You are here

EA-1981: Bonneville-Hood River Transmission Line Rebuild; Multnomah and Hood River Counties, Oregon


Bonneville Power Administration is preparing an EA that assesses the potential environmental impacts of the proposed rebuild of its 23-mile long, 115-kilovolt Bonneville-Hood River transmission line and an associated tap line running to Cascade Locks. The project would include replacing transmission structures and conductor wires, and improving access roads and trails.

The project website is

Public Comment Opportunities

Comments on the draft EA should refer to “Bonneville-Hood River Transmission Line Rebuild Project” and should be submitted by October 31, 2016:

  • At a public comment meeting on Wednesday, October 12, from 4:00 – 7:00 p.m. at Hood River Valley High School Cafeteria, 1220 Indian Creek Road, Hood River, Oregon
  • Online:
  • By fax: 503-230-4019
  • By mail: Bonneville Power Administration, Public Affairs - DKE-7, P.O. Box 14428, Portland, OR 97293-4428
  • By phone: 800-622-4519

Comments will be available in their entirety on the project website.

Documents Available for Download