You are here

Categorical Exclusion Determinations: Pennsylvania

Location

Categorical Exclusion Determinations issued for actions in Pennsylvania.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • September 12, 2012

    Design for High Performance Sustainable Building Modifications Based on E4 Report - PGH
    CX(s) Applied: B1.15, B1.23, B2.2
    Date: 09/12/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 11, 2012

    Oxy-Fired Pressurized Fluidized Bed Combustor Development and Scale-Up for New and Retrofit
    CX(s) Applied: A9, B3.6
    Date: 09/11/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 10, 2012

    Building 94 Facade Restoration
    CX(s) Applied: B1.3
    Date: 09/10/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 7, 2012

    Interagency Study on the Implementation of Integrated Computational Materials Engineering…
    CX(s) Applied: A9, A11
    Date: 09/07/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 7, 2012

    Big 8 - 922, 920, 921 Heating, Ventilation and Air Conditioning Upgrades; 921, 74 Roof Replacement; HPSB Upgrades
    CX(s) Applied: B2.1, B2.2, B2.3
    Date: 09/07/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 6, 2012

    (0675 -1565) Penn State University - A Multi-Purpose, Intelligent, and Reconfigurable Battery Pack Health Management System
    CX(s) Applied: B3.6
    Date: 09/06/2012
    Location(s): Pennsylvania, Michigan, Michigan
    Offices(s): Advanced Research Projects Agency-Energy

  • September 5, 2012

    (0675 - 1572) DNV - Sensor Enhanced and Model Validated Life Extension of Batteries for Energy Storage
    CX(s) Applied: B3.6
    Date: 09/05/2012
    Location(s): Ohio, Ohio, Ohio, Pennsylvania
    Offices(s): Advanced Research Projects Agency-Energy

  • September 5, 2012

    Energy Regional Innovation Cluster
    CX(s) Applied: B3.6
    Date: 09/05/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 31, 2012

    Electric Drive Vehicle Demonstration and Infrastructure Evaluation
    CX(s) Applied: B5.23
    Date: 08/31/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 29, 2012

    Zonal Isolation Improvement for Horizontal Wells Drilling in the Marcellus Shale
    CX(s) Applied: A9, B3.6
    Date: 08/29/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 29, 2012

    Pittsburgh B83 Boiler Room Ventilation/Cooling Project
    CX(s) Applied: B2.1, B2.2, B2.3
    Date: 08/29/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 29, 2012

    Asphalt Sealing of Parking Areas and Roadways at National Energy Technology Laboratory, Pittsburgh
    CX(s) Applied: B1.3
    Date: 08/29/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 27, 2012

    Catalyst-Assisted Manufacture of Olefins from Natural Gas Liquids: Prototype Development
    CX(s) Applied: A9, B3.6
    Date: 08/27/2012
    Location(s): Pennsylvania, Texas, New Jersey
    Offices(s): Golden Field Office

  • August 22, 2012

    Fiscal Year 2012-13 State Energy Program Formula Grant
    CX(s) Applied: A9, A11
    Date: 08/22/2012
    Location(s): Pennsylvania
    Offices(s): Golden Field Office

  • August 13, 2012

    Pilot Testing: Pretreatment Options to Allow Re-Use of Frac Flowback Water
    CX(s) Applied: B3.6
    Date: 08/13/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 8, 2012

    Pittsburgh Guard Shack Replacement
    CX(s) Applied: B1.23, B1.24
    Date: 08/08/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 6, 2012

    Ambler Boiler House Geothermal Wells, Cool Roof and Photovoltaic installation
    CX(s) Applied: B5.1, B5.16, B5.19
    Date: No date.
    Location(s): Pennsylvania
    Offices(s): Golden Field Office

  • August 2, 2012

    Scattering Solar Thermal Concentrators
    CX(s) Applied: B3.6, B5.17
    Date: 08/02/2012
    Location(s): Pennsylvania
    Offices(s): Golden Field Office

  • July 26, 2012

    Energy Regional Innovation Cluster
    CX(s) Applied: B3.6, B5.1
    Date: 07/26/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • July 12, 2012

    Zonal Isolation Improvement for Horizontal Wells Drilling in the Marcellus Shale
    CX(s) Applied: A9, A11, B3.6
    Date: 07/12/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 25, 2012

    Pennsylvania-City-Upper Darby, Township of
    CX(s) Applied: A9, A11, B2.5, B5.1
    Date: 06/25/2012
    Location(s): Pennsylvania
    Offices(s): Energy Efficiency and Renewable Energy

  • June 20, 2012

    Naval Reactors Facility Parking Lot Expansion General Plant Project
    CX(s) Applied: B1.15
    Date: 06/20/2012
    Location(s): Pennsylvania
    Offices(s): Naval Nuclear Propulsion Program, NRF

  • June 19, 2012

    Building 93 Heat Exchanger Removal at National Energy Technology Laboratory Pittsburgh
    CX(s) Applied: B1.23, B1.31
    Date: 06/19/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 13, 2012

    Utility Corridor Extension
    CX(s) Applied: B4.7, B4.11, B5.2, B5.5
    Date: 06/13/2012
    Location(s): Pennsylvania
    Offices(s): Naval Nuclear Propulsion Program, Bettis Site

  • May 25, 2012

    Sorbent, Catalyst, Photochemical - Analytical Methods Development Laboratory
    CX(s) Applied: B3.6
    Date: 05/25/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory