You are here

Categorical Exclusion Determinations: B1.7

Existing Regulations

B1.7: Electronic equipment
Acquisition, installation, operation, modification, and removal of electricity transmission control and monitoring devices for grid demand and response, communication systems, data processing equipment, and similar electronic equipment.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 31, 2015

    MSA Annual Categorical Exclusion for Electronic Equipment
    CX(s) Applied: B1.7
    Date: 12/31/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • October 28, 2015

    AT&T to Install Fiber Optic Cable Along South Carolina Highway 125 and SRS Road 1
    CX(s) Applied: B1.7
    Date: 10/28/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 1, 2015

    Deploy Wireless Guest Networks at Strategic Petroleum Reserve Sites
    CX(s) Applied: B1.7
    Date: 10/01/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 28, 2015

    Umatilla Electric Cooperative Solar Interconnection
    CX(s) Applied: B1.7
    Date: 09/28/2015
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • September 28, 2015

    Design/Build Kroll Room Upgrade Project
    CX(s) Applied: B1.7, B1.31
    Date: 09/28/2015
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • September 25, 2015

    ADAS Life Cycle Management Services, 2015-2020
    CX(s) Applied: B1.7
    Date: 09/25/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 12, 2015

    Bayou Choctaw Wi-Fi/Radio Replacement Pilot
    CX(s) Applied: B1.7
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 22, 2015

    Chehalis-Mayfield No. 1 Line Local Area Protection Scheme Project
    CX(s) Applied: B1.7, B2.2
    Date: 07/22/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 11, 2015

    Albany Natural Gas and Water Metering
    CX(s) Applied: B1.7, B2.2
    Date: 06/11/2015
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • April 28, 2015

    Communication Line Installation Between 245-15F and a Temporary Shed
    CX(s) Applied: B1.7
    Date: 04/28/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • March 2, 2015

    Garrison Substation Equipment Acquisition
    CX(s) Applied: B1.7
    Date: 03/02/2015
    Location(s): Montana
    Offices(s): Bonneville Power Administration

  • January 6, 2015

    Chemawa Substation Equipment Acquisition
    CX(s) Applied: B1.7
    Date: 01/06/2015
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • August 28, 2014

    Remove IT Equipment from Research Ridge Building 3
    CX(s) Applied: B1.7
    Date: 41879
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • July 14, 2014

    Equipment Installations at Multiple Substations and Radio Facilities
    CX(s) Applied: B1.7
    Date: 07/14/2014
    Location(s): Washington, Washington, Washington, Washington, Washington
    Offices(s): Bonneville Power Administration

  • July 10, 2014

    Advanced Test Reactor (ATR) Electronic Message Board Installation
    CX(s) Applied: B1.7
    Date: 41830
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • June 30, 2014

    Harney Substation Digital Communications Upgrade
    CX(s) Applied: B1.7
    Date: 06/30/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • June 11, 2014

    Maintain/Repair SPR Radio Communications Network, 2014-2017
    CX(s) Applied: B1.7
    Date: 06/11/2014
    Location(s): CX: none
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 9, 2014

    Replace West Hackberry Ported Coax at Northwest Perimeter (WH-OM-1194)
    CX(s) Applied: B1.7
    Date: 06/09/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 19, 2014

    Site Wide Card Access System Hardware and Software Upgrade
    CX(s) Applied: B1.7
    Date: 05/19/2014
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 5, 2014

    Slatt Substation Meter and Communication Equipment Installation
    CX(s) Applied: B1.7
    Date: 05/05/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 29, 2014

    Keeler and Troutdale Substations Communication Equipment Additions
    CX(s) Applied: B1.7
    Date: 12/30/2013
    Location(s): Oregon, Oregon
    Offices(s): Bonneville Power Administration

  • April 24, 2014

    Meter Installation at Fossil Lake Solar Project
    CX(s) Applied: B1.7
    Date: 04/24/2014
    Location(s): Oregon
    Offices(s): Bonneville Power Administration

  • April 1, 2014

    S8G Prototype Refueling Overhaul
    CX(s) Applied: B1.3, B1.5, B1.7, B1.14, B1.30, B1.31, B2.1, B2.4, B2.5, B6.3
    Date: 04/01/2014
    Location(s): New York
    Offices(s): Naval Nuclear Propulsion Program

  • January 27, 2014

    Replace Fiber Optic Receivers/Transmitters, etc. on S&S Systems
    CX(s) Applied: B1.7
    Date: 01/27/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 26, 2014

    Routine Maintenance Activities
    CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, B1.13, B1.15, B1.16, B1.17, B1.21, B1.22, B1.23, B1.27, B1.28, B1.31, B1.32, B2.1, B2.2, B2.3, B2.5
    Date: 01/26/2014
    Location(s): New Jersey
    Offices(s): Princeton Site Office