Coulee-Westside Transfer Trip Replacement
CX(s) Applied: B1.7
Date: 02/06/2013
Location(s): Washington, Washington
Offices(s): Bonneville Power Administration
Categorical Exclusion Determinations issued by Bonneville Power Administration.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
February 6, 2013
-
January 29, 2013
Eugene Substation Protective Relay Installation
CX(s) Applied: B1.7
Date: 01/29/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration -
January 23, 2013
Provision of Funds to Acquire a Conservation Easement Over the 310-acre Coyote Creek property.
CX(s) Applied: B1.25
Date: 01/23/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration -
January 8, 2013
Rogue-Gold Beach No. 2 Disconnect Switch Replacement
CX(s) Applied: B4.6
Date: 01/08/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration -
January 7, 2013
Beck Road Substation Meter Installation
CX(s) Applied: B1.7
Date: 01/07/2013
Location(s): Idaho
Offices(s): Bonneville Power Administration -
January 7, 2013
Roosevelt Radio Station Emergency Generator Removal and Replacement
CX(s) Applied: B1.3
Date: 01/07/2013
Location(s): Washington
Offices(s): Bonneville Power Administration -
December 31, 2012
Bertelsen Substation Metering Panel Segment Addition
CX(s) Applied: B1.7
Date: 12/31/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
December 31, 2012
Tualatin Valley Water District Waterline Land Use Review Request
CX(s) Applied: B4.9
Date: 12/31/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
December 27, 2012
Continuation of Yakama Nation Sturgeon Management Project
CX(s) Applied: B1.20
Date: 12/27/2012
Location(s): Washington, Washington
Offices(s): Bonneville Power Administration -
December 27, 2012
Sale of Lakeside Radio Station
CX(s) Applied: B1.24
Date: 12/27/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
December 27, 2012
Williams Northwest Pipeline Land Use Review Request
CX(s) Applied: B4.9
Date: 12/27/2012
Location(s): Washington
Offices(s): Bonneville Power Administration -
December 27, 2012
Finely Creek and North Valley Creek Property Funding
CX(s) Applied: B1.25
Date: 12/27/2012
Location(s): Montana, Montana
Offices(s): Bonneville Power Administration -
December 21, 2012
Columbia Rural Electric Association Walla Walla Hydroelectric Project
CX(s) Applied: B4.1
Date: 12/21/2012
Location(s): Washington
Offices(s): Bonneville Power Administration -
December 19, 2012
Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line
CX(s) Applied: B1.3, B1.13
Date: 12/19/2012
Location(s): Washington, Idaho
Offices(s): Bonneville Power Administration -
December 17, 2012
Pasco Land Acquisition
CX(s) Applied: B1.24
Date: 12/17/2012
Location(s): Washington
Offices(s): Bonneville Power Administration -
December 6, 2012
Lane Substation 500/230-kV Transformer Phase Separation Project
CX(s) Applied: B4.6
Date: 12/06/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
December 4, 2012
Alcoa Power Sales Contract
CX(s) Applied: B4.1
Date: 12/04/2012
Location(s): Oregon, Washington
Offices(s): Bonneville Power Administration -
December 4, 2012
Keeler Substation-Control House Expansion
CX(s) Applied: B4.11
Date: 12/04/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
December 3, 2012
FY13 Environmental Drainage Upgrades at Bonneville Power Administration’s Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations
CX(s) Applied: B4.6
Date: 12/03/2012
Location(s): Oregon, Montana, Washington, Oregon, Oregon
Offices(s): Bonneville Power Administration -
November 29, 2012
Spring Creek – Wine County No. 1 Transmission Tower Relocation
CX(s) Applied: B4.6
Date: 11/29/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
November 29, 2012
Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way
CX(s) Applied: B1.3
Date: 11/29/2012
Location(s): Idaho, Idaho
Offices(s): Bonneville Power Administration -
November 8, 2012
Snohomish Substation Control House Expansion & Seismic Retrofit
CX(s) Applied: B4.11
Date: 11/08/2012
Location(s): Washington
Offices(s): Bonneville Power Administration -
November 8, 2012
Tualatin River Pipeline Crossing Site- Monitoring Well Redevelopment
CX(s) Applied: B4.9
Date: 11/08/2012
Location(s): Oregon, Oregon
Offices(s): Bonneville Power Administration -
November 8, 2012
Tide Creek Property Funding
CX(s) Applied: B1.25
Date: 11/08/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration -
November 1, 2012
Tucannon River Substation Expansion Project
CX(s) Applied: B4.6
Date: 11/01/2012
Location(s): Washington
Offices(s): Bonneville Power Administration