WAPA proposes to replace insulators along a portion of the HUR-TRY transmission line. To aid in this process, two helicopter landing zones were sel…
WAPA proposes to replace dampers associated with tower 116/2 on the Cottonwood-Roseville transmission line and transport linemen to tower 116/1 for…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the University of California Riverside (UCR) for the design, develop…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Barona Group of Capitan Grande Band of Mission Indians (Barona Band) to …
IID will advance and deploy an Advanced Distribution Management System (ADMS) system, which will integrate multiple elements of IID's existing oper…
The proposed Project aims to enhance the resilience and efficiency of Anaheim's electrical grid through strategic modernization efforts, including …
This environmental questionnaire includes the replacement of analog utility service meters with advanced meter infrastructure.…
This environmental questionnaire includes the replacement of analog utility service meters with advanced meter infrastructure.…
This project is research, development, and demonstration (RD and D), R and D in Phase 1 (2 years) and Demonstration in Phase 2 (1 year). …