Categorical Exclusion Determinations: B2.2

Existing Regulations

B2.2: Building and equipment instrumentation
Installation of, or improvements to, building and equipment instrumentation (including, but not limited to, remote control panels, remote monitoring capability, alarm and surveillance systems, control systems to provide automatic shutdown, fire detection and protection systems, water consumption monitors and flow control systems, announcement and emergency warning systems, criticality and radiation monitors and alarms, and safeguards and security equipment).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 29, 2011

    Control Room Consolidation
    CX(s) Applied: B2.2
    Date: 12/29/2011
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 23, 2011

    Energy Efficiency Program for Municipalities, Schools, Hospitals, Public Colleges and Universities
    CX(s) Applied: A1, A9, A11, B1.4, B2.2, B5.1
    Date: 12/23/2011
    Location(s): New York
    Offices(s): National Energy Technology Laboratory

  • December 9, 2011

    B94 Hazardous Gas Alarms
    CX(s) Applied: B1.29, B2.1, B2.2, B2.3, B2.5
    Date: 12/09/2011
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • November 28, 2011

    Nuclear Energy University Programs Minor Reactor Upgrade Request for Enhancement of Safety and Operational Monitoring Systems and Research Capabilities of the Ohio State University Nuclear Reactor Laboratory
    CX(s) Applied: B2.2
    Date: 11/28/2011
    Location(s): Ohio
    Offices(s): Nuclear Energy, Idaho Operations Office

  • November 28, 2011

    Reactor Upgrade Grant - Rhode Island Atomic Energy Commission
    CX(s) Applied: B2.2
    Date: 11/28/2011
    Location(s): Rhode Island
    Offices(s): Nuclear Energy, Idaho Operations Office

  • November 28, 2011

    Nuclear Energy University Programs Infrastructure Program: Minor Reactor Upgrades - University if Wisconsin
    CX(s) Applied: B2.2
    Date: 11/28/2011
    Location(s): Wisconsin
    Offices(s): Nuclear Energy, Idaho Operations Office

  • November 28, 2011

    Safety and Security Component Installation and Alteration
    CX(s) Applied: B1.11, B2.2
    Date: 11/28/2011
    Location(s): Washington
    Offices(s): Science, Pacific Northwest Site Office

  • September 28, 2011

    Building 903 Renovation
    CX(s) Applied: B1.16, B1.29, B2.1, B2.2, B2.5
    Date: 09/28/2011
    Location(s): Pittsburgh, Pennsylvania
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • September 28, 2011

    Building 83 Lab 242 Renovations as per Office of Research and Development Modifications
    CX(s) Applied: B1.29, B2.1, B2.2
    Date: 09/28/2011
    Location(s): Pittsburgh, Pennsylvania
    Office(s): Fossil Energy, Sandia Site Office

  • September 26, 2011

    ER52 Fire Station Warning Signals
    CX(s) Applied: B2.2
    Date: 09/26/2011
    Location(s): Richland, Washington
    Office(s): River Protection-Richland Operations Office, Golden Field Office

  • September 13, 2011

    Grant for State Sponsored Renewable Energy and Energy Efficiency Projects - Montclair University Combined Heat and Power
    CX(s) Applied: B1.15, B2.2, B5.1
    Date: 09/13/2011
    Location(s): New Jersey
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • August 29, 2011

    B83 1st Floor Renovation - Phase II Completion
    CX(s) Applied: B1.29, B1.31, B2.1, B2.2
    Date: 08/29/2011
    Location(s): Pittsburgh, Pennsylvania
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • August 25, 2011

    HAZGAS and Fire Alarm Monitoring System
    CX(s) Applied: A11, B2.2, B2.3
    Date: 08/25/2011
    Location(s): Albany, Oregon
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • August 18, 2011

    Fuel Cell Program
    CX(s) Applied: A1, B2.2, B5.1
    Date: 08/18/2011
    Location(s): Mansfield, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • August 8, 2011

    Fuel Cell Program
    CX(s) Applied: A1, B2.2, B5.1
    Date: 08/08/2011
    Location(s): Weston, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • August 2, 2011

    Lawrence Government Energy Efficiency Retrofit Project
    CX(s) Applied: B1.4, B2.2, B2.5, B5.1
    Date: 08/02/2011
    Location(s): Lawrence, Indiana
    Office(s): Energy Efficiency and Renewable Energy, Nevada Site Office

  • August 1, 2011

    Fuel Cell Program
    CX(s) Applied: A1, B2.2, B5.1
    Date: 08/01/2011
    Location(s): Hamden, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • August 1, 2011

    Building 20 Fleet Interactive Display Equipment Facility Expansion
    CX(s) Applied: B1.15, B1.16, B2.2, B2.5
    Date: 08/01/2011
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • July 19, 2011

    New Orleans Security Upgrades
    CX(s) Applied: B2.2
    Date: 07/19/2011
    Location(s): New Orleans, Louisiana
    Office(s): Strategic Petroleum Reserve Field Office

  • July 13, 2011

    Utility Metering Installation: B3, B14, B36
    CX(s) Applied: B1.15, B2.2
    Date: 07/13/2011
    Location(s): Morgantown, West Virginia
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • June 29, 2011

    Repair the F-Canyon Stack Isokinetic Sampler
    CX(s) Applied: B2.2
    Date: 06/29/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • June 28, 2011

    Fuel Cell Program
    CX(s) Applied: A1, B1.15, B2.2, B5.1
    Date: 06/28/2011
    Location(s): New Britain, Connecticut
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 21, 2011

    Recovery Act: Development of Low-Cost Bio-Based Phase Change Material
    CX(s) Applied: A11, B2.2, B3.6, B5.1
    Date: 06/21/2011
    Location(s): Charlotte, North Carolina
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 14, 2011

    Recovery Act: San Bernardino Associated Government Natural Gas Truck Project
    CX(s) Applied: B2.2, B2.3, B5.1
    Date: 06/14/2011
    Location(s): Fontana, California
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • June 7, 2011

    Add a H Area Diverson Box 8 (HDB-8) Continuous Air Monitor (CAM) Low Activity alarm to the Distributed Control System (DCS)
    CX(s) Applied: B2.2
    Date: 06/07/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Sandia Site Office