You are here

Categorical Exclusion Determinations: Idaho Operations Office

Categorical Exclusion Determinations issued by Idaho Operations Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 17, 2012

    National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study
    CX(s) Applied: B3.1
    Date: 12/17/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • December 15, 2012

    INTEC – U-233 Waste Stream Disposition
    CX(s) Applied: NO CX GIVEN
    Date: 12/15/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • December 5, 2012

    Advanced Test Reactor (ATR) Transition to Commercial Power
    CX(s) Applied: B2.5
    Date: 12/05/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • November 29, 2012

    Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670
    CX(s) Applied: B2.5
    Date: 11/29/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • November 23, 2012

    INTEC – Suspect RH-TRU (AMWTP)
    CX(s) Applied: NO CX GIVEN
    Date: 11/23/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • November 6, 2012

    CPP-684 – Remote Analytical Laboratory Facility Modifications
    CX(s) Applied: B1.28
    Date: 11/06/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • November 6, 2012

    ICP Routine Maintenance
    CX(s) Applied: B1.3
    Date: 11/06/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • July 11, 2012

    High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility
    CX(s) Applied: B1.19
    Date: 07/11/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • July 9, 2012

    Zero Power Physics Reactor Surveillance Glove Box
    CX(s) Applied: B2.5
    Date: 07/09/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • July 5, 2012

    Idaho National Laboratory Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade
    CX(s) Applied: B1.4
    Date: 07/05/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • July 5, 2012

    Rexburg Bus Lot Lease Termination
    CX(s) Applied: B1.24
    Date: 07/05/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • June 27, 2012

    Materials and Fuel Complex – Sodium Processing Facility Tank System Resource Conservation and Recovery Act Closure
    CX(s) Applied: B6.1
    Date: 06/27/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • June 25, 2012

    Reverse Osmosis System Removal
    CX(s) Applied: B1.26
    Date: 06/25/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • June 7, 2012

    M-10 Emergency Pump Backup Power
    CX(s) Applied: B2.5
    Date: 06/07/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • June 7, 2012

    Materials and Fuels Complex Underground and Aboveground Storage Tank Replacement
    CX(s) Applied: B2.5
    Date: 06/07/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 28, 2012

    Infrastructure for Advanced Reactor Materials Center
    CX(s) Applied: B2.2
    Date: 05/28/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 24, 2012

    Infrastructure Upgrade of Radiation Measurement and Spectroscopy Laboratory at Missouri University of Science and Technology
    CX(s) Applied: B1.2
    Date: 05/24/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 23, 2012

    Upgrading Lanthanide & Actinide Spectroscopy Capabilities at Washington State University
    CX(s) Applied: B3.6
    Date: 05/23/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 22, 2012

    Implementation of a Low-Level Gamma-Ray Counting Facility – University of Texas at Austin
    CX(s) Applied: B3.6
    Date: 05/22/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 22, 2012

    Determination of Microstructure and Chemical State Changes in Ion-Irradiated Fuels and Structural Components with a High Kinetic Energy Electron Detector – Illinois Institute of Technology
    CX(s) Applied: B3.6
    Date: 05/22/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 22, 2012

    Building Calorimetric and Thermogravimetric Analytical Instrumentation Capability at Oregon State University
    CX(s) Applied: B3.6
    Date: 05/22/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 22, 2012

    Nuclear Engineering and Science Equipment to Enhance Education and Research in Nuclear and Radiological Engineering at the Georgia Institute of Technology
    CX(s) Applied: B3.6
    Date: 05/22/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 21, 2012

    Idaho National Laboratory (INL) Administration Building (IAB) Communication Room Heating, Ventilation, and Air Conditioning (HVAC) Upgrade
    CX(s) Applied: B1.31
    Date: 05/21/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 21, 2012

    Department of Energy-Idaho/Radiological and Environmental Sciences Laboratory Wavelength-Dispersive X-Ray Spectrometer for Chemistry Research & Development
    CX(s) Applied: B3.6
    Date: 05/21/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • May 21, 2012

    Automated Serial Sectioning and Imaging in Support of Nuclear Materials Analysis – Colorado School of Mines
    CX(s) Applied: B3.6
    Date: 05/21/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office