This scope covered the ground preparation, creation, construction, and installation of the sign (See Figure 2 and 3 for approximate location). It a…
Establish a set of streetlights at the intersections of Lincoln Road/INTEC entrance, and at the Lincoln Road/NRF "Y" that will provide sufficient i…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The Bonneville Power Administration (BPA) proposes to enter into a land use agreement (LURR) with Harold Sorensen Trucking (HST) to construct an em…
Maintenance, repairs, renovations, and upkeep will focus on these systems: plumbing, building envelope, electrical, telecommunication, and research…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform safety and environmental improvements of a facility (including but not limit…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform safety and environmental improvements of a facility (including, but n…
Work required to install a 38kW backup generator and 1,000 gallon underground fuel tank along with the necessary electrical wiring and equipment to…
A crack/hole in the 216-C Sump wall at the -40 level will be sealed. There is an ongoing leak from this location at this time.…
Propane supplied from the Flammable Gas Distribution System (FGDS) is no longer required throughout the facility and is only required for operation…