You are here

Categorical Exclusion Determinations: B2.2

Existing Regulations

B2.2: Building and equipment instrumentation
Installation of, or improvements to, building and equipment instrumentation (including, but not limited to, remote control panels, remote monitoring capability, alarm and surveillance systems, control systems to provide automatic shutdown, fire detection and protection systems, water consumption monitors and flow control systems, announcement and emergency warning systems, criticality and radiation monitors and alarms, and safeguards and security equipment).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • August 13, 2012

    Recovery Act State Energy Program Award for the State of Ohio - Revolving Loan Fund
    CX(s) Applied: A9, A11, B1.31, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19
    Date: 08/13/2012
    Location(s): Ohio
    Offices(s): Golden Field Office

  • August 8, 2012

    Storage Water Tank Level Wireless Instrumentation Upgrade
    CX(s) Applied: B2.2
    Date: 08/08/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 3, 2012

    Remove the Highpoint VAMP ED-641000-IT-RISH-6097A From Service
    CX(s) Applied: B2.2
    Date: 08/03/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 3, 2012

    Knolls Laboratory Q14 Sprinkler System Upgrade Project
    CX(s) Applied: B1.15, B2.2
    Date: 08/03/2012
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • July 24, 2012

    Disassemble and Remove Tritium Facility Perimeter Intrusion Detection And Assessment System
    CX(s) Applied: B2.2
    Date: 07/24/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 23, 2012

    Utility Metering Installation For: Buildings 2, 4, 5, 13, 17, 29, 33
    CX(s) Applied: B2.2
    Date: 07/23/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • July 16, 2012

    Building 1 Renovation
    CX(s) Applied: B1.15, B1.16, B2.1, B2.2, B2.5
    Date: 07/16/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • June 21, 2012

    Upgrade Room Exhaust Flow Path of HB-Line Confinement Ventilation System
    CX(s) Applied: B2.2
    Date: 06/21/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 19, 2012

    Middlesex Community College - Geothermal Project
    CX(s) Applied: A9, B2.1, B2.2, B5.19
    Date: 06/19/2012
    Location(s): Massachusetts
    Offices(s): Golden Field Office

  • June 13, 2012

    Black Hills State Heating and Cooling Plant
    CX(s) Applied: B1.15, B1.23, B2.2, B5.1, B5.2, B5.4
    Date: 06/13/2012
    Location(s): South Dakota
    Offices(s): National Energy Technology Laboratory

  • June 11, 2012

    Economic Development - Lighting Fixture Replacement/Upgrade & Indoor Heat Conversion
    CX(s) Applied: A1, B1.23, B2.2, B5.1
    Date: 06/11/2012
    Location(s): Virginia
    Offices(s): National Energy Technology Laboratory

  • June 8, 2012

    Renovations and Maintenance Activities for Buildings, Structures, Infrastructures and Equipment
    CX(s) Applied: B1.3, 61.4, 61.5, B1.11, B1.15, B1.16, B1.17, 81.22, B1.27, 62.1, B2.2, B2.3, 62.5
    Date: 06/08/2012
    Location(s): Illinois
    Offices(s): New Brunswick Laboratory

  • June 7, 2012

    Building Space Modifications and Security Improvements, and Related Activities for the Westminster, Colorado, Office Location
    CX(s) Applied: B1.3, B2.2
    Date: 06/07/2012
    Location(s): Colorado
    Offices(s): Legacy Management

  • May 28, 2012

    Infrastructure for Advanced Reactor Materials Center
    CX(s) Applied: B2.2
    Date: 05/28/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 21, 2012

    Reactor Infrastructure Improvement at Kansas State University Nuclear Reactor – Kansas State University
    CX(s) Applied: B2.2
    Date: 05/21/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 21, 2012

    Upgrading the Walthousen Reactor Critical Facility to Support Research, Teaching, and Education at the Reactor – Rensselaer Polytechnic Institute
    CX(s) Applied: B2.2
    Date: 05/21/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 21, 2012

    Enhancement of Radiation Safety and Radiological Monitoring Systems for the Ohio State University Nuclear Reactor
    CX(s) Applied: B2.2
    Date: 05/21/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 17, 2012

    Acquisition of Specific Equipment to Enhance Performance, Control and Operational Capability of the University of Utah TRIGA Facilities
    CX(s) Applied: B2.2
    Date: 05/17/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 17, 2012

    Nuclear Instrumentation Upgrade for University of Missouri Research Reactor Power Level Monitoring – University of Missouri
    CX(s) Applied: B2.2
    Date: 05/17/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 17, 2012

    Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter – Texas Agricultural & Mechanical University
    CX(s) Applied: B2.2, B3.6
    Date: 05/17/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 17, 2012

    Equipment Upgrade for the University of New Mexico AGN-201M Reactor – University of New Mexico
    CX(s) Applied: B2.2, B3.6
    Date: 05/17/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • April 20, 2012

    Security Upgrades Major Construction Project
    CX(s) Applied: B1.11, B1.15, B1.16, B1.23, B2.2
    Date: 04/20/2012
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • April 20, 2012

    Compressed Air System Replacement
    CX(s) Applied: B1.31, B2.2
    Date: 04/20/2012
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • April 7, 2012

    Idaho National Laboratory (INL) Closed Circuit Television (CCTV) Replacement Project
    CX(s) Applied: B2.2
    Date: 04/07/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • February 24, 2012

    Darlington County Biodiesel Buses
    CX(s) Applied: A1, B1.15, B2.2, B5.22
    Date: 02/24/2012
    Location(s): South Carolina
    Offices(s): National Energy Technology Laboratory