You are here

Categorical Exclusion Determinations: Illinois

Location

Categorical Exclusion Determinations issued for actions in Illinois.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • April 6, 2016

    Development of a Planar Focusing Collector for CSP
    Award Number: DE-EE0007339
    CX(s) Applied: A9, B3.6
    Solar Energy Technology Office
    Date: 04/06/2016
    Location(s): IL
    Office(s): Golden Field Office

  • February 23, 2016

    Workforce Development for Hydropower
    Award Number: DE-EE0006507
    CX(s) Applied: A9
    Water Power Program
    Date: 02/27/2014
    Location(s): IL
    Office(s): Golden Field Office

  • January 8, 2016

    State of Illinois SEP: Illinois Institute of Technology: Technology and Demonstration Grant No. 13-432008: Smart Energy Storage System in Hybrid AC/DC Microgrid
    Award Number: DE-EE0006225
    CX(s) Applied: A9, B5.15
    Weatherization & Intergovernmental Programs
    Date: 01/08/2016
    Location(s): IL
    Office(s): Golden Field Office

  • December 22, 2015

    Training Real Estate Professionals to Find the Value of Solar
    Award Number: DE-EE0007322
    CX(s) Applied: A9, A11
    Solar Energy Technology Office
    Date: 12/22/15
    Location(s): IL
    Office(s): Golden Field Office

  • December 22, 2015

    Microgrid-Integrated Solar-Storage Technology
    Award Number: DE-EE0007166
    CX(s) Applied: A9, B3.6
    Solar Energy Technologies Office
    Date: 12/22/15
    Location(s): IL
    Office(s): Golden Field Office

  • November 13, 2015

    Corrosion-resistant non-carbon electrocatalyst supports for PEFCs
    Award Number: DE- EE-0007272
    CX(s) Applied: A9, B3.6

  • September 2, 2015

    Generalizable Mechanistic Understanding of Module-level Light-, Heat- and Humidity-Induced Instabilities in CIGS Photovoltaics
    Award Number: DE-EE0007141
    CX(s) Applied: A9, B3.6, B5.16
    Solar Energy Technologies Office
    Date: 09/02/2015
    Location(s): IL
    Office(s): Golden Field Office

  • August 24, 2015

    Cyber Resilient Energy Delivery Consortium (CREDC)
    CX(s) Applied: A1, A9, A11, B1.3, B1.7, B3.6
    Date: 08/24/2015
    Location(s): Illinois
    Offices(s): National Energy Technology Laboratory

  • August 10, 2015

    Novel Biphasic Carbon Dioxide Absorption Process w/ Multiple Stages of Phase Separation...
    CX(s) Applied: A9, B3.6
    Date: 08/10/2015
    Location(s): Illinois
    Offices(s): National Energy Technology Laboratory

  • August 3, 2015

    Brine Extraction and Treatment Strategies to Enhance Pressure Management and Control of Carbon Dioxide Plumes in Deep Geologic Formations
    CX(s) Applied: A9
    Date: 08/03/2015
    Location(s): Illinois
    Offices(s): National Energy Technology Laboratory

  • July 24, 2015

    Meson Hill Well Abandonment CX
    CX(s) Applied: B3.1
    Date: 07/24/2015
    Location(s): Illinois
    Offices(s): Fermi Site Office

  • July 17, 2015

    Advanced Photon Source Upgrade Project - Multi-Bend Achromat Storage Rings and Superconducting Insertion Devices
    CX(s) Applied: B1.23, B1.31
    Date: 07/17/2015
    Location(s): Illinois
    Offices(s): Argonne Site Office

  • July 15, 2015

    Building 200 Steam and Condensate Repairs, ASO-CX-318
    CX(s) Applied: B1.3
    Date: 07/15/2015
    Location(s): Illinois
    Offices(s): Argonne Site Office

  • July 15, 2015

    Argonne's Washington, DC Office Renovation, ASO-CX-319
    CX(s) Applied: B1.15
    Date: 07/15/2015
    Location(s): Illinois
    Offices(s): Argonne Site Office

  • July 15, 2015

    Argonne Enterprise Data Center, ASO-CX-317
    CX(s) Applied: B1.15
    Date: 07/15/2015
    Location(s): Illinois
    Offices(s): Argonne Site Office

  • July 15, 2015

    Wind Forecast Improvement Project 2 (WFIP2), Yakima (Monitoring Trailer), ASO-CX-314
    CX(s) Applied: B3.1
    Date: 07/15/2015
    Location(s): Illinois
    Offices(s): Argonne Site Office

  • July 15, 2015

    Wind Forecast Improvement Project 2 (WFIP2), Walla Walla (Monitoring Trailer), ASO-CX-315
    CX(s) Applied: B3.1
    Date: 07/15/2015
    Location(s): Illinois
    Offices(s): Argonne Site Office

  • July 15, 2015

    Wind Forecast Improvement Project 2 (WFIP2), Goldendale (Monitoring Trailer), ASO-CX-316
    CX(s) Applied: B3.1
    Date: 07/15/2015
    Location(s): Illinois
    Offices(s): Argonne Site Office

  • July 9, 2015

    Flue Gas Water Vapor Latent Heat Recovery for Pressurized Oxy-Combustion
    CX(s) Applied: A1, A9, B3.6
    Date: 07/09/2015
    Location(s): Illinois
    Offices(s): National Energy Technology Laboratory

  • June 26, 2015

    Energy Savings with Acceptable Indoor Air Quality Through Improved Air Flow Control
    Award Number: DE-EE0007057
    CX(s) Applied: A9, B3.1
    Building Technologies Office
    Date: 06/26/2015
    Location(s): IL
    Office(s): Golden Field Office

  • June 11, 2015

    Production, Quality Control and Shipment of Radionuclides from the University of Washington
    CX(s) Applied: B3.6
    Date: 06/11/2015
    Location(s): Illinois
    Offices(s): Chicago Office

  • May 27, 2015

    Demolition of F0 Trailers
    CX(s) Applied: B1.16, B1.23
    Date: 05/27/2015
    Location(s): Illinois
    Offices(s): Fermi Site Office

  • April 23, 2015

    Main Ring Service Buildings E2 and E3 Demolition
    CX(s) Applied: B1.16, B1.17, B1.23
    Date: 04/23/2015
    Location(s): Illinois
    Offices(s): Fermi Site Office

  • April 23, 2015

    Site-Wide Categorical Exclusion: Routine Maintenance
    CX(s) Applied: B3.1
    Date: 04/23/2015
    Location(s): Illinois
    Offices(s): Fermi Site Office

  • April 20, 2015

    Compressor-less Hydrogen Refueling Station
    Award Number: DE-EE0006966
    CX(s) Applied: B3.6
    Fuel Cell Technologies Office
    Date: 04/20/15
    Location(s): IL
    Office(s): Golden Field Office