You are here

Categorical Exclusion Determinations: Colorado

Location

Categorical Exclusion Determinations issued for actions in Colorado.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • April 26, 2013

    Animas River Substation Site Drainage Remediation
    CX(s) Applied: B4.6
    Date: 04/26/2013
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 26, 2013

    Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and Curecanti-Lost Canyon 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads
    CX(s) Applied: B1.3
    Date: 04/26/2013
    Location(s): Colorado, Colorado, Colorado, Colorado, Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 25, 2013

    Curecanti-Poncha 230 Kilovolt Transmission Line Cross Bar Ranch Project
    CX(s) Applied: B1.3
    Date: 04/25/2013
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 25, 2013

    Danger Tree Management on Curecanti-Crystal, 115 Kilovolt Transmission Line Danger Tree and Vegetation Management
    CX(s) Applied: B1.3
    Date: 04/25/2013
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 18, 2013

    Yale University- Power Generation from Waste Heat with Closed Loop Membrane-Based System
    CX(s) Applied: B3.6
    Date: 04/18/2013
    Location(s): Connecticut, Colorado
    Offices(s): Advanced Research Projects Agency-Energy

  • April 12, 2013

    Curecanti-Morrow Point 230 Kilovolt (kV) and 12.47-kV Transmission Lines Access Road Maintenance
    CX(s) Applied: B1.3
    Date: 04/12/2013
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • April 4, 2013

    Advanced Hydrogen Transport Membranes for Coal Gasification
    CX(s) Applied: B3.6
    Date: 04/04/2013
    Location(s): Colorado
    Offices(s): National Energy Technology Laboratory

  • April 1, 2013

    General Electric Company - Tensioned Wind Fabric Blades
    CX(s) Applied: B3.6, B5.15
    Date: 04/01/2013
    Location(s): New York, South Carolina, Virginia, Colorado
    Offices(s): Advanced Research Projects Agency-Energy

  • March 26, 2013

    Urban Transmission Line Danger Tree Management
    CX(s) Applied: B1.3
    Date: 03/26/2013
    Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • March 21, 2013

    South Table Mountain Denver West Parkway Improvements
    CX(s) Applied: A9, B1.33
    Date: 03/21/2013
    Location(s): Colorado
    Offices(s): Golden Field Office

  • March 12, 2013

    University of California Santa Cruz- Adiabatic Waveguide Coupler for High-Power Solar Energy Collection, Photovoltaic Conversion and Transmission
    CX(s) Applied: B3.6
    Date: 03/12/2013
    Location(s): California, California, California, California, Colorado
    Offices(s): Advanced Research Projects Agency-Energy

  • March 11, 2013

    Georgia Institute of Technology- Electric Power Generation by a Vertical-Axis Turbine Driven by an Anchored Vortex and Sustained by the Air Layer over Solar-Heated Ground
    CX(s) Applied: B3.6, B5.15
    Date: 03/11/2013
    Location(s): Georgia, Texas, Illinois, Connecticut, Colorado
    Offices(s): Advanced Research Projects Agency-Energy

  • February 25, 2013

    South Table Mountain 15 Megawatt Electrical Upgrade
    CX(s) Applied: B4.13
    Date: 02/25/2013
    Location(s): Colorado
    Offices(s): Golden Field Office

  • February 20, 2013

    Clean Energy Supply Chain and Manufacturing Competitiveness Analysis for Hydrogen and Fuel Cell Technologies
    CX(s) Applied: A9
    Date: 02/20/2014
    Location(s): Colorado
    Offices(s): Golden Field Office

  • January 24, 2013

    Division Administrator II - Research Applications Laboratory
    CX(s) Applied: A9, B3.1
    Date: 01/24/2013
    Location(s): Colorado
    Offices(s): Golden Field Office

  • January 23, 2013

    Kersey West Switching Station Interconnection Kiowa Creek - Welc 115 Kilovolt Transmission Line
    CX(s) Applied: B4.1, B4.11
    Date: 01/23/2013
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 18, 2013

    Development of Geographical Information System-Based Tool for Optimized Fluid Management in Shale Gas Operations
    CX(s) Applied: A9, A11, B3.6
    Date: 01/18/2013
    Location(s): Colorado
    Offices(s): National Energy Technology Laboratory

  • January 17, 2013

    Achieving Tier 4 Emissions and Efficiency in Biomass Cookstoves
    CX(s) Applied: A9, B3.6, B5.15
    Date: 01/17/2013
    Location(s): Colorado
    Offices(s): Golden Field Office

  • January 16, 2013

    Western's Power Marketing Operations Center New Fiber Optic Cable Installation
    CX(s) Applied: B1.31, B2.2, B4.7
    Date: 01/16/2013
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 15, 2013

    Urban Transmission Line Danger Tree Management
    CX(s) Applied: B1.3
    Date: 01/15/2013
    Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • January 7, 2013

    Technology Research, Development and Tools for Clean Biomass Cookstoves
    CX(s) Applied: A9, B3.6, B5.15
    Date: 01/07/2013
    Location(s): New York, California, Colorado
    Offices(s): Golden Field Office

  • December 26, 2012

    Certifying the Performance of Small Wind Turbines
    CX(s) Applied: A9, A11
    Date: 12/26/2012
    Location(s): Colorado
    Offices(s): Golden Field Office

  • December 19, 2012

    Demonstrate Use of Various Distributed Energy Resources to Reduce Peak Load on Selected Feeders
    CX(s) Applied: A1, B1.3, B1.7, B1.31, B2.2, B4.4, B4.13, B5.1, B4.8
    Date: 12/19/2012
    Location(s): Colorado
    Offices(s): National Energy Technology Laboratory

  • December 13, 2012

    Ault Substation Drainage Swale Construction
    CX(s) Applied: B4.6
    Date: 12/13/2012
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • December 11, 2012

    Holyoke Substation Transformer Replacement
    CX(s) Applied: B4.6
    Date: 12/11/2012
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region