You are here

Categorical Exclusion Determinations: Arizona

Location

Categorical Exclusion Determinations issued for actions in Arizona.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • June 21, 2013

    Glen Canyon Switchyard - 230 Kilovolt Wavetrap Removal - TZ9A2 on the Navajo Line
    CX(s) Applied: B4.11
    Date: 06/21/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • June 18, 2013

    Recovery Act: State Geological Survey Contributions to the National Geothermal Data System
    CX(s) Applied: B3.1
    Date: 06/18/2013
    Location(s): Arizona
    Offices(s): Golden Field Office

  • June 6, 2013

    Pest Control within Buildings at 44 Substations in Arizona, California and Nevada
    CX(s) Applied: B1.3
    Date: 06/06/2013
    Location(s): Arizona, California, Nevada
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • June 6, 2013

    Liberty Substation Transformer Replacement Project, Maricopa County, Arizona
    CX(s) Applied: B4.11
    Date: 06/06/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • June 5, 2013

    Parker-Gila 161 Kilovolt Transmission Line Maintenance Project, Structure 92/1 to 94/9
    CX(s) Applied: B1.3
    Date: 06/05/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • May 28, 2013

    Road Maintenance on roads Used to Access Groundwater Monitoring Wells South of the Tuba City, Arizona, Uranium Mill Tailing Remedial Action Title I Site
    CX(s) Applied: B1.3, B3.3, B6.1
    Date: 05/28/2013
    Location(s): Arizona
    Offices(s): Legacy Management

  • May 20, 2013

    Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line Access Road Maintenance between Structure 26/8 and 26/9
    CX(s) Applied: B1.3
    Date: 05/20/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • May 16, 2013

    Davis Dam to Kingman Tap 69 Kilovolt Transmission Line, Overhead Optical Power Ground Wire Installation
    CX(s) Applied: B4.7
    Date: 05/16/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • May 16, 2013

    Applied Materials - Kerf-less Crystaline-Silicon Photovoltaic: Gas to Modules
    CX(s) Applied: B3.6
    Date: 05/16/2013
    Location(s): California, Arizona, California
    Offices(s): Advanced Research Projects Agency-Energy

  • May 9, 2013

    Installation of Cattle Guard at Western Area power Administration's Oracle Electrical Substation
    CX(s) Applied: B1.11
    Date: 05/09/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • May 2, 2013

    Oracle to Tucson 115 Kilovolt Transmission Line, Cross Arm Replacements at Structure 2/5 and 7/3
    CX(s) Applied: B1.3
    Date: 05/02/2013
    Location(s): Arizona, Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 30, 2013

    Road Maintenance and Brushwork along the Saguaro-Tucson 115 Kilovolt Transmission Line
    CX(s) Applied: B1.3
    Date: 04/30/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 26, 2013

    Emergency Current Transformer Replacement at Gila Substation
    CX(s) Applied: B4.6
    Date: 04/26/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 24, 2013

    Herbicide Application at Lone Butte Substation During Fiscal Year 2013
    CX(s) Applied: B1.3
    Date: 04/24/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 19, 2013

    Herbicide Application at 36 Substations Located in Arizona and California During Fiscal Year 2013
    CX(s) Applied: B1.3
    Date: 04/19/2013
    Location(s): Arizona, Arizona, Arizona, Arizona, Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • April 4, 2013

    Casa Grande Substation, CAG 262 Breaker Replacement
    CX(s) Applied: B1.3
    Date: 04/04/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • March 28, 2013

    Nogales Substation Temporary Laydown Yard
    CX(s) Applied: B1.3
    Date: 03/28/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • January 16, 2013

    Algae Testbed Public-Private Partnership (ATP3) - a RAFT Partnership
    CX(s) Applied: A9, B3.6, B5.15
    Date: 01/16/2014
    Location(s): Arizona
    Offices(s): Golden Field Office

  • January 3, 2013

    Maintenance and Wood Pole Replacement along the Gila Wellton Mohawk 161 Kilovolt Transmission Line
    CX(s) Applied: B1.3
    Date: 01/03/2013
    Location(s): Arizona
    Offices(s): Western Area Power Administration-Desert Southwest Region

  • December 10, 2012

    Assisting the Tooling and Machining Industry to Become Energy Efficient
    CX(s) Applied: A9
    Date: 12/10/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • December 4, 2012

    In-situ X-ray Nanocharacterization of Defect Kinetics in Chalcogenide Solar Cell
    CX(s) Applied: A9, B3.6
    Date: 12/04/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • November 2, 2012

    Install 200 Kilowatt Solar Photovoltaic System and Routine Maintenance Actions
    CX(s) Applied: B1.3, B1.19, B5.16
    Date: 11/02/2012
    Location(s): Arizona
    Offices(s): Legacy Management

  • September 10, 2012

    Halide and Oxy-Halide Eutectic Systems for High Performance High Temperature Heat Transfer Fluids
    CX(s) Applied: B3.6
    Date: 09/10/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • September 5, 2012

    Energy Efficiency and Conservation Block Grant Program
    CX(s) Applied: B5.23
    Date: 09/05/2012
    Location(s): Arizona
    Offices(s): Golden Field Office

  • August 1, 2012

    Clean Start - Development of a National Liquid Propane (Autogas) Refueling Network
    CX(s) Applied: B5.22
    Date: 08/01/2012
    Location(s): Arizona, Colorado, Oregon, Texas, Washington
    Offices(s): National Energy Technology Laboratory