You are here

Categorical Exclusion Determinations: Pennsylvania

Location

Categorical Exclusion Determinations issued for actions in Pennsylvania.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • August 28, 2013

    Fluorescent Pigments for High Performance Cool Roofing and Facades
    CX(s) Applied: B3.6
    Date: 08/28/2013
    Location(s): Pennsylvania
    Offices(s): Golden Field Office

  • August 27, 2013

    Arc Flash Hazard Mitigations - Pittsburgh
    CX(s) Applied: B1.15, B2.5
    Date: 08/27/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 8, 2013

    Wildlife Management Program Support
    CX(s) Applied: A9, B1.20
    Date: 08/08/2013
    Location(s): West Virginia, Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • July 25, 2013

    Building 58 Third Floor Mezzanine Enclosure
    CX(s) Applied: B2.1, B2.2, B2.3
    Date: 07/25/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • July 17, 2013

    Pittsburgh Site Wide Exterior Door Repair/Replacement Project
    CX(s) Applied: B2.1, B2.5
    Date: 07/17/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 28, 2013

    Pittsburgh Building 65 and Building 74 Loading Dock Railing Project
    CX(s) Applied: B2.1, B2.3
    Date: 06/28/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 28, 2013

    Modification to Demolish Building 900A and Reconstruct Building 900 Project
    CX(s) Applied: B1.3, B1.15
    Date: 06/28/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 26, 2013

    Pittsburgh B901 Mezzanine Project
    CX(s) Applied: B1.15, B1.23, B2.3
    Date: 06/26/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 26, 2013

    Pittsburgh Building 84 Gas Line Project
    CX(s) Applied: B2.5
    Date: 06/26/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 24, 2013

    Rapid Freeform Sheet Metal Forming: Technology Development and System Verification
    CX(s) Applied: A9, B3.6
    Date: 06/24/2013
    Location(s): Michigan, Illinois, Pennsylvania
    Offices(s): Golden Field Office

  • June 17, 2013

    Pittsburgh Building 59 Garage Doors Project
    CX(s) Applied: B1.3, B1.23, B2.1
    Date: 06/17/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 17, 2013

    Building 64 and 92 Roof Replacement
    CX(s) Applied: B1.23, B2.1, B2.5
    Date: 06/17/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • May 7, 2013

    Silicon Power Corporation - Optically-Switched 15-kilovolt SiC Single-Bias High-Frequency Thyristor
    CX(s) Applied: B3.6
    Date: 05/07/2013
    Location(s): New York, Pennsylvania, North Carolina, Illinois
    Offices(s): Advanced Research Projects Agency-Energy

  • April 29, 2013

    Pratt and Whitney Rocketdyne - Turbo-POx For Ultra-Low Cost Gasoline and Rocket Engine Derived High Efficiency Turbo Machinery
    CX(s) Applied: B3.6
    Date: 04/29/2013
    Location(s): California, Illinois, Pennsylvania
    Offices(s): Advanced Research Projects Agency-Energy

  • April 26, 2013

    Radiation Heat Transfer and Turbulent Fluctuations in Internal Combustion Engines – Toward Predictive Models
    CX(s) Applied: B3.6
    Date: 04/26/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • April 15, 2013

    Polymer Synthesis Lab - Modification
    CX(s) Applied: B3.6
    Date: 04/15/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • April 10, 2013

    B903 Renovation
    CX(s) Applied: B1.16, B1.29, B2.1, B2.5
    Date: 04/10/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • April 5, 2013

    Fundamental Combustion Lab
    CX(s) Applied: B3.6
    Date: 04/05/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • April 1, 2013

    Harvard University- Novel Slippery Coatings for Extreme Energy-Savings Associated with Fluid Handling in Oil Pipelines and Water Circulation Systems
    CX(s) Applied: B3.6
    Date: 04/01/2013
    Location(s): Massachusetts, Pennsylvania
    Offices(s): Advanced Research Projects Agency-Energy

  • February 28, 2013

    Pittsburgh Green Innovators Synergy Center
    CX(s) Applied: A9
    Date: 02/28/2013
    Location(s): Pennsylvania
    Offices(s): Golden Field Office

  • February 8, 2013

    United Technologies Research Center- Additive Manufacturing of Optimized Ultra-High Efficiency Electric Machines
    CX(s) Applied: B3.6
    Date: 02/08/2013
    Location(s): Connecticut, Pennsylvania, Michigan
    Offices(s): Advanced Research Projects Agency-Energy

  • January 29, 2013

    Pittsburgh Nanomaterials Preparation Lab
    CX(s) Applied: B3.6
    Date: 01/29/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • January 29, 2013

    Pittsburgh Nanomaterials Preparation Lab
    CX(s) Applied: B3.6
    Date: 01/29/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • January 9, 2013

    C-CA-CAM Building Complex Demolition and Site Restoration
    CX(s) Applied: B1.11, B1.16, B1.17, B1.23, B1.24, B1.27, B1.30, B1.33, B1.34
    Date: 01/09/2013
    Location(s): Pennsylvania
    Offices(s): Naval Nuclear Propulsion Program

  • December 14, 2012

    The Agile Electro-Mechanical Product Accelerator
    CX(s) Applied: A9, A11
    Date: 12/14/2012
    Location(s): Pennsylvania
    Offices(s): Golden Field Office