Installation of Metering and Circuit Breaker at Powell 69-Kilovolt Substation
CX(s) Applied: B4.11
Date: 01/25/2011
Location(s): Page, Arizona
Office(s): Western Area Power Administration-Colorado River Storage Project Management Center
Categorical Exclusion Determinations issued by Western Area Power Administration-Colorado River Storage Project Management Center.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
January 25, 2011
-
October 26, 2009
Power Rate Formula for the Provo River Project of the Western Area Power Administration
CX(s) Applied: B4.3
Date: 10/26/2009
Location(s): Colorado
Office(s): Western Area Power Administration-Colorado River Storage Project Management Center