Bangor Hydro-Electric Company Northeast Reliability Interconnect; Hancock, Penobscot, and Washington Counties, Maine

DOE issued final DOE/EIS–0372, which analyzed the potential environmental impacts of a proposal to amend Presidential Permit PP-89 for the Bangor Hydro-Electric Company Northeast Reliability Interconnect, an electric transmission line that would originate at an existing Orrington Substation, near Orrington, Maine, cross the U.S.-Canada border near Baileyville, Maine, and continue into New Brunswick, Canada. The amendment would change a previously selected route. The Final EIS consists of the Draft EIS (Volumes 1 and 2) and a Comment-Response Addendum.

For more information, see Bangor Hydro-Electric Company Northeast Reliability Interconnect.