You are here

Categorical Exclusion Determinations: Pennsylvania

Location

Categorical Exclusion Determinations issued for actions in Pennsylvania.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • September 17, 2013

    Robust and Energy Efficient Dual-Stage Membrane-Based Process for Enhanced Carbon Dioxide (CO2) Recovery
    CX(s) Applied: A1, A9, B3.6
    Date: 09/17/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 16, 2013

    Chemical Looping Gasification for Hydrogen Enhanced Syngas Production with In-Situ Carbon Dioxide (CO2) Capture
    CX(s) Applied: A9
    Date: 09/16/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 16, 2013

    Novel Flow Sheet for Low Energy Carbon Dioxide (CO2) Capture Enabled by Biocatalyst Delivery System
    CX(s) Applied: A9
    Date: 09/16/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 16, 2013

    Building-922 West Office Renovation: 2nd Floor
    CX(s) Applied: B1.15, B2.2, B2.5
    Date: 09/16/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 16, 2013

    Replace Potable Water Supply Lines: Phase Two
    CX(s) Applied: B1.3, B1.16, B1.32, B2.2
    Date: 09/16/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 13, 2013

    Efficiency, Safety, and Degradation Modeling of Automotive Lithium (Li)-ion Cells and Packs
    CX(s) Applied: B3.6
    Date: 09/13/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 13, 2013

    Efficiency, Safety, and Degradation Modeling of Automotive Lithium (Li)-ion Cells and Packs
    CX(s) Applied: B3.6
    Date: 09/13/2013
    Location(s): Pennsylvania, Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 11, 2013

    Rapid, Compact c-Si Module Manufacturing
    CX(s) Applied: A9, B3.6
    Date: 09/11/2013
    Location(s): Pennsylvania
    Offices(s): Golden Field Office

  • September 11, 2013

    Smart Refractory Sensor Systems for Wireless Monitoring of Temperature, Health & Degradation of…
    CX(s) Applied: B3.6
    Date: 09/11/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 10, 2013

    Friction Stir Scribe Joining of Al to AHSS
    CX(s) Applied: A9, B3.6
    Date: 09/10/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 10, 2013

    High Energy, Long Cycle Life Lithium-ion Batteries for PHEV Applications
    CX(s) Applied: B3.6
    Date: 09/10/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 10, 2013

    High Energy, Long Cycle Life Lithium-ion Batteries for PHEV Applications
    CX(s) Applied: B3.6
    Date: 09/10/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 9, 2013

    B-922 Grease Interceptor Replacement
    CX(s) Applied: B1.3, B1.31
    Date: 09/09/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 29, 2013

    A New Generation of Building Insulation by Foaming Polymer Blend Materials with Carbon Dioxide
    CX(s) Applied: A9, B3.6
    Date: 08/29/2013
    Location(s): Pennsylvania
    Offices(s): Golden Field Office

  • August 28, 2013

    Fluorescent Pigments for High Performance Cool Roofing and Facades
    CX(s) Applied: B3.6
    Date: 08/28/2013
    Location(s): Pennsylvania
    Offices(s): Golden Field Office

  • August 27, 2013

    Arc Flash Hazard Mitigations - Pittsburgh
    CX(s) Applied: B1.15, B2.5
    Date: 08/27/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 8, 2013

    Wildlife Management Program Support
    CX(s) Applied: A9, B1.20
    Date: 08/08/2013
    Location(s): West Virginia, Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • July 25, 2013

    Building 58 Third Floor Mezzanine Enclosure
    CX(s) Applied: B2.1, B2.2, B2.3
    Date: 07/25/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • July 17, 2013

    Pittsburgh Site Wide Exterior Door Repair/Replacement Project
    CX(s) Applied: B2.1, B2.5
    Date: 07/17/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 28, 2013

    Pittsburgh Building 65 and Building 74 Loading Dock Railing Project
    CX(s) Applied: B2.1, B2.3
    Date: 06/28/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 28, 2013

    Modification to Demolish Building 900A and Reconstruct Building 900 Project
    CX(s) Applied: B1.3, B1.15
    Date: 06/28/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 26, 2013

    Pittsburgh B901 Mezzanine Project
    CX(s) Applied: B1.15, B1.23, B2.3
    Date: 06/26/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 26, 2013

    Pittsburgh Building 84 Gas Line Project
    CX(s) Applied: B2.5
    Date: 06/26/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 24, 2013

    Rapid Freeform Sheet Metal Forming: Technology Development and System Verification
    CX(s) Applied: A9, B3.6
    Date: 06/24/2013
    Location(s): Michigan, Illinois, Pennsylvania
    Offices(s): Golden Field Office

  • June 17, 2013

    Pittsburgh Building 59 Garage Doors Project
    CX(s) Applied: B1.3, B1.23, B2.1
    Date: 06/17/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory