You are here

Categorical Exclusion Determinations: Utah

Location

Categorical Exclusion Determinations issued for actions in Utah.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 2, 2013

    Independent Energy Community Renewable Power System
    CX(s) Applied: B5.15
    Date: 12/02/2013
    Location(s): Utah
    Offices(s): Golden Field Office

  • November 26, 2013

    Optical Fiber Based Laser System for Thermophysical Properties at Very High Temperatures
    CX(s) Applied: B3.6
    Date: 11/26/2013
    Location(s): Utah
    Offices(s): Idaho Operations Office

  • November 4, 2013

    Risk Assessment of Structural Integrity of Transportation Casks
    CX(s) Applied: B3.6
    Date: 11/04/2013
    Location(s): Utah
    Offices(s): Idaho Operations Office

  • October 22, 2013

    Solid Power, LLC--An Ultra High Energy, Safe and Low-Cost All Solid-State Rechargeable Battery for Electric Vehicles
    CX(s) Applied: B3.6
    Date: 10/22/2013
    Location(s): Colorado, Colorado, Michigan, Utah, New Mexico
    Offices(s): Advanced Research Projects Agency-Energy

  • September 10, 2013

    High Hydrogen, Low Methane Syngas from Low Ranked Coals for Coal-to-Liquids Production
    CX(s) Applied: B3.6
    Date: 09/10/2013
    Location(s): Utah
    Offices(s): National Energy Technology Laboratory

  • August 26, 2013

    Novel Electro-Deoxygenation Process for Bio-oil Upgrading
    CX(s) Applied: A9, B5.15
    Date: 08/26/2013
    Location(s): Utah
    Offices(s): Golden Field Office

  • July 22, 2013

    Hyper Scratcher Tool: A Patented Oil, Gas, Disposal, & Injection Well Tool for Enhancing Production
    CX(s) Applied: B5.12
    Date: 07/22/2013
    Location(s): Utah
    Offices(s): National Energy Technology Laboratory

  • May 20, 2013

    Fracture Evolution Following Hydraulic Stimulations within EGS Reservoirs
    CX(s) Applied: A9, B3.1, B3.6
    Date: 05/20/2013
    Location(s): Utah
    Offices(s): Golden Field Office

  • May 17, 2013

    Above-Ground Routine Transmission Line Maintenance
    CX(s) Applied: B1.3
    Date: 05/17/2013
    Location(s): Colorado, Wyoming, Nebraska, Montana, Utah
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • May 17, 2013

    Substation Maintenance and Renovation Activities
    CX(s) Applied: B1.3, B1.7, B1.11, B1.27, B1.31, B1.33, B2.2, B2.3, B2.5, B4.6
    Date: 05/17/2013
    Location(s): Colorado, Wyoming, Nebraska, Montana, Utah
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • May 17, 2013

    Communication System Maintenance
    CX(s) Applied: B1.3
    Date: 05/17/2013
    Location(s): Colorado, Wyoming, Nebraska, Montana, Utah
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • May 8, 2013

    Vernal Substation 138 Kilovolt Breaker Replacement
    CX(s) Applied: B4.6
    Date: 05/08/2013
    Location(s): Utah
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 30, 2013

    Utah Expansion of Alternative Fueling Infrastructure
    CX(s) Applied: B5.22
    Date: 04/30/2013
    Location(s): Utah
    Offices(s): National Energy Technology Laboratory

  • April 16, 2013

    Utah Expansion of Alternative Fueling Infrastructure - Electric Charging Station Upgrade
    CX(s) Applied: B5.23
    Date: 04/16/2013
    Location(s): Utah
    Offices(s): National Energy Technology Laboratory

  • April 1, 2013

    Flaming Gorge Microwave Site Communications Building Access Road Repairs
    CX(s) Applied: B1.3
    Date: 04/01/2013
    Location(s): Utah
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • December 13, 2012

    Novel Photon Management for Thin-Film Photovoltaics
    CX(s) Applied: A9, B3.6
    Date: 12/13/2012
    Location(s): Utah
    Offices(s): Golden Field Office

  • December 12, 2012

    Southwest Regional Partnership on Carbon Sequestration: Phase III Commercial-Scale Geologic Carbon Capture, Utilization and Storage Department
    CX(s) Applied: B3.6
    Date: 12/12/2012
    Location(s): Utah
    Offices(s): National Energy Technology Laboratory

  • November 8, 2012

    Brigham City Hydro Generation Project
    CX(s) Applied: B1.8, B5.2
    Date: 11/08/2012
    Location(s): Utah
    Offices(s): Golden Field Office

  • November 8, 2012

    Plug-In Hybrid Electric Medium Duty Commercial Fleet Demonstration and Evaluation
    CX(s) Applied: B5.1
    Date: 11/08/2012
    Location(s): Utah
    Offices(s): National Energy Technology Laboratory

  • November 2, 2012

    Recovery Act: Clean Cities Transportation Petroleum Reduction Technologies Program
    CX(s) Applied: A1
    Date: 11/02/2012
    Location(s): Utah
    Offices(s): National Energy Technology Laboratory

  • October 31, 2012

    California Avenue Natural Gas Fueling Station
    CX(s) Applied: B5.22
    Date: 10/31/2012
    Location(s): Utah
    Offices(s): National Energy Technology Laboratory

  • October 15, 2012

    Utah Expansion of Alternative Fuel Infrastructure - Lehi Compressed Natural Gas Station
    CX(s) Applied: B5.22
    Date: 10/15/2012
    Location(s): Utah
    Offices(s): National Energy Technology Laboratory

  • September 21, 2012

    Flaming Gorge - Vernal 138 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management
    CX(s) Applied: B1.3
    Date: 09/21/2012
    Location(s): Utah
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • September 11, 2012

    Basin-Scale Produced Water Management Tools and Options
    CX(s) Applied: A9, B3.1
    Date: 09/11/2012
    Location(s): Utah, Utah
    Offices(s): National Energy Technology Laboratory

  • September 11, 2012

    (0675 -1537) Utah State University - Robust Cell-Level Modeling and Control of Large Battery Packs
    CX(s) Applied: B3.6
    Date: 09/11/2012
    Location(s): Utah, Colorado, Colorado, Colorado
    Offices(s): Advanced Research Projects Agency-Energy