Proposed project activities will making several critical utility pole replacements/removals and transmission rebuild infrastructure upgrades in are…
The project will involve replacing existing expulsion fuses and arresters with non-expulsion types on power lines to reduce wildfire risk, conducti…
The Bonneville Power Administration (BPA) proposes to decommission and remove the Hungry Horse radio station and Teakettle Repeater and install two…
The projects will require clearing and grubbing of forested areas totaling approximately 1-2 acres followed by grading to construct a 1 MW Battery …
Proposed project activities will include 30 pole relocations and replacements (transmission with distribution under-build) serving rural and tribal…
REPLACE 3836 RF METERS WITH AMI METERS. Install one 100' tower and base station.…
REPLACE 2909 RF METERS WITH AMI METERS. Install seven 100' towers and base stations.…
East River Electric Power Cooperative (ERC) is upgrading the Arlington Tap facility on the WAPA Watertown - Brookings 115 kV transmission line. WAP…
WAPA would acquire additional land around Wessington Springs Substation to mitigate erosion from the substation and minimize damages from neighbori…
The proposed actions consists of adding a grounding transformer to the Woonsocket Substation. Staff would also move the fence between the gates out…