Categorical Exclusion Determinations: B2.5

Existing Regulations

B2.5: Facility safety and environmental improvements
Safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/upgrade of control valves, in-core monitoring devices, facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards and/or sustain high wind loading; and replacement of aboveground or belowground tanks and related piping, provided that there is no evidence of leakage, based on testing in accordance with applicable requirements (such as 40 CFR part 265, “Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities” and 40 CFR part 280, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks”). These actions do not include rebuilding or modifying substantial portions of a facility (such as replacing a reactor vessel).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 8, 2011

    Nevada-TRIBE-YOMBA SHOSHONE TRIBE
    CX(s) Applied: B2.5, B5.1
    Date: 12/08/2011
    Location(s): Nevada
    Offices(s): Energy Efficiency and Renewable Energy

  • December 8, 2011

    California-City-Mountain View
    CX(s) Applied: A9, B1.32, B2.5, B5.1
    Date: 12/08/2011
    Location(s): California
    Offices(s): Energy Efficiency and Renewable Energy

  • November 30, 2011

    Domestic Water to River Water Cross Connection for the Biomass Cogeneration Facility
    CX(s) Applied: B2.5
    Date: 11/30/2011
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 22, 2011

    Texas-City-Odessa
    CX(s) Applied: B2.5, B5.1
    Date: 11/22/2011
    Location(s): Texas
    Offices(s): Energy Efficiency and Renewable Energy

  • November 22, 2011

    Minnesota-City-Lakeville
    CX(s) Applied: B1.32, B2.5, B5.1
    Date: 11/22/2011
    Location(s): Minnesota
    Offices(s): Energy Efficiency and Renewable Energy

  • November 22, 2011

    Massachusetts-TRIBE-MASHPEE WAMPANOAG TRIBAL COUNCIL INC.
    CX(s) Applied: B2.5, A9, B5.1, B5.16
    Date: 11/22/2011
    Location(s): Massachusetts
    Offices(s): Energy Efficiency and Renewable Energy

  • November 22, 2011

    Idaho-TRIBE-SHOSHONE-BANNOCK TRIBE OF THE FORT HALL RESERVATION OF IDAHO
    CX(s) Applied: B2.5, B5.1
    Date: 11/22/2011
    Location(s): Idaho
    Offices(s): Energy Efficiency and Renewable Energy

  • November 22, 2011

    Arizona-City-Avondale
    CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1
    Date: 11/22/2011
    Location(s): Arizona
    Offices(s): Energy Efficiency and Renewable Energy

  • November 18, 2011

    Addition of Pump, Piping, and Ion Exchange Column in Effluent Treatment Project
    CX(s) Applied: B2.5
    Date: 11/18/2011
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 18, 2011

    Provide Electrical Power for New Tool Storage Building and Portable Crew Shacks
    CX(s) Applied: B2.5
    Date: 11/18/2011
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 16, 2011

    CATEGORICAL EXCLUSION (CX) FOR ENERGY EFFICIENCY RETROFITS (CX-EECBG-004)
    CX(s) Applied: B2.5, B5.1
    Date: 11/16/2011
    Location(s): Nationwide
    Office(s): Energy Efficiency & Renewable Energy (EERE) / Oak Ridge Office (ORO)

  • November 16, 2011

    Energy Efficiency Retrofits
    CX(s) Applied: B2.5, B5.1
    Date: 11/16/2011
    Location(s): Nationwide
    Offices(s): Energy Efficiency and Renewable Energy

  • October 13, 2011

    Florida-City-Delray Beach
    CX(s) Applied: A9, A11, B1.32, B2.5, B5.1
    Date: 10/13/2011
    Location(s): Delray Beach, Florida
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • October 13, 2011

    Design and Install a Modification to the HB-Line Exhaust Fan Dampers
    CX(s) Applied: B2.5
    Date: 10/13/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management

  • October 13, 2011

    Nebraska-County-Sarpy
    CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1
    Date: 10/13/2011
    Location(s): Sarpy County, Nebraska
    Office(s): Energy Efficiency and Renewable Energy, Savannah River Operations Office

  • October 12, 2011

    Tennessee-County-Shelby
    CX(s) Applied: A9, A11, B1.32, B2.5, B5.1
    Date: 10/12/2011
    Location(s): Shelby County, Tennessee
    Office(s): Energy Efficiency and Renewable Energy

  • October 5, 2011

    4160 Volt Upgrade Project
    CX(s) Applied: B1.15, B2.5
    Date: 10/05/2011
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • September 29, 2011

    State Energy Program American Recovery and Reinvestment Act - City of Socorro Public Access Compressed Natural Gas Fueling Station
    CX(s) Applied: B2.5, B5.1
    Date: 09/29/2011
    Location(s): Socorro, New Mexico
    Office(s): Energy Efficiency and Renewable Energy, Sandia Site Office

  • September 29, 2011

    North Dakota-City-Bismarck
    CX(s) Applied: A9, A11, B2.5, B5.1
    Date: 09/29/2011
    Location(s): Bismarck, North Dakota
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • September 28, 2011

    Building 903 Renovation
    CX(s) Applied: B1.16, B1.29, B2.1, B2.2, B2.5
    Date: 09/28/2011
    Location(s): Pittsburgh, Pennsylvania
    Office(s): Fossil Energy, National Energy Technology Laboratory

  • September 28, 2011

    City of Lake Worth-Youth Empowerment Center, "Osborne Center" Lighting Replacement
    CX(s) Applied: B2.5, B5.1
    Date: 09/28/2011
    Location(s): Lake Worth, Florida
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • September 27, 2011

    Florida-City-Gainesville
    CX(s) Applied: A9, B1.32, B2.5, B5.1
    Date: 09/27/2011
    Location(s): Gainesville, Florida
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • September 27, 2011

    Wisconsin-City-Green Bay
    CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1
    Date: 09/27/2011
    Location(s): Green Bay, Wisconsin
    Office(s): Energy Efficiency and Renewable Energy, Savannah River Operations Office

  • September 23, 2011

    Peoria Tribe of Indians of Oklahoma
    CX(s) Applied: A9, A11, B2.5, B5.1
    Date: 09/23/2011
    Location(s): Peoria Tribe, Oklahoma
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • September 23, 2011

    Idaho-Tribal Energy Program-Nez Perce Tribe
    CX(s) Applied: B2.5, B5.1
    Date: 09/23/2011
    Location(s): Nez Perce Tribe, Idaho
    Office(s): Energy Efficiency and Renewable Energy, Savannah River Operations Office