You are here

Categorical Exclusion Determinations: B4.3

Existing Regulations

B4.3: Electric power marketing rate changes
Rate changes for electric power, power transmission, and other products or services provided by a Power Marketing Administration that are based on a change in revenue requirements if the operations of generation projects would remain within normal operating limits.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • July 30, 2012

    Hydroelectric Power Rate Increase for the Robert Douglas Willis Hydropower Project
    CX(s) Applied: B4.3
    Date: 07/30/2012
    Location(s): Texas, Texas, Texas
    Offices(s): Southwestern Power Administration

  • October 20, 2011

    Hydroelectric Power Rate Increase for the Integrated System of Hydropower Projects
    CX(s) Applied: B4.3
    Date: 10/20/2011
    Location(s): CX: none
    Offices(s): Southwestern Power Administration

  • December 15, 2010

    Renewal of Rates and Services for the Central Valley Project, the California-Oregon Transmission Project, the Pacific Alternating Current Intertie, and Path 15 Transmission - Rate Order Number Western Area Power Administration-156
    CX(s) Applied: B4.3
    Date: 12/15/2010
    Location(s): California
    Office(s): Western Area Power Administration-Sierra Nevada Region

  • October 26, 2009

    Power Rate Formula for the Provo River Project of the Western Area Power Administration
    CX(s) Applied: B4.3
    Date: 10/26/2009
    Location(s): Colorado
    Office(s): Western Area Power Administration-Colorado River Storage Project Management Center

  • August 3, 2009

    Proposed rate adjustment for the Jim Woodruff System
    CX(s) Applied: B4.3
    Date: 08/03/2009
    Location(s): Panhandle, Florida
    Office(s): Southeastern Power Administration