Public Comment Opportunities

Below are links to information about how to comment on DOE NEPA projects with open comment periods, including comment periods on the proposed scope of planned NEPA documents and on draft NEPA documents (e.g., draft environmental assessments and draft environmental impacts statements). The end of each comment period is indicated below.

  • Notice of Intent: Scoping Period Ends 09/01/14
    The Federal Energy Regulatory Commission (FERC) announced its intent to prepare an EIS to analyze the potential environmental impacts of a proposal to expand an existing liquefied natural gas (LNG) import terminal in Jackson County Mississippi and modify related facilities to enable the terminal to liquefy natural gas for export. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest.

  • Draft Supplemental Environmental Impact Statement: Comment Period Ends 09/22/14
    This Supplemental EIS updates the environmental analyses in DOE’s 1999 EIS for the Production of Tritium in a Commercial Light Water Reactor (CLWR EIS). The CLWR EIS addressed the production of tritium in Tennessee Valley Authority reactors in Tennessee using tritium-producing burnable absorber rods.

  • Public Scoping Period Ends 09/02/14
    Bonneville Power Administration is preparing an EA to assess potential environmental impacts of proposed improvements to the access road system for its existing Spar Canyon-Round Valley Transmission Line located on Bureau of Land Management land in Custer County, Idaho.