Bonneville Power Administration (BPA) proposes to install human fall protection equipment on the Ashe-Marion No. 2 transmission line. About 125 str…
The proposed action involves the construction of an engineered eco-block retaining wall system, backfilling of the void space with clean fill dirt …
Bonneville Power Administration (BPA) proposes to upgrade, replace, and install new electrical station service and fiber optic cable networks acros…
Bonneville Power Administration (BPA) proposes to replace a 345/230-kilovolt (kV) transformer and install new oil containment liners around three 3…
The Bonneville Power Administration (BPA) proposes to replace conductor insulators on the Big Eddy-Spring Creek No. 1 230 kV transmission line. BPA…
Construct up to 3 nested microgrids, with up to 1.4 MW / 2.54 MWh of energy storage, up to 0.75 linear miles of 12kV conduit and wire, up to 4 line…
The project includes the rebuild and reconductoring of approximately 8.21 circuit miles of 138 kV overhead transmission line, upgrading substation …
Installation of AMI system across REC's service territory, covering SOPO Subtasks 3.2 (Outline System Integration Plan), 4.2 (Procure AMI/RF Mesh a…
Bonneville Power Administration (BPA) proposes to remove and replace structure 1/1 which is a three-pole wood structure on the Anderson Ranch-Mount…
Deploy artificial intelligence (AI)-driven technologies to enhance grid resilience through predictive vegetation and wildfire risk detection, along…