  • April 26, 2013

    Emergency Current Transformer Replacement at Gila Substation
    CX(s) Applied: B4.6
    Date: 04/26/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 24, 2013

    Herbicide Application at Lone Butte Substation During Fiscal Year 2013
    CX(s) Applied: B1.3
    Date: 04/24/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 19, 2013

    Herbicide Application at 36 Substations Located in Arizona and California During Fiscal Year 2013
    CX(s) Applied: B1.3
    Date: 04/19/2013
    Location(s): Arizona, Arizona, Arizona, Arizona, Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 4, 2013

    Casa Grande Substation, CAG 262 Breaker Replacement
    CX(s) Applied: B1.3
    Date: 04/04/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • March 28, 2013

    Nogales Substation Temporary Laydown Yard
    CX(s) Applied: B1.3
    Date: 03/28/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 16, 2013

    Algae Testbed Public-Private Partnership (ATP3) - a RAFT Partnership
    CX(s) Applied: A9, B3.6, B5.15
    Date: 01/16/2014
    Location(s): Arizona
    Offices(s): Golden Field Office

  • January 3, 2013

    Maintenance and Wood Pole Replacement along the Gila Wellton Mohawk 161 Kilovolt Transmission Line
    CX(s) Applied: B1.3
    Date: 01/03/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • December 10, 2012

    Assisting the Tooling and Machining Industry to Become Energy Efficient
    CX(s) Applied: A9
    Date: 12/10/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • December 4, 2012

    In-situ X-ray Nanocharacterization of Defect Kinetics in Chalcogenide Solar Cell
    CX(s) Applied: A9, B3.6
    Date: 12/04/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • November 2, 2012

    Install 200 Kilowatt Solar Photovoltaic System and Routine Maintenance Actions
    CX(s) Applied: B1.3, B1.19, B5.16
    Date: 11/02/2012
    Location(s): Arizona
    Offices(s): Legacy Management

  • September 10, 2012

    Halide and Oxy-Halide Eutectic Systems for High Performance High Temperature Heat Transfer Fluids
    CX(s) Applied: B3.6
    Date: 09/10/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • September 5, 2012

    Energy Efficiency and Conservation Block Grant Program
    CX(s) Applied: B5.23
    Date: 09/05/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • August 1, 2012

    Clean Start - Development of a National Liquid Propane (Autogas) Refueling Network
    CX(s) Applied: B5.22
    Date: 08/01/2012
    Location(s): Arizona, Colorado, Oregon, Texas, Washington
    Offices(s): National Energy Technology Laboratory

  • July 26, 2012

    Recovery Act Arizona Geological Survey Contributions to the National Geothermal Data System
    CX(s) Applied: B3.1, B3.6
    Date: 07/26/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • July 25, 2012

    Advance Manufacture of Second-surface, Silvered Glass Reflectors for High Performance, Low-cost Concentrated Solar Power Collector Systems
    CX(s) Applied: B3.6
    Date: 07/25/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • June 25, 2012

    Program Year 2012 State Energy Program Formula Grant
    CX(s) Applied: A9, A11
    Date: 06/25/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • June 25, 2012

    Arizona Power Partners - Smart Grid Data Access from an Advanced Meter Reading Network
    CX(s) Applied: A9, B5.1
    Date: 06/25/2012
    Location(s): Arizona
    Offices(s): National Energy Technology Laboratory

  • April 17, 2012

    Arizona State University - Cyanobacteria Designed for Solar-Powered Highly Efficient Production of Biofuels - Phase II
    CX(s) Applied: A9, B3.6
    Date: 04/17/2012
    Location(s): Arizona, Arizona, Arizona, Minnesota, North Carolina
    Offices(s): Advanced Research Projects Agency-Energy

  • April 3, 2012

    Arizona TRIBE-SAN CARLOS APACHE TRIBE
    CX(s) Applied: B2.5, B5.1, B5.16
    Date: 04/03/2012
    Location(s): Arizona
    Offices(s): Energy Efficiency and Renewable Energy

  • February 10, 2012

    State Geological Survey Contributions to the National Geothermal Data System - New Data WV
    CX(s) Applied: B3.6
    Date: 02/10/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • February 10, 2012

    AASG State Geological Survey Contributions to the National Geothermal Data System- Oklahoma
    CX(s) Applied: B3.1, B3.6
    Date: 02/10/2012
    Location(s): Oklahoma, Arizona
    Offices(s): Golden Field Office

  • February 10, 2012

    State Geological Survey Contributions to the National Geothermal Data System
    CX(s) Applied: B3.1
    Date: 02/10/2012
    Location(s): Arizona, Indiana
    Offices(s): Golden Field Office

  • February 6, 2012

    Clean Start - Development of a National Liquid Propane Refueling Network
    CX(s) Applied: B5.22
    Date: 02/06/2012
    Location(s): California, Arizona
    Offices(s): National Energy Technology Laboratory

  • January 27, 2012

    Arizona Rooftop Challenge (ARC)
    CX(s) Applied: A9, A11
    Date: 01/27/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • January 18, 2012

    Coolidge Substation Southeast Corner Gate and Fence Relocation Project
    CX(s) Applied: B1.11
    Date: 01/18/2012
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region