You are here

Categorical Exclusion Determinations: B1.32

Existing Regulations

B1.32: Traffic flow adjustments
Traffic flow adjustments to existing roads (including, but not limited to, stop sign or traffic light installation, adjusting direction of traffic flow, and adding turning lanes), and road adjustments (including, but not limited to, widening and realignment) that are within an existing right-of-way and consistent with approved land use or transportation improvement plans.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • March 5, 2010

    California-City-San Clemente
    CX(s) Applied: A1, A9, A11, B1.32, B5.1
    Date: 03/05/2010
    Location(s): San Clemente, California
    Office(s): Energy Efficiency and Renewable Energy

  • February 23, 2010

    Denver West Parkway/Marriott Boulevard Intersection Improvements; National Renewable Energy Laboratory Tracking Number 09-044
    CX(s) Applied: B1.32
    Date: 02/23/2010
    Location(s): Lakewood, Colorado
    Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

  • February 10, 2010

    Utah State Energy Program - Energy Improvement Fund
    CX(s) Applied: A9, A11, B1.32, B1.35, B2.1, B2.2, B5.1
    Date: 02/10/2010
    Location(s): Utah
    Offices(s): Golden Field Office

  • February 2, 2010

    Tennessee-City-Clarksville
    CX(s) Applied: A9, A11, B1.32, B2.5, B5.1
    Date: 02/02/2010
    Location(s): Clarksville, Tennessee
    Office(s): Energy Efficiency and Renewable Energy

  • January 12, 2010

    Ohio-City-Elyria
    CX(s) Applied: A1, A9, A11, B1.32, B5.1
    Date: 01/12/2010
    Location(s): Elyria, Ohio
    Office(s): Energy Efficiency and Renewable Energy

  • December 29, 2009

    Energy Efficiency Retrofits: Heating, Ventilation, Air Conditioning Upgrade, Building Controls, Lighting, Outreach and Education, and Energy Efficiency Remodeling
    CX(s) Applied: A9, B1.32, B2.5, B5.1
    Date: 12/29/2009
    Location(s): Peoria, Alabama
    Office(s): Energy Efficiency and Renewable Energy

  • December 22, 2009

    Yavapai-Apache Nation of the Camp Verde Indian Reservation Street Lighting Retrofits
    CX(s) Applied: B1.32, B5.1
    Date: 12/22/2009
    Location(s): Arizona
    Office(s): Energy Efficiency and Renewable Energy

  • December 21, 2009

    Energy Efficiency and Conservation Strategy, Energy Efficiency Retrofits, and Develop a Sub-Grant Program
    CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1
    Date: 12/21/2009
    Location(s): Missoula, Montana
    Office(s): Energy Efficiency and Renewable Energy

  • December 18, 2009

    Koyukuk Native Village Street Lighting
    CX(s) Applied: B1.32, B5.1
    Date: 12/18/2009
    Location(s): Alaska
    Office(s): Energy Efficiency and Renewable Energy

  • December 16, 2009

    Energy Efficiency and Conservation, Update Traffic Lights, Grants, and Rebate Program
    CX(s) Applied: A1, A9, A11, B1.32, B5.1
    Date: 12/16/2009
    Location(s): Longmont, Colorado
    Office(s): Energy Efficiency and Renewable Energy

  • December 9, 2009

    Street Light Retrofits, Energy Efficiency Upgrades, and Heating, Ventilation, Air Conditioning Upgrades
    CX(s) Applied: A9, A11, B1.32, B2.5, B5.1
    Date: 12/09/2009
    Location(s): Gilbert, Arizona
    Office(s): Energy Efficiency and Renewable Energy

  • November 30, 2009

    Energy Efficiency Retrofits and Upgrades, and Purchase Electrical Vehicles
    CX(s) Applied: A1, B1.32, B2.5, B5.1
    Date: 11/30/2009
    Location(s): Vancouver, Washington
    Office(s): Energy Efficiency and Renewable Energy

  • November 30, 2009

    Energy Efficiency Lighting Retrofits and Lighting Control Upgrades, Historic Preservation Educational Materials, Bike Path
    CX(s) Applied: A1, A9, B1.32, B2.5, B3.6, B5.1
    Date: 11/30/2009
    Location(s): Idaho Falls, Idaho
    Office(s): Energy Efficiency and Renewable Energy

  • November 23, 2009

    Mount Vernon's Energy Efficiency Retrofits and Programs
    CX(s) Applied: B5.1, B1.32, A1, A9, A11
    Date: 11/23/2009
    Location(s): Mount Vernon, New York
    Office(s): Energy Efficiency and Renewable Energy

  • November 17, 2009

    Energy Audit, Revolving Loan Program, Mortgage Buy-Down Program, Energy Efficiency Retrofits, and Fund Program
    CX(s) Applied: A1, A9, A11, B1.32, B5.1
    Date: 11/17/2009
    Location(s): Des Moines, Iowa
    Office(s): Energy Efficiency and Renewable Energy

  • November 17, 2009

    Des Moines' Energy Efficiency Retrofits and Programs
    CX(s) Applied: B1.32, B5.1, A1, A9, A11
    Date: 11/17/2009
    Location(s): Des Moines, Iowa
    Office(s): Energy Efficiency and Renewable Energy

  • November 12, 2009

    Tanana Chiefs Conference Traffic Signals and Street Lighting
    CX(s) Applied: B5.1, B1.32
    Date: 11/12/2009
    Location(s): Alaska
    Office(s): Energy Efficiency and Renewable Energy

  • November 12, 2009

    Greenville's Streetlight Retrofit and Synchronization
    CX(s) Applied: B1.3, B1.32, B5.1
    Date: 11/12/2009
    Location(s): Greenville, Mississippi
    Office(s): Energy Efficiency and Renewable Energy

  • November 9, 2009

    Tempe's Consultants and Studies, Revolving Loan Program, Lighting/Heating, Ventilating, and Air Conditioning/Streetlight Retrofits, Audits, and Solar Photovoltaic
    CX(s) Applied: B5.1, B1.32, B2.5, A9, A11
    Date: 11/09/2009
    Location(s): Tempe, Arizona
    Office(s): Energy Efficiency and Renewable Energy

  • November 3, 2009

    Provo's Energy Efficiency Upgrades
    CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1
    Date: 11/03/2009
    Location(s): Provo, Utah
    Office(s): Energy Efficiency and Renewable Energy

  • November 2, 2009

    Coquille Tribe Street Lighting Project
    CX(s) Applied: B5.1, B1.32
    Date: 11/02/2009
    Location(s): Coquille Tribe, Oregon
    Office(s): Energy Efficiency and Renewable Energy

  • August 7, 2009

    GA-City-Consolidated Government of Augusta-Richmond
    CX(s) Applied: A9, A11, B1.32, B2.5, B5.1
    Date: 08/07/2009
    Location(s): Augusta-Richmond, Georgia
    Office(s): Energy Efficiency and Renewable Energy

  • November 22, 2001

    Michigan-City-Livonia
    CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1
    Date: 11/22/2001
    Location(s): Michigan
    Offices(s): Energy Efficiency and Renewable Energy