You are here

Categorical Exclusion Determinations: Oregon

Location

Categorical Exclusion Determinations issued for actions in Oregon.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • January 15, 2014

    Lightspeed Network's Fiber Installation near Pilot Butte Substation
    CX(s) Applied: B4.7
    Date: 01/15/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 15, 2014

    The Pacific Marine Energy South Energy Test Site (PMEC-SETS)
    CX(s) Applied: A9
    Date: 01/15/2014
    Location(s): Oregon
    Offices(s): Golden Field Office

  • December 26, 2013

    Equipment and Property Transfers with Three Public Utilities in Oregon, Idaho and Washington
    CX(s) Applied: B1.124
    Date: 12/26/2013
    Location(s): Oregon, Idaho, Washington
    Offices(s): Bonneville Power Administration

  • December 18, 2013

    Using Multiple In Situ Approaches to Assess Fish Communities and their Connectivity in the Vicinity of Natural Rocky Outcrops and an Adjacent Active Wave Energy Conversion Site in the Pacific Northwest
    CX(s) Applied: A9, B3.3
    Date: 12/18/2013
    Location(s): Oregon, Oregon
    Offices(s): Golden Field Office

  • December 17, 2013

    Measuring Changes in Ambient Noise Levels from the Installation and Operation of a Wave Energy Converter in the Coastal Ocean
    CX(s) Applied: B3.3
    Date: 12/17/2013
    Location(s): Oregon
    Offices(s): Golden Field Office

  • December 16, 2013

    Build and Test of a Novel, Commercial-Scale Wave Energy Direct0Drive Rotary Power Take-Off Under Realistic Open-Ocean Conditions
    CX(s) Applied: A9, B5.15
    Date: 12/16/2013
    Location(s): Oregon, Virginia, Colorado
    Offices(s): Golden Field Office

  • December 11, 2013

    Organic Speciation and Interactions in Actinide-Lanthanide Separation (ALSEP) – One Step Partitioning Process of Minor Actinides, Lanthanides, and Fission Products
    CX(s) Applied: B3.6
    Date: 12/11/2013
    Location(s): Oregon
    Offices(s): Idaho Operations Office

  • December 11, 2013

    Xeriscaping at Four Facilities
    CX(s) Applied: B1.3
    Date: 12/11/2013
    Location(s): Oregon, Oregon, Washington, Montana
    Offices(s): Bonneville Power Administration

  • November 29, 2013

    Fence Replacement on the Latham Tap Transmission Line Corridor
    CX(s) Applied: B1.3
    Date: 11/29/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • November 19, 2013

    Analytical Physics - X-Ray Diffraction Operation (Project Extension)
    CX(s) Applied: B3.6
    Date: 11/19/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • November 14, 2013

    Oregon State University - Bio-Lamina-Plates Bioreactor for Enhanced Mass and Heat Transfer
    CX(s) Applied: B3.6
    Date: 11/14/2013
    Location(s): Oregon
    Offices(s): Advanced Research Projects Agency-Energy

  • November 6, 2013

    Upgrade Six Wireless Communication Sites (Clear Creek, Evergreen, Fruit Valley, KSLM, Minnehaha, Popcorn)
    CX(s) Applied: B1.19
    Date: 11/06/2013
    Location(s): Oregon, Washington, Washington
    Offices(s): Bonneville Power Administration

  • November 1, 2013

    "Equipment Additions to the Ostrander and Pearl Substations and Dittmer Control Center

    CX(s) Applied: B1.7
    Date: 11/01/2013
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration"

  • October 29, 2013

    Severe Environment Corrosion Erosion Research Facility (SECERF)
    CX(s) Applied: B3.6
    Date: 10/29/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • October 24, 2013

    Lightspeed Networks Inc. Fiber Installation
    CX(s) Applied: B4.9
    Date: 10/24/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • October 17, 2013

    Transforming Photovoltaic Installations Toward Dispatchable, Schedulable Energy Solutions
    CX(s) Applied: B3.6, B5.15
    Date: 10/17/2013
    Location(s): Oregon
    Offices(s): Golden Field Office

  • October 10, 2013

    Balancing Authority Area Services Agreement with Port Townsend Paper Corporation
    CX(s) Applied: B4.1
    Date: 10/10/2013
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration

  • October 2, 2013

    Security Upgrades at Multiple Substations
    CX(s) Applied: ?
    Date: 10/02/2013
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration

  • October 1, 2013

    Analytical Physics - Wavelength Dispersive X-Ray Fluorescence Spectroscopy
    CX(s) Applied: B3.6
    Date: 10/01/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • September 27, 2013

    Chemawa-Salem #1 & #2 Access Roads
    CX(s) Applied: B1.3
    Date: 09/27/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • September 24, 2013

    Longview and Tillamook Substation Communication Upgrades
    CX(s) Applied: B1.7
    Date: 09/24/2013
    Location(s): Washington, Oregon
    Offices(s): Bonneville Power Administration

  • September 20, 2013

    Timber Tap to Forest Grove-Keeler #1 Access Roads
    CX(s) Applied: B1.3
    Date: 09/20/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • September 19, 2013

    Wave Energy Test - New Zealand Multi-Mode Technology Demonstration at the US Navy's Wave Energy Test Site
    CX(s) Applied: B3.6
    Date: 09/19/2013
    Location(s): Oregon
    Offices(s): Golden Field Office

  • September 18, 2013

    Brasada-Harney Number 1 Access Road Maintenance Project
    CX(s) Applied: B1.3
    Date: 09/18/2013
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • September 17, 2013

    Hydrate Evolution in Response to Ongoing Environmental Shifts
    CX(s) Applied: A9
    Date: 09/17/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory