The Recipient will research, design, build, test, and demonstrate a flexible and innovative solid-state transformer design, designated as the Solid…
Y-W Electric plans to implement a comprehensive grid monitoring system by installing voltage and current sensors on 70 capacitor banks across their…
Install SCADA and OMS at New Albany office and automation systems at the Blue Springs substation, Hickory Flat substation, NE New Albany substation…
Southern Iowa Electric Coop will install line monitors and line fault indicators on substation feeders and critical locations to assist in monitori…
Franklin Rural Electric plans to replace an existing oil filled distribution hydraulic recloser with an S and C TripSaver II electronic recloser, a…
Burke-Divide Electric Coop. intends to install two (2) high-voltage circuit breakers and associated equipment on a 60 kV transmission system emanat…
SEAPA plans to construct a new, supplementary 115kV substation with a 25MVA transformer in a previously disturbed electric utility easement in Ketc…
Replace Emerson variable frequency drive for being obsolete and limited spare parts.…
Replace six full duplex switchboard sections at SWPA's New Madrid Substation with 14 half duplex switchboard sections.…
The Bonneville Power Administration (BPA) proposes to install a revenue meter and associated equipment at the newly constructed Deschutes Public Li…