Installation of substation equipment…
The proposed project includes replacement of 1.5 miles of transmission and distribution lines, which serves 3,429 meters. Specifically, this upgrad…
The project includes adding an automatic transfer switch that is rated 15kv and 600 amps.…
The PIO13 project involves the undergrounding of approximately 9.5 miles of overhead lines, which will increase reliability by virtually eliminatin…
Trenching for underground power cable. Installation of underground electrical equipment, including pad-mounted transformers and grounding/sectional…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the San Rafael Special Services District for th…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the San Rafael Special Services District for re…
Dig 4' trench in existing power utility right of way and install new conduit, wire and transformers.…
Replacing old existing wooden poles with new wood poles along with new hardened conductors, insulators, and down guys. …