You are here

Categorical Exclusion Determinations: Savannah River Operations Office

Categorical Exclusion Determinations issued by Savannah River Operations Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • November 6, 2013

    Subcontractor Repair of Roof Leaks at 731-3N
    CX(s) Applied: B1.3
    Date: 11/06/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 6, 2013

    Bioprocessing for Bioremediation and Energy Production
    CX(s) Applied: B3.6
    Date: 11/06/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 6, 2013

    Subcontractor Repair of Roof Leaks at 731-1N
    CX(s) Applied: B1.3
    Date: 11/06/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 5, 2013

    Remove Failed Waste Transfer Drain Line 1533
    CX(s) Applied: B1.3
    Date: 11/05/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 5, 2013

    Subcontractor Repair of Roof Leaks at 703-47A.
    CX(s) Applied: B1.3
    Date: 11/05/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 5, 2013

    Renovate Radiochemistry Lab B138
    CX(s) Applied: B1.3
    Date: 11/05/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 5, 2013

    Modify Savannah River National Laboratory (SRNL) Building 773-A Laboratory C135/139
    CX(s) Applied: B1.3
    Date: 11/05/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 5, 2013

    Nuclear Non-destructive Assay
    CX(s) Applied: B3.6
    Date: 11/05/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 5, 2013

    Borohydride Research and Development for Hydrogen Storage - Lab 151
    CX(s) Applied: B3.6
    Date: 11/05/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 5, 2013

    Fundamental Corrosion Studies in High-Temperature Molten Salt Systems for N
    CX(s) Applied: B3.6
    Date: 11/05/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 4, 2013

    Dissolution Thorium Metal with Evaluation of Gas Generation and Evaluation for the Neutralization of Sodium Reactor Experiment (SRE) Fuel Simulant
    CX(s) Applied: B3.6
    Date: 11/04/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 31, 2013

    246-2H Conduit Routing
    CX(s) Applied: B1.7
    Date: 10/31/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 30, 2013

    Subcontractor Repair of Roof Leaks at 722-4A
    CX(s) Applied: B1.3
    Date: 10/30/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 30, 2013

    Subcontractor Repair of Roof Leaks at 763-52N
    CX(s) Applied: B1.3
    Date: 10/30/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 30, 2013

    Installation of New A-Area Fire Water Pumphouse
    CX(s) Applied: B1.15
    Date: 10/30/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 29, 2013

    D-Area Ash Basins Closure (488-1D, 488-2D, 488-4D, 489-D)
    CX(s) Applied: B6.1
    Date: 10/29/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 29, 2013

    772-F Fire Suppression Enhancements
    CX(s) Applied: B2.2
    Date: 10/29/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 29, 2013

    Changes to K Area Interim Surveillance Process Material Handling
    CX(s) Applied: B6.8
    Date: 10/29/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 29, 2013

    Renovation of 105-L Women's Restroom
    CX(s) Applied: B1.3
    Date: 10/29/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 29, 2013

    Routine Samples from the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) System
    CX(s) Applied: B3.6
    Date: 10/29/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 22, 2013

    Operation, Maintenance, and End of Life of Leeman Prodigy Inductively Coupled Plasma Emission Spectrometers (ICPES) Unit and Perkin Elmer Optima 3000 ICPES Unit
    CX(s) Applied: B3.6
    Date: 10/22/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 21, 2013

    Subcontractor Repair of Roof Leaks at 217-3H (Metal Roof).
    CX(s) Applied: B1.3
    Date: 10/21/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 17, 2013

    Thermal-Chemical Decomposition of Graphite
    CX(s) Applied: B3.6
    Date: 10/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 17, 2013

    773-A E Wing A-Block Cell Window Replacements
    CX(s) Applied: B2.1
    Date: 10/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 17, 2013

    Caustic Simulant Filterability Testing
    CX(s) Applied: B3.6
    Date: 10/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office