Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired. There was no alternative available, because several sit…
Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired.
This review is supplemental documentation to the existing and approved PIP II Environmental Assessment (EA) ID No. DOE/EA-2072 and Finding of No Significant Impact (FONSI).
DOE and the DOE DOGE Team identified a land asset located in Illinois which DOE had acquired to support an energy-related project which has since b…
The Rinaker-Palmyra Tie Line Project includes right-of-way vegetation clearing along new and existing easements, as well as construction and instal…
This project will include vegetation management in the right of ways (ROW) identified in the map provided and in 69.77 miles of ROW. The work will …
The proposed activities for this Environmental Questionnaire includes the installation of SF6 circuit breakers, three-phase reclosers, compact modu…
The purpose of the demolition of Site 50, 52, and 55 houses at Fermi National Accelerator Laboratory (Fermilab) in Batavia, IL, is to reduce excess…
The U.S. Department of Energy (DOE) is proposing to provide funding to BIG, NFP/Blacks in Green (BIG) to design and install a geothermal heating an…
The purpose of the Fermi National Accelerator Laboratory (Fermilab) Ecological Land management (ELM) Plan is to enhance the environment and communi…