems, announcement and emergency warning systems, criticality and radiation monitors and alarms, and safeguards and security equipment).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • September 28, 2011

    Building 903 Renovation
    CX(s) Applied: B1.16, B1.29, B2.1, B2.2, B2.5
    Date: 09/28/2011
    Location(s): Pittsburgh, Pennsylvania
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • September 28, 2011

    Building 83 Lab 242 Renovations as per Office of Research and Development Modifications
    CX(s) Applied: B1.29, B2.1, B2.2
    Date: 09/28/2011
    Location(s): Pittsburgh, Pennsylvania
    Office(s): Fossil Energy, Sandia Site Office

  • September 26, 2011

    ER52 Fire Station Warning Signals
    CX(s) Applied: B2.2
    Date: 09/26/2011
    Location(s): Richland, Washington
    Office(s): River Protection-Richland Operations Office, Golden Field Office

  • September 13, 2011

    Grant for State Sponsored Renewable Energy and Energy Efficiency Projects - Montclair University Combined Heat and Power
    CX(s) Applied: B1.15, B2.2, B5.1
    Date: 09/13/2011
    Location(s): New Jersey
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • August 29, 2011

    B83 1st Floor Renovation - Phase II Completion
    CX(s) Applied: B1.29, B1.31, B2.1, B2.2
    Date: 08/29/2011
    Location(s): Pittsburgh, Pennsylvania
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • August 25, 2011

    HAZGAS and Fire Alarm Monitoring System
    CX(s) Applied: A11, B2.2, B2.3
    Date: 08/25/2011
    Location(s): Albany, Oregon
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • August 18, 2011

    Fuel Cell Program
    CX(s) Applied: A1, B2.2, B5.1
    Date: 08/18/2011
    Location(s): Mansfield, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • August 8, 2011

    Fuel Cell Program
    CX(s) Applied: A1, B2.2, B5.1
    Date: 08/08/2011
    Location(s): Weston, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • August 2, 2011

    Lawrence Government Energy Efficiency Retrofit Project
    CX(s) Applied: B1.4, B2.2, B2.5, B5.1
    Date: 08/02/2011
    Location(s): Lawrence, Indiana
    Office(s): Energy Efficiency and Renewable Energy, Nevada Site Office

  • August 1, 2011

    Fuel Cell Program
    CX(s) Applied: A1, B2.2, B5.1
    Date: 08/01/2011
    Location(s): Hamden, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • August 1, 2011

    Building 20 Fleet Interactive Display Equipment Facility Expansion
    CX(s) Applied: B1.15, B1.16, B2.2, B2.5
    Date: 08/01/2011
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • July 19, 2011

    New Orleans Security Upgrades
    CX(s) Applied: B2.2
    Date: 07/19/2011
    Location(s): New Orleans, Louisiana
    Office(s): Strategic Petroleum Reserve Field Office

  • July 13, 2011

    Utility Metering Installation: B3, B14, B36
    CX(s) Applied: B1.15, B2.2
    Date: 07/13/2011
    Location(s): Morgantown, West Virginia
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • June 29, 2011

    Repair the F-Canyon Stack Isokinetic Sampler
    CX(s) Applied: B2.2
    Date: 06/29/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • June 28, 2011

    Fuel Cell Program
    CX(s) Applied: A1, B1.15, B2.2, B5.1
    Date: 06/28/2011
    Location(s): New Britain, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 21, 2011

    Recovery Act: Development of Low-Cost Bio-Based Phase Change Material
    CX(s) Applied: A11, B2.2, B3.6, B5.1
    Date: 06/21/2011
    Location(s): Charlotte, North Carolina
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 14, 2011

    Recovery Act: San Bernardino Associated Government Natural Gas Truck Project
    CX(s) Applied: B2.2, B2.3, B5.1
    Date: 06/14/2011
    Location(s): Fontana, California
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 7, 2011

    Add a H Area Diverson Box 8 (HDB-8) Continuous Air Monitor (CAM) Low Activity alarm to the Distributed Control System (DCS)
    CX(s) Applied: B2.2
    Date: 06/07/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Sandia Site Office

  • May 24, 2011

    United States Navy Security System Upgrades
    CX(s) Applied: B1.15, B2.2
    Date: 05/24/2011
    Location(s): Albuquerque, NM; Kings Bay, GA; Bangor, WA, Georgia, New Mexico, Washington
    Office(s): NNSA-Headquarters, Sandia Site Office

  • May 13, 2011

    State Energy Program American Recovery and Reinvestment Act Program Administration
    CX(s) Applied: A1, A9, A11, B2.2, B5.1
    Date: 05/13/2011
    Location(s): Virginia
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • May 13, 2011

    Economic Development Program
    CX(s) Applied: A1, A9, A11, B2.2, B5.1
    Date: 05/13/2011
    Location(s): Virginia
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • March 25, 2011

    Heating, Ventilation, and Air Conditioning Efficiency and Replacement Project
    CX(s) Applied: B1.4, B2.2, B2.5, B5.1
    Date: 03/25/2011
    Location(s): Oldham County, Kentucky
    Office(s): Civilian Radioactive Waste Management, Energy Efficiency and Renewable Energy

  • March 25, 2011

    City Facilities Lighting Upgrades
    CX(s) Applied: B2.2, B2.5, B5.1
    Date: 03/25/2011
    Location(s): Urbana, Illinois
    Office(s): Civilian Radioactive Waste Management, Energy Efficiency and Renewable Energy

  • March 17, 2011

    Plug and Play Distributed Power Systems for Smart-Grid Connected Buildings
    CX(s) Applied: A9, B2.2, B5.1
    Date: 03/17/2011
    Location(s): Madison, Wisconsin
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • March 17, 2011

    Plug and Play Distributed Power Systems for Smart-Grid Connected Buildings
    CX(s) Applied: A9, B2.2, B5.1
    Date: 03/17/2011
    Location(s): East Hartford, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory