  • May 21, 2012

    2012 Alvey District Wood Pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 05/21/2012
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • May 21, 2012

    Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way
    CX(s) Applied: B1.3
    Date: 05/21/2012
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • May 21, 2012

    2012 Chemawa District Wood Pole Replacement Projects
    CX(s) Applied: B1.3
    Date: 05/21/2012
    Location(s): Oregon, Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • May 16, 2012

    Bonneville Power Administration (BPA) Acquisition of Oregon Trail Electric Cooperative Disconnect Switch at the BPA LaGrande Substation
    CX(s) Applied: B1.24
    Date: 05/16/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • May 16, 2012

    Revolution Energy Services (RES) Agriculture (Ag) – Forest Glen Oaks LLC Biomass Project
    CX(s) Applied: B4.13
    Date: 05/16/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • May 1, 2012

    Maupin-Tygh Valley Number 1 Pole Replacement Project
    CX(s) Applied: B1.3
    Date: 05/01/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 23, 2012

    Wood Pole Replacement on The Dalles-Discovery Number 1 Transmission Line
    CX(s) Applied: B1.3
    Date: 04/23/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 20, 2012

    Recovery Act: State Geological Survey Contributions to the National Geothermal Data System Oregon
    CX(s) Applied: B3.1, B3.2, B3.6
    Date: 04/20/2012
    Location(s): Oregon
    Offices(s): Golden Field Office

  • April 16, 2012

    Routine Activities at Lakeview, Oregon, Processing and Disposal Sites
    CX(s) Applied: B1.3, B1.11, B3.1
    Date: 04/16/2012
    Location(s): Oregon
    Offices(s): Legacy Management

  • April 13, 2012

    Redmond-Pilot Butte Number 1 Wood Pole Replacement Project
    CX(s) Applied: B4.6
    Date: 04/13/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 11, 2012

    Development of Project on North Unit Irrigation District's Main Canal at Monroe Drop
    CX(s) Applied: A9
    Date: 04/11/2012
    Location(s): Oregon
    Offices(s): Golden Field Office

  • April 6, 2012

    Offsite Oxycombustion Flame Analysis (OOFA)
    CX(s) Applied: B3.6
    Date: 04/06/2012
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • March 28, 2012

    Portland General Electric 13-Kilovolt Overhead Electrical Line Land Use Review Request
    CX(s) Applied: B4.9
    Date: 03/28/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • March 28, 2012

    Sitewide Categorical Exclusion for Research Activities in Aquatic Environments
    CX(s) Applied: B3.16
    Date: 03/28/2012
    Location(s): Oregon, Washington, Idaho
    Offices(s): Pacific Northwest Site Office

  • March 21, 2012

    La Pine-Chiloquin Number 1 Wood Pole Replacement Project
    CX(s) Applied: B4.6
    Date: 03/21/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • March 20, 2012

    Integration of the Echo Point Community Wind Generation Project
    CX(s) Applied: B1.7
    Date: 03/20/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • February 23, 2012

    Pearl-Marion #1 Tower 6/2 Replacement Project
    CX(s) Applied: B4.6
    Date: 02/23/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • February 22, 2012

    Severe Environment Corrosion and Erosion Research Facility
    CX(s) Applied: B3.6
    Date: 02/22/2012
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • February 13, 2012

    Pearl Substation 500-Kilovolt #6 Bay Addition
    CX(s) Applied: B4.6
    Date: 02/13/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • February 8, 2012

    Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility
    CX(s) Applied: B4.6
    Date: 02/08/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • February 7, 2012

    Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility
    CX(s) Applied: B4.6
    Date: 02/07/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • February 6, 2012

    Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation
    CX(s) Applied: B4.9
    Date: 02/06/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • January 11, 2012

    Integration of the Farm Power Misty Meadows Generating Facility
    CX(s) Applied: B1.7
    Date: 01/11/2012
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • December 29, 2011

    Gas Chromatography
    CX(s) Applied: B3.6
    Date: 12/29/2011
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • December 20, 2011

    Optimized Ports Assessment
    CX(s) Applied: A9, A11
    Date: 12/20/2011
    Location(s): Oregon
    Offices(s): Golden Field Office